1. 紀明佳,”半導體封裝廠生產效率之評估分析”,國立高雄第一科技大學運籌管理研究所,碩士論文,2008。2. 梁宇帆,”薄膜電晶體陣列廠機台配置機制之構建”,國立交通大學工業工程與管理學系,碩士論文,2006。3. 熊雅意,”晶圓代工廠考慮週期時間限制之機台規劃研究”,國立交通大學工業工程與管理學系,博士論文,2004。4. 蔡杭助,”結合基因演算法與離散事件模擬求解即時性平行機台之派工規劃問題”,國立成功大學製造工程研究所,博士論文2002。5. 鄭書豪,”CONWIP生產管制架構於IC封裝產業之應用”,國立清華大學工業工程與工程管理學系,碩士論文,1998。6. Bretthauer, K. M., “Capacity planning in networks of queues with manufacturing applications.”, Mathematical Computer Modeling Vol. 12, No. 12, pp. 35-46, 1995.
7. Carson, J. S., “AutoStat Output Statistical Analysis for AutoMod Users”, Proceedings of the 1996 Winter Simulation Conference, 492-499, 1996.
8. Chen, Chun-Hung, Lin, Jianwu,”Simulation Budget Allocation for Further Enhancing the Efficiency of Ordinal Optimization.”, Discrete Event Dynamic Systems: Theory and Applications, 10, 251–270, 2000.
9. Connors , D. P. and Feigin, G. E. and Yao, D. D.,” A queueing network model for semiconductor manufacturing.”, IEEE Transaction on Semiconductor Manufacturing, Vol. 9, No. 3, pp. 412-427, 1996.
10. Dudewicz, E. J. and Dalal, S. R. “Allocation of Observations in Ranking and Selection with Unequal Variances”, Sankhya, B37: pp. 28-78, 1975.
11. Gen, M. and Cheng, R., “Genetic Algorithms and Engineering Optimization.”, John Wiley & Sons, New York, 2002.
12. Grewal, N. S., Bruska, A. C., Wulf, T. M., and Robinson, J. K.,” Integrating Targeted Cycle-Time Reduction into the Capital Planning Process.”, Proceeding of the 1998 Winter Simulation Conference, pp.1005-1010, 1998.
13. Henderson, S.G. and Nelson, B.L. (Eds.), “Handbook in OR & MS”, Vol. 13Copyright,2006.
14. Holland, J., “Adaptation in Natural and Artificial Systems”, University of Michigan Press, 1975.
15. Kenneth A. de Jong, William M. Spears and Diana F. Gordon, “Using Genetic Algorithms for Concept Learning”, Machine Learning, 13,161-188, 1993.
16. Liu, J., Yang, F., Wan, H., Fowler , John W., “Capacity planning through queueing anaylsis and simulation-based statistical methods:a case study for semiconductor wafer fabs.”, International Journal of Production Research 10.1080/00207543.2010.501828,2010.
17. Kocher, R., “Capacity Planning in the Face of Production-Mix Uncertainty,” Proceeding International Symposium on Semiconductor Manufacturing, Santa Clara, California, U.S.A.,pp.73-76,1999.
18. Lee , Loo-Hay, Chew, Ek-Peng, Teng, Suyan, Chen, Yankai, ” Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem.”, European Journal of Operational Research 189 (2008) 476–491
19. Leyuan Shi, “Sigurdur’Olafsson. Nested Partitions Method Theory and Applications.”, Springer Science+Business Media, LLC, 2009
20. Rinott, Y. “On Two-stage Selection Procedures and Related Probability Inequalities”, Communications in Statistics A7, pp. 799-811, 1978.
21. Umi Kalsom Yusof, Safaai Deris,”Optimizing Machine Utilization in Semiconductor Assembly Industry using Constraint-Chromosome Genetic Algorithm.”,IEEE,978-1-4244-6719-7/10,2010.
22. Vollman, T., Berry, W., Whybark, D., Jacobs, F, “Manufacturing Planning and Control for Supply Chain Management.”, McGraw-Hill, 5th international edition, 2004.