|
[1]Silver, E.A. and Peterson, R., “Decision Systems for Inventory Management and Production Planning”, Wiley: New York, 1985. [2]Yang, G., Ronald, R.J.and Chu, P., “Inventory models with variable lead time and present value,” European Journal of Operational Research, Vol. 164, Issue 2, 16 July 2005, 358-366 [3]Das, C., “Effect of lead time on inventory: A static analysis,” Operational Research Quarterly, Vol. 26, 1975, 273-282. [4]Foote, B., Kebriaei, N. and Kumin, H., “Heuristic policies for inventory ordering problems with long and randomly varying lead time,” Journal of Operations Management, Vol. 7, 1988, 115-124. [5]Magson, D.W., “Stock control when the lead time cannot be considered constant,” Journal of the Operational Research Society, Vol. 30, Issue 4, 1979, 317-322. [6]Pan, J.C. and Hsiao, Y.C., “Inventory models with backorder discounts and variable lead time,” International Journal of Systems Science, Vol. 32, No. 7, 2001, 925-929. [7]Scarf, H., “A min-max solution of an inventory problem. In Studies in The Mathematical Theory of Inventory and Production”. Stanford University Press: California, 1958, Chap. 12. [8]Gallego, G. and Moon, I., “The distribution free newsboy problem: Review and extensions,” Journal of Operational Research Society, Vol. 44, 1993, 825-834. [9]Tersine, R. J., Principles of Inventory and Materials Management, North Holland: New York, 1982. [10]Liao, C.J. and Shyu, C.H., “Analytical determination of lead time with normal demand,” International Journal of Operations and Production Management, Vol. 11, 1991, 72-78. [11]Naddor, E., Inventory Systems, John Wiley: New York, 1966. [12]Ben-Daya, M. and Raouf, A., “Inventory models involving lead time as a decision variable,” Journal of Operational Research Society, Vol. 45, 1994, 579-584. [13]Krajewski, L.J. and Ritzman, L.P., Operations Management: Strategy and Analysis, Addison-Wesley, Reading, MA, 1996. [14]Moon, I. and Yun, W., “The distribution free job control problem,” Computers and Industrial Engineering, Vol. 32, 1997, 109-113. [15]Ouyang, L.Y., and Wu, K.S., “A minimax distribution free procedure for mixed inventory model with variable lead time,” International Journal of Production Economics, Vol. 56-57, 1998, 511-516. [16]Pan, J.C., Hsiao, Y.C. and Lee, C.J., “Inventory models with fixed and variable lead time,” Journal of the Operational Research Society, Vol. 53, 2002, 1048-1053. [17]Pan, J.C., Yang, J.S., “Just-in-time purchasing an integrated inventory model involving deterministic variable lead time and quality improvement investment,” International Journal of Production Research, Vol. 42, No.5, 2004, 853-863. [18]Ouyang, L.Y., Chuang, B.R. and Lin, Y.J., “Mixture inventory model involving variable lead time and controllable backorder rate,” Computers & Industrial and Engineering, Vol. 40, 2001, 339-348. [19]Ouyang, L.Y., Yen, N.C. and Wu, K.S., “Mixture inventory model with backorders and lost sales for variable lead time,” Journal of the Operational Research Society, Vol. 47, 1996, 829-832. [20]Moon, I., Choi, S., 1998. A note on lead time and distributional assumptions in continuous review inventory models. Computers and Operations Research 25, 1007–1012. [21]Hariga, M., Ben-Daya, M. “Some stochastic inventory models with deterministic variable lead time.” European Journal of Operational Research 113, 1999, 42–51. [22]Porteus, E.L. “Optimal lot sizing, process quality improvement and setup cost reduction.” Operations Research 34, 1986,137–144. [23]Rosenblatt, M.J., Lee, H.L. “Economic production cycles with imperfect production processes.” IIE Transactions 18, 1986, 48–55. [24]Keller, G., Noori, H. “Impact of investing in quality improvement on the lot size model.” OMEGA International Journal of Management Sciences 15, 1988, 595–601. [25]Hwang, H., Kim, D.B., Kim, Y.D. “Multiproduct economic lot size models with investments costs for setup reduction and quality improvement.” International Journal of Production Research 31, 1993, 691–703. [26]Hong, J.D., Hayya, J.C. “Joint investment in quality improvement and setup reduction.” Computers and Operations Research 22, 1995, 567–574. [27]Ouyang, L.Y., Chang, H.C. “Impact of investing in quality improvement on (Q,r,L) model involving the imperfect production process.” Production Planning and Control 11 (6) , 2000, 598–607. [28]Ouyang, L.Y., Chen, C.K., Chang, H.C. “Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process.” Computers and Operations Research 29, 2002, 1701–1717. [29]Tripathy, P.K., Wee, W.M., Majhi, P.R. “An EOQ model with process reliability considerations.” Journal of the Operational Research Society 54, 2003, 549–554 [30]Rosenblatt, M.J., Lee, H.L. “Economic production cycles with imperfect production processes.” IIE Transactions 18, 1986, 48–55. [31]Hadley, G., Whitin, T. Analysis of Inventory Systems. Prentice-Hall, New Jersey, 1963. [32]Ouyang, L.Y., Wu, K.S., Ho, C.H., “An integrated vendor–buyer inventory model with quality improvement and lead time reduction,” International Journal of Production Economics, Vol. 108, 2007, 349-358. [33]Pan, J.C., Lo, M.C., Lin, K.C., and Hsu, J.W., ”Impact of Lead Time and Safety Factor in Mixed Inventory Models with Backorder Discounts,” Journal of Applied Sciences, Vol. 8, No. 3, 2008, 528-533. [34]Pan, J.C., Lo, M.C. and Hsiao, Y.C., “Optimal reorder point inventory models with variable lead time and backorder discount considerations,” European Journal of Operational Research, Vol. 158, 2004, 488-505. [35]Montgomery, D.C., Bazaraa, M.S., Keswani, A.I. “Inventory models with a mixture of backorders and lost sales.” Naval Research Logistics 20, 1973, 255–263.
|