|
[1] B. Alidaee, and N.K. Womer, "Scheduling with time dependent processing times: review and extensions", Journal of the Operational Research Society, Vol. 50, pp. 711-720 (1999)
[2] K.R. Baker, and D. Trietsch, Principles of Sequencing and Scheduling , John Wiley and Sons, pp. 301-303 (2009)
[3] K.R. Baker, and D. Trietsch, Principles of Sequencing and Scheduling , John Wiley and Sons , pp. 181-182 (2009)
[4] S. Browne, and U. Yechiali, "Scheduling deteriorating jobs on a single processor", Operations Research, Vol. 38, pp. 495-498 (1990)
[5] D. Chen, S. Li, and G. Tang, "Single machine scheduling with common due date assignment in a group technology environment", Mathematical Computation Modeling, Vol. 25, pp. 81-90 (1997)
[6] T.C.E. Cheng, Q. Ding, and B.M.T. Lin, "A concise survey of scheduling with time-dependent processing times", European Journal of Operation Research, Vol. 152 , pp. 1-13 (2004)
[7] T.C.E. Cheng, C.C. Wu, and W.C. Lee, "Some scheduling problems with deteriorating jobs and learning effects", Computers and Industrial Engineering, Vol. 54, pp. 972-982 (2008)
[8] C.C. Chiou, M.J. Yao, and J.T. Tsai, "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain", International Journal of Production Economics, Vol. 108, pp. 314-328 (2007)
[9] A.X. Guo, and J.B. Wang, "Single machine scheduling with deteriorating jobs under the group technology assumption", Internal Journal of Pure and Applied Mathematics, Vol. 18 (2), pp. 225-231 (2005)
[10] J.N.D. Gupta, and S.K.Gupta, "Single facility scheduling with nonlinear processing times", Computers and Industrial Engineering, Vol. 14, pp. 387-393 (1988)
[11] I. Ham, K. Hitomi, and T. Yoshida, "Group Technology: Applications to Production Management", Kluwer-Nijhoff, Boston (1985)
[12] L.Y. Kang, and C.T. Ng, "A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs", International Journal of Production Economics, Vol. 109, pp. 180-184 (2007)
[13] C. Koulamas, and G.J. Kyparisis, "Single-machine scheduling problems with past-sequence-dependent delivery times", International Journal of Production Economics, Vol. 126 , pp. 264-266 (2010)
[14] A.S. Kunnathur, and S.K. Gupta, "Minimizing the makespan the late start penalties added to processing times in a single facility scheduling problem", European Journal of Operational Research, Vol. 47, pp. 56-64 (1990)
[15] W.C. Lee, Y.H. Chung, and C.C. Wu, "Scheduling deteriorating jobs on a single machine with release times", Computers and Industrial Engineering, Vol. 54, pp. 441-452 (2008)
[16] W.C. Lee, and Z.S. Lu, "Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs", Applied Mathematics and Computation, Vol. 218, pp. 8750-8757 (2012)
[17] W.C. Lee, C.C. Wu, C.C. Wen, and Y.H. Chung, "A two-machine flowshop makespan scheduling problem with deteriorating jobs", Computers and Industrial Engineering, Vol. 54, pp. 737-749 (2008)
[18] M. Liu, F.F. Zheng, C.B. Chu, and Y.F. Xu, "Single-machine scheduling with past-sequence-dependent delivery times and release times", Information Processing Letters, Vol. 112, pp. 835-838 (2012)
[19] G. Mosheiov, "Scheduling jobs under simple linear deterioration", Computers and Operations Research Journal, Vol. 21, pp. 653-659 (1994)
[20] C.T. Ng, and T.C.E. Cheng, "Group scheduling with controllable setup and processing times: minimizing total weighted completion time", Annals of Operations Research, Vol. 133, pp. 147-163 (2005)
[21]M.L. Pinedo, Scheduling Theory, Algorithms, and Systems, Springer, pp.84 (2008)
[22] J. Schaller, "Scheduling on a single machine with family setups to minimize total tardiness", International Journal of Production Economics, Vol. 105, pp. 329-344 (2007)
[23] T.G. Voutsinas, and P.P. Costas, "Scheduling jobs with values exponentially deteriorating over time", International Journal of Production Economics, Vol. 79, pp. 163 (2002)
[24] X.L. Wang, and T.C.E. Cheng, "Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan", European Journal of Operational Research, Vol. 178, pp. 57-70 (2007)
[25] J.B. Wang, W.J. Gao, L.Y. Wang, and D. Wang, "Single machine group scheduling with general linear deterioration to minimize the makespan", The International Journal of Advanced Manufacturing Technology, Vol. 43, pp. 146-150 (2009)
[26] J.B. Wang, L. Lin, and F. Shan, "Single-machine group scheduling problems with deteriorating jobs", The International Journal of Advanced Manufacturing Technology, doi:10.1007/s00170-007-1255-x (2007)
[27] J.B. Wang, C.T.D. Ng, T.C.E. Cheng, and L.L. Liu, "Minimizing total completion time in a two-machine flow shop with deteriorating jobs", Applied Mathematics and Computation, Vol. 180, pp. 185-193 (2006)
[28] S. Webster, and K.R. Baker, "Scheduling groups of jobs on a single machine", Operations Research, Vol. 43, pp. 692–703 (1995)
[29] C.C. Wu, and W.C. Lee, "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration", International Journal of Production Economics, Vol.103, pp. 572-584 (2006)
[30] C.C. Wu, and W.C. Lee, "Single-machine group-scheduling problems with deteriorating setup times and job-processing times", International Journal of Production Economics, Vol. 115, pp. 128-133 (2008)
[31] C.C. Wu, Y.R. Shiau, and W.C. Lee, "Single-machine group scheduling problems with deterioration consideration", Computers and Operation Research, Vol. 35, pp. 1652-1659 (2008)
[32] F. Xu, A.X. Guo, J.B. Wang, and F. Shan, "Single machine scheduling problem with linear deterioration under group technology", International Journal of Pure and Applied Mathematics, Vol. 28, pp. 401-406 (2006)
|