[1]. Rommert Dekker, “Applications of maintenance optimization models: a review and analysis”, Reliability Engineering and System 51 (1996) p229-p240.
[2]. K.Hitomi, “Manufacturing System Engineering”,(1983),pp.156.
[3]. James V. Jones, “Integrated Logistics Support Handbook”pp.84 (1995)
[4]. Muther,”Systematic Layout Planning” (1973)
[5]. Mayers F.E, “Motion and Time Study: Improving Work Methods and Management”, (1992).
[6]. Blanchard, B.S., “System engineering management”, (1991).
[7]. Dorfman, M.,”System and Software Requirement Engineering”, (1990), IEEE Computer Society Press, pp.4-16.
[8]. Francis, R.L. and White, J.A, “Facility Layout and Location an Analytical Approach, Prentice-Hall, Inc., Englewood Cliffs, New Jersey, (1974).
[9]. K. Hitomi, “Manufacturing System Engineering”, (1983) pp.156
[10]. JR East Technical Review-No.2, (2006)
[11]. Stefano Carrese, Giuseppe Ottone,” A Model for the Management of a Train Fleet”, (2005)
[12]. 張煥光,”中運量捷運系統維修計畫” 民國78年
[13]. 林宜勝,”機廠維修設備配置與設計”,捷運技術半年刊,第十一期,第19-27頁,民國83年。[14]. 台北市政府捷運局,”規劃手冊”,民國81年。
[15]. 台北捷運公司,”維修計畫”,民國95年。
[16]. 田榮生,”北投機廠電器設備維修場設計”,民國81年,第39-42頁。
[17]. 楊善國,”可靠度工程概論”,民國94年。
[18]. 王文賓,”考量安全性之捷運系統電聯車維修排程模式”,民國95年。
[19]. 勞定華,”台北捷運系統機廠與列車維修計畫之配合”,捷運技術半年刊第十一期,第28-33頁,民國83年。[20]. 劉志明、溫于平、簡禎富等,”捷運系統機廠佈設最適化之研究”,民國87年。
[21]. 陳勇全、林仁生,”軌道機電系統概論” 民國93年
[22]. 李萬億、蘇培坤,“捷運機廠規設理念及相關維修設備”,捷運技術半年刊,民國95年[23]. 黃漢榮,”軌道工程學”,民國94年
[24]. 張思、鄭國雄,”軌道工程” 民國91年
[25]. 賴聰乾,”排程問題動態規劃法之研究”,行政院國家科學委員會專題研究計畫,民國86年。
[26]. 台北市政府捷運工程局,”捷運常用詞彙”,台北市政府捷運工程局( 1991)。
[27]. 台北大眾捷運股份有限公司,”高運量捷運系統專業詞彙”,台北大眾捷運股份有限公司(2000)。
[28]. 台北大眾捷運股份有限公司,”淡中線列車運行計劃”,台北大眾捷運股份有限公司(1998)。
[29]. 蔡文昉,”大眾運輸排班系統之研究”,國立交通大學碩士論文,民國89年。