田依林,2007。企业新产品开发的风险分析与防范,武漢理工大學學報,訊息與管理工程版,29(1),160-163。
陈弘,2006。企业新产品开发风险及其评估模型,系統工程,24(7),102-104。
陳文亮、蘇于倫,2007。 應用模糊綜合評價法輔助產品設計方案決選模式之研究,設計學研究,10(2), 73-94。许锋、李虎、刘佳、巩亚东、王宛山,2005。制造业新产品开发风险评价及其防范,機械製造,43(491),48-50。
张卓,2005。产品开发内在风险的灰色评价模型,研究與發展管理,17(1),37-42。
赵飞, 2009。论企业新产品开发阶段的风险管理,湖南有色金屬,25(4),74-76。
Abdullah L. &; Najib L., 2014. A new type-2 fuzzy set of linguistic variables for the fuzzy analytic hierarchy process, Expert Systems with Applications, 41(7), 3297-3305.
Afonso P., Nunes M., &; Paisana A., 2008. The influence of time-to-market and target costing in the new product development success, International Journal of Production Economics, 115(2), 559-568.
Al‐Bahar J. F. &; Crandall K. C., 1990. Systematic Risk Management Approach for Construction Projects, Journal of Construction Engineering and Management, 116(3), 533¬546.
Balezentis T., Zeng S., 2013. Group multi-criteria decision making based upon interval-valued fuzzy numbers: An extension of the MULTIMOORA method, Expert Systems with Applications, 40 (2), 543-550.
Brans J. P. &; Vincke P., 1985. A Preference Ranking Organization Method: (The PROMETHEE Method for Multiple Criteria Decision-Making), Management science, 31(6), 647-656.
Buyukozkan G., Feyzıoglu O., 2004. A fuzzy-logic-based decision-making approach for new product development, International Journal of Production Economics, 90(1), 27-45.
Carbone T. A. &; Tippett D. D., 2004. Project risk management using the project risk FMEA, Engineering Management Journal, 16(4), 28-35.
Calantone R. J., Benedetto C. A. &; Schmidt J. B., 1999. Using the analytic hierarchy process in new product screening, Journal of Product Innovation Management, 16(1), 65-76.
Chen H. H., Lee A. H. &; Tong Y., 2007. Prioritization and operations NPD mix in a network with strategic partners under uncertainty, Expert Systems with Applications,33(2), 337-346.
Chen T.-Y., 2013. A signed-distance-based approach to importance assessment and multi-criteria group decision analysis based on interval type-2 fuzzy set, Knowledge and Information Systems, 35(1), 193-231.
Chen T.-Y., 2014. A PROMETHEE-based outranking method for multiple criteria decision analysis with interval type-2 fuzzy sets, Soft Computing, 18(5), 923-940.Yeh T. M., Pai F. Y. &; Liao C. W., 2014. Using a hybrid MCDM methodology to identify critical factors in new product development, Neural Computing and Applications, 24(3¬4), 957-971.
Chen S.-M. &; Lee L.-W., 2010. Fuzzy multiple attributes group decision-making based on ranking values and the arithmetic operations of interval type-2 fuzzy sets, Experts System with Application, 37 (1), 824-833
Chiang T. A. &; Che Z. H, 2010. A fuzzy robust evaluation model for selecting and ranking NPD projects using Bayesian belief network and weight-restricted DEA, Expert Systems with Applications, 37(11), 7408-7418.
Chin K. S., Tang D. W., Yang J. B., Wonga S. Y. &; Wanga H., 2009. Assessing new product development project risk by Bayesian network, Expert Systems with Applications with a systematic probability generation methodology, 36(6), 9879-9890.
Clemen R. T. &; Reilly T., 2001. Making hard decisions with decision tools, Druxbury Thomson Learning.
Cooper L. G., 2000. Strategic marketing planning for radically new products, Journal of Marketing, 64(1), 1-16.
Cooper R. G., Edgett S. J., &; Kleinschmidt E. J., 1999. New product portfolio management: practices and performance, Journal of Product Innovation Management, 16(4), 333-351.
Crawford C. M. &; Benedetto C. A. Di, 2008.New products management, Tata McGraw-Hill Education.
Doering D. S. &; Parayre R., 2000. Identification and assessment of emerging technologies, Wharton on Managing Emerging Technologies.
Hohenegger, C., &; Schär, C. (2007). Predictability and error growth dynamics in cloud-resolving models, Journal of the Atmospheric Sciences, 64(12), 4467-4478.
Huang Y.-S., Liu L. C. &; Ho J. W.,2013. Decisions on new product development under uncertainties, International Journal of Systems Science, (ahead-of-print), 1-10.
Hung L. C., Chiang T. A., Che Z. H. &; Wang H. S., 2009. Global Perspective for Competitive Enterprise, Springer London.
Kahraman C., Buyukozkan G. &; Ates N. Y., 2007. A two phase multi-attribute decision-making approach for new product introduction, Information Sciences, 177(7), 1567-1582.
Kahraman C., Oztayşi B., Uçal Sarı I., &; Turanoglu E., 2014. Fuzzy analytic hierarchy process with interval type-2 fuzzy sets, Knowledge-Based Systems, 59, 48-57.
Kallman J., 2005. What Is Risk? Risk Management, 52(10).
Kayis B., Zhou M., Savci S., Khoo Y. B., Ahmed A., Kusumo R. &; Rispler A., 2007. IRMAS - development of a risk management tool for collaborative multi-site, multi-partner new product development projects, Journal of Manufacturing Technology Management, 18(4), 287-414.
Keizer J. A., Halman J. I. &; Song M., 2002. From experience: applying the risk diagnosing methodology, Journal of Product Innovation Management, 19(3), 213-232.
Keizer J. A. , Vos J. P. &; Halman J. I., 2005. Risks in new product development: devising a reference tool, R&;D Management, 35(3), 297-309.
Lam P. K. &; Chin K. S., 2005. Identifying and prioritizing critical success factors for conflict management in collaborative new product development, Industrial Marketing Management, 34(8), 761-772.
Leithhead B. S., 2000. Product development risks, The Internal Auditor, 57(5), 59-61.
Liu P.-L., Chen W.-C. &; Tsai C.-H., 2005. An empirical study on the correlation between the knowledge management method and new product development strategy on product performance in Taiwan’s industries, Technovation, 25(6), 637-644.
Nadkarni S., &; Shenoy P. P., 2001. A Bayesian network approach to making inferences in causal maps, European Journal of Operational Research, 128(3), 479-498.
Mehrjerdi Y. Z. &; Dehghanbaghi M., 2013. A dynamic risk analysis on new product development process, International Journal of Industrial Engineering &; Production Research, 24(1), 17-35.
Mobey A. &; Parker D., 2002. Risk evaluation and its importance to project implementation, Work Study, 51(4), 202-206.
Mua J., Peng G. &; MacLachlan D. L., 2009. Effect of Risk Management Strategy on NPD Performance, Technovation, 29(3), 170-180.
Mullins J. W. &; Sutherland D. J., 1998. New product development in rapidly changing markets: An exploratory study, Journal of Product Innovation Management, 15(3), 224-236.
Mustafa M. A. &; Al-Bahar J. F., 1999. Project risk assessment using the analytic hierarchy process, IEEE Transactions on Engineering Management, 38(1), 46-52.
Ogawa S. &; Piller F. T., 2006. Reducing the risks of new product development, MIT Sloan Management Review, 47(2), 65-71.
Park Y. H., 2010. A study of risk management and performance measures on new product development, Asian Journal on Quality, 11(1), 39-48.
Persson J. S., Mathiassen L., Boeg J., Madsen T. S. &; Steinson F., 2009. Managing risks in distributed software projects: an integrative framework, Engineering Management, 56(3), 508-532.
Saltelli A., Chan K. &; Scott, 2000. Sensitivity analysis (Vol. 134), Wiley.
Song M. &; Noh J., 2006. Best new product development and management practice in the Korean high-tech industry, Industrial Marketing Management, 35(3), 262-278.
Tang D., Yang J-B, Chin KS, Wong ZSY &; Liu X, 2011. A methodology to generate a belief rule base for customer perception risk analysis in new product development, Expert Systems with Applications, 38(5), 5373-5383.
Tchankova L., 2002. Risk identification – Basic stage in risk management, Environment Management and Health, 13(3), 290-297.
Ulrich K. T., &; Eppinger S., (2012) Product Design and Development, McGraw-Hill Higher Education.
Vose D., 1996. Quantitative risk analysis: A guide to Monte Carlo simulation modeling, John Wiley &; Sons.
Zhang Z. &; Zhang S, 2013. A novel approach to multi attribute group decision making based on trapezoidal interval type-2 fuzzy soft sets, Applied Mathematical Modelling, 37(7), 4948-4961.