|
[1] Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences 17, 292-311.
[2] Biskup, D., Simons, D. and Jahnke, H. (2003). The effect of capital lockup and customer trade credits on the optimal lot size – a confirmation of the EOQ. Computers & Operations Research 30, 1509-1524.
[3] Brigham, E. F. (1995). Fundamentals of Financial Management, 7 th edition, Dryden. Press, Orlando, Florida.
[4] Chang, C. T., Ouyang, L. Y. and Teng, J. T. (2003). An EOQ model for deteriorating items under supplier credits linked to ordering quantity. Applied Mathematical Modeling 27(12), 983-996.
[5] Chang, H. C., Ho, C. H., Ouyang, L. Y. and Su, C. H. (2009). The optimal pricing and ordering policy for an integrated inventory model when trade credit linked to order quantity. Applied Mathematical Modeling 33(7), 2978-2991.
[6] Chung, K. J., Chen, Y. C. and Lin, S. D. (2011). A two-warehouse inventory model under trade credit in the supply chain management. African Journal of Business Management 5(7), 2625-2643.
[7] Eroglu, A. and Ozdemir, G. (2007). An economic order quantity model with defective items and shortage. International Journal of Production Economics 106, 544-549.
[8] Goyal, S. K. (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research 15(1), 107-111.
[9] Goyal, S. K. (1985). Economic order quantity under conditions of permissible delay in payment. Journal of the Operational Research Society 36, 335-335.
[10] Goyal, S. K. (1988). A joint economic-lot-size model for purchaser and vendor: a comment. Decision Sciences 19, 236-241.
[11] Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: a comment. European Journal of Operational Research 82, 209-210.
[12] Haley, C. W. and Higgins, R. C. (1973). Inventory policy and trade credit financing. Management Science 20(4), 464-471.
[13] Hall, R. W. (1983). Zero Inventories, Dow Jones-Irwin, Homewood Illinois.
[14] Ho, C. H., Ouyang, L. Y. and Su, C. H. (2008). Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit. European Journal of Operational Research 187(2), 496-510.
[15] Hsu, W. K. and Yu, H. F. (2010). An EOQ model with imperfective quality items under an announced price increase. Journal of the Chinese Institute of Industrial Engineers 28(1), 34-44.
[16] Huang, C. K. (2001). An integrated inventory model for supplier and retailer with defective items. Journal of Information & Optimization Sciences 22(3), 509-519.
[17] Huang, C. K. (2002). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning & Control 13(4), 355-361.
[18] Huang, C. K., Cheng, T. L., Kao, T. C. and Goyal, S. K. (2011). An integrated inventory model involving manufacturing setup cost reduction in compound Poisson process. International Journal of Production Research 49(4), 1219-1228.
[19] Huang, Y. F. (2003). Optimal retailer’s ordering policies in the EOQ model under trade credit financing. Journal of the Operational Research Society 54, 1011-1015.
[20] Huang, Y. F. (2007). Economic order quantity under conditionally permissible delay in payment. European Journal of Operational Research 176, 911-924.
[21] Huang, Y. F. and Chung, K. J. (2003). Optimal replenishment and payment policies in the EOQ model under cash discount and trade credit. Asia-Pacific Journal of Operational Research 20, 177-190.
[22] Ouyang, L. Y. and Chang, H. C. (2000). Impact of investing in quality improvement on (Q,r,L) model involving imperfect production process. Production Planning and Control 11, 598-607.
[23] Ouyang, L. Y., Chang, H. C. and Chen, C. K. (2002). Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Computers & Operations Research 29, 1701-1717.
[24] Ouyang, L. Y., Ho, C. H. and Su, C. H. (2008). Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity. International Journal of Production Economics 115(1), 151-162.
[25] Ouyang, L. Y., Ho, C. H. and Su, C. H. (2009). An optimization approach for joint pricing and ordering problem in an integrated inventory system with order-size dependent trade credit. Computers & Industrial Engineering 57(3), 920-930.
[26] Ouyang, L. Y., Wu, K. S. and Ho, C. H. (2006). The single-vendor single-buyer integrated inventory problem with quality improvement and lead time reduction – minimax distribution-free approach. Asia-Pacific Journal of Operational Research 23(3), 407-424.
[27] Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cose reduction. Operations Research 34, 137-144.
[28] Rosenblatt, M. J. and Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE Transactions 18, 2-9.
[29] Roy, A., Maity, K., Kar, S. and Maiti, M. (2009). A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment. Computers & Industrial Engineering 56(1), 87-96.
[30] Su, C. H., Ouyang, L. Y., Ho, C. H. and Chang, C. H. (2007). Retailer’s inventory policy and supplier’s delivery policy under two-level trade credit strategy. Asia-Pacific Journal of Operational Research 24(5), 613-630.
[31] Wu, K. S. and Ouyang, L. Y. (2000). Defective units in (Q, r, L) inventory model with sub-lot sampling inspection. Production Planning & Control 11(2), 179-186.
[32] Wu, K. S. and Ouyang, L. Y. (2001). (Q, r, L) inventory model with defective items. Computers & Industrial Engineering 39, 173-185.
[33] Wu, K. S., Ouyang, L. Y. and Ho, C. H. (2007). Integrated vendor-buyer inventory system with sublot sampling inspection policy and controllable lead time. International Journal of Systems Science 38(4), 339-350.
|