[1] 台灣電力公司網站,http://www.taipower.com.tw。
[2] K. Aoki, K. Nara, M. Iton, T. Satoh and H. Kuwabara, “A new algorithm for service restoration in distribution system,” IEEE Transactions on Power Delivery, Vol. 4, No. 3, July 1989.
[3] H. Saadat, Power System Analysis, McGraw-Hill, 1999.
[4] P. Okanik, B. Kurth, and J. H. Harlow, “An update on the paralleling of OLTC power transformers,” Proceedings of the 1999 IEEE Transmission and Distribution Conference, Vol. 2, pp. 871-875, April 1999.
[5] 林憲章,變電所主變或整個變電所負載轉供分析,國立清華大學電機研究所碩士論文,1996。[6] R. S. Girgis and C. D. Ko, “Calculation techniques and results of effects of GIC currents as applied to two large power transformers,” Proceedings of the 1991 IEEE Transmission and Distribution Conference 1991, pp. 553 —559, Sept 1991.
[7] A. R. Bergen and V. Vittal, Power System Analysis, Pearson Education, 1999.
[8] 林正仁,有關161kV電壓相角及配電線轉供問題報告,台電台北供電區營運處運轉課技術報告。
[9] 69kV電力系統運用入門,台灣電力公司供電處運維課。
[10] 鄭強,同步發電機併聯電控迴路探討,電驛協會會刊,第六期,第83-88頁1997年12月。
[11] 翁基振,兩P/S轄區併聯瞬間之研討,台電嘉南供電區營運處。
[12] 陽明P/S轄區系統單線圖,台電台北供電區營運處運轉課,2002。
[13] 吳天得,變電工程,全華科技圖書,1994年3月。
[14] ASPEN OneLiner V5 & V1988.5 User’s Manual, Advanced Systems for Power Engineering, 1988.
[15] 91年夏季尖峰負載分界點電力潮流單線圖,台電台北供電區營運處運轉課,2002。
[16] 台電基隆區域調度中心,ADCS匯流排電壓日報表,台灣電力公司,2003。
[17] 台電基隆區域調度中心,供電系統變壓器一覽表,台灣電力公司,2003。
[18] 台電基隆區域調度中心,饋線日報表,台灣電力公司,2003。
[19] 台電基隆區域調度中心,變電所旬報,台灣電力公司,2003。
[20] 台電基隆區域調度中心,各一次變電所電驛標置,台灣電力公司,2003。
[21] 變壓器技術資料,日本電機工業會,第18-31頁,2003。
[22] T. Gonen, Electric Power Distribution System Engineering, McGraw-Hill, 1986.
[23] J. Shao, N. D. Rao, and Y. Zhang, “An expert system for secondary distribution system design,” IEEE Transactions on Power Delivery, Vol. 6, No.4, pp.1607-720, August 1995.
[24] 配電技術手冊-架空配電線路設計,台灣電力公司。
[25] 配電技術手冊-地下配電線路設計,台灣電力公司。
[26] 電力系統運轉操作章則彙編,台灣電力公司,2000年8月。
[27] R. L. Sullivan, Power System Planning, McGraw-Hill, 1979.
[28] 羅欽煌,工業配電,全華科技圖書,1992年9月。
[29] 吳清通,靜止形無效電力補償裝置在電力系統之運轉近況,供電技術報導第三期,台灣電力公司供電處,第35-48頁,1986年1月。
[30] 洪瑤,SC運用的探討,供電技術報導第十六期,台灣電力公司供電處,第165-181頁,1985年4月。
[31] B. R. Williams, “Distribution capacitor automation provides integrated control of customer voltage levels and distribution reactive power flow,” Proceedings of the 1995 Power Industry Computer Application Conference, pp. 215—220, May 1995.
[32] A. Kramer and J. Ruff, “Transformers for phase angle regulation considering the selection of on-load tap-changers,” IEEE Transactions on Power Delivery, Vol.13, No. 2, pp. 518—525, April 1998.
[33] V. P. Thornley and N. J. Hiscock, “Improved voltage quality through advances in voltage control techniques,” Proceedings of the 2001 Developments in Power System Protection, pp. 355—358, April 2001.
[34] P. Kang and B. Birtwhistle, “Condition assessment of power transformer on load tap changers (OLTC) using wavelet analysis,” Proceedings of the 2001 Power Industry Computer Applications, pp. 330—335, May 2001.
[35] Y. Fukuyama and H. Yoshida, “A particle swarm optimization for reactive power and voltage control in electric power systems,” Proceedings of Congress on Evolutionary Computation, Vol. 1, pp. 87-93, May 2001.
[36] M. Eremia, P. Simon, D. Petricica, and D. Gheorghiu, “Some aspects of hierarchical voltage-reactive power control,” Records of IEEE Power Engineering Society Summer Meeting, Vol. 2, pp. 872-880, July 2001.
[37] F. C. Lu and Y. Y. Hsu, “Fuzzy dynamic programming approach to reactive power/voltage control in a distribution substation,” IEEE Transactions on Power Systems, Vol. 12 No. 2, pp. 681—688, May 1997.
[38] M. Bjelogrlic, M. S. Calovic, B. S. Babic, and P. S. Ristanovic, “Application of Newton's optimal power flow in voltage/reactive power control,” Proceedings of Power Industry Computer Application Conference, pp. 105—111, May 1989.
[39] RPDC功能檢討分析,台灣電力公司基隆區域調度中心。
[40] W. H. Kersting and W. H. Phillips, “Distribution feeder line models,” IEEE Transactions on Industry Applications, Vol. 31, No 4, pp. 715-720, August 1995.
[41] F. C. Lu and Y. Y. Hsu, “Reactive power/voltage control in a distribution substation using dynamic programming,” Proceedings of IEEE Transmission and Distribution Conference, Vol. 142 No. 6, pp. 639—645, Nov 1995.
[42] Z. C. Hu, X. F. Wang, and H. Y. Chen, “Time-interval based volt/VAr control in distribution systems,” Proceedings of the 2002 Power System Technology, Vol. 1, pp. 81-85, Oct 2002.
[43] 變電工程作業手冊,台灣電力公司輸配電工程處。
[44] 許文興、林裕梁,汽電共生系統責任分界點之電驛標置協調,電驛協會會刊,第十三期,第39-51頁,2001年6月。[45] R. H. Liang and C. K. Cheng, “Dispatch of main transformer ULTC and capacitors in a distribution system,” IEEE Transactions on Power Delivery, Vol.16 No. 4, pp. 625—630, Oct 2001.
[46] 李宏任,實用保護電驛,全華科技圖書,1999年5月。
[47] A. E. Efthymiadis, O. E. Roennspiess, and J. A. Guerra, “Simulation of protective relay performance under short-circuit and transient swing conditions,” IEEE Transactions on Industry Applications, Vol. 26, No. 6, pp. 1108-1115, Nov.-Dec. 1990.
[48] A. J. Urdaneta, L. G. Perez, and H. Restrepo, “Optimal coordination of directional overcurrent relays considering dynamic changes in the network topology,” IEEE Transactions on Power Delivery, Vol. 12, Issue: 4 , pp. 1458 - 1464, Oct. 1997.
[49] C. S. Chen, et al., “Protective relay setting of the tie line tripping and load shedding for the industrial power system,” IEEE Transactions on Industry Applications, Vol. 36, No.5, pp. 1226-1234, October 2000.
[50] R. Ramaswami and P. F. McGuire, “Integrated coordination and short circuit analysis for system protection,” IEEE Transactions on Power Delivery, Vol. 7, No. 3, pp.1112—1120, July 1992.
[51] 林義讓、林清樺,電機設備保護,全華科技圖書,1992年5月。
[52] 楊嘉榮,配電線代送時接地過流電驛跳脫回路改善方案探討,電驛協會會刊,第七期,第81-87頁,1998年6月。