Thai
1.Butsabong Charoenphanyothin, (2002), “Housing construction process using partial precast technique: a case study of Chonlada Ratantibeth housing project”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
2.Chanin Sae-Tieo, (2002), “Modular coordination design guideline for townhouse”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
3.Charnchai Thavatkiattisak, (2004), “Comparison between reinforced concrete load bearing wall system casting on site and casting from factory: a case study of Aur Arthon low income housing project at Prachaniwet and Huamark, Bangkok metropolis”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
4.Danoocha Sundararjun, (2002), “A conditional analysis in housing construction utilizing precast concrete column and beam components with extruded fiber-cement wall panel: a case study of Pimarnchon II, phase 3, Khon Kaen province”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University.
5.Mamee Tobarameekul, (1997), “A study of prefabrication systems for building construction in Bangkok Metropolitan area”, Master Thesis, Department of civil engineering, Faculty of engineering, Chulalongkorn University, Thailand.
6.Nawin Nakasiri, (1999), “Comparison study of load-bearing wall pre-fabrication component between manufactured component and on site component”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
7.Panurat Pongam, (2005), “Comparative study of housing construction technology between load-bearing wall precast concrete structure: a case study of Passorn housing project and Suetrong housing project, Rangsit-klong 3, Patum Thani province”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
8.Parinya Suppasri, (2005), “Strategy for construction cost analysis”, Sor. Asia Place (1989) Co., Ltd.
9.Prateep E.T. Mekin, (1977), “A prefabrication system for housing”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
10.Sompop Majiswala, (1998), “The evaluation of semi-prefabricated housing in Bangkok Metropolitan and suburbs”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
11.Suphasit Preukchot, (2004), “Application of partial precast construction techniques for low income detached housing project: a case study of Aur Arthon housing housing project located on rangsit khlong 3, Pathum Thani province”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand
12.Trirat Jarutach, (1999), “Industrialized building for middle income family in the Bangkok Metropolitan Region”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
13.Thanapon Sintuyon, (2002), “Appliction of prefabricated sketon components in conventional housing construction”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
14.Visuit Jiradumkeang, (2007), “Construction cost data”, Wan Kawee Co., Ltd.
15.Visuit Jiradumkeang. (2007), “Cost Estimation Handbook”, Wan Kawee Co., Ltd.
16.Yothin Ungkoon, (2002), “An Ecvaluation on housing semi pre-fabrication construction system, steel skeleton structure infilled with aerated concrete block: a case study of baan maneekaew, Chon Buri”, Master Thesis, Department of housing, Faculty of architecture, Chulalongkorn University, Thailand.
Chinese
1.內政部建築研究所,1999年03月,「預鑄建築工程實務」。
2.內政部統計處,1999年08月,「內政統計月報」。
3.王華弘、吳文堂、陳佑霖,2007年01月,現代營建,「預鑄工法於我國發展之困境與展望」,325期,第16-22業。4.卓大鈞,1999年04月,自動化專輯,「國宅採預鑄 品質、成本齊一」,195期,第22-25業。
5.卓進豐,2005年07月,「預鑄工法應用在科技廠房支個案研究」,中華大學碩士論文。6.林勇,「土木建築工程師工實習」,1984年 06 月。
7.林勇,「模板工程設計施工」,1984年 06 月。
8.陳永成,1999年04月,自動化專輯,「預鑄工法 明日之路」,195期,第10-21業。
9.曾銘文,1997年05月30日,「中高層建築採預鑄系統工法成本結構之研究」,國立中央大學碩士論文。10.黃斌,李政憲,陳太農,陳長庚,1996年12月,「建築預鑄單元應用實況調查與分析」,內政部建築研究所,第3-4業。
11.葉文凱,1998年06月,工法快遞,「加強預鑄工法之應用」,185期,第50-52業。
12.臺北市政府工務局,2003年 11 月,「臺北市工料分析手冊」。
English
1.F. E. Rafaes, (1969), “A study of a method for joining precast concrete members”, master thesis, Construction Engineering and Management, School of Civil Engineering, Asian Institute of Technology, Thailand.
2.J. L. Camba, and R. Meli, (1993), Precast/Prestressed concrete institute journal, ‘‘Case study of the performance of prestressed concrete buildings during the 1985 Mexico earthquake.’’, Vol. 34 No. 3, pp. 58-71.
3.J. K. Iverson, and N. M. Hawkins, (1994), Precast/Prestressed concrete institute journal, "Performance of precast/prestressed concrete building structures during Northridge earthquake.", Vol. 39 No. 2, pp. 38–55.
4.Narong Rerkshanindana, (1987), “Prefabrication in housing construction”, master thesis, Construction Engineering and Management, School of Civil Engineering, Asian Institute of Technology, Thailand.