|
[1].Scho‥nwiese, C.D., J. Grieser and S. Tro‥mel, 2003, “Secular Change of Extreme Monthly Precipitation in Europe”, Theoretical and Applied Climatology, p. 245-250. [2].Emanuel, K, 2005. ‘‘Increasing Destructiveness of Tropical Cyclones Over the Past 30 Years,’’ Nature, p. 686-688. [3].Ramirez, A. and N. Altay, 2008. ‘‘An Empirical Analysis of the Effect of Natural Disasters on the Performance and Equity Risk of the Firm,’’ XXV Conference Proceedings, Pan-Pacific Business Association, p. 141–143. [4].Horwich, G, 2000. ‘‘Economic Lessons of the Kobe Earthquake”, Economic Development and Cultural Change, p. 521-542. [5].Oliver, RK and Webber, MD, 1982, ”Supply-Chain Management: Logistics Catches Up with Strategy”, Outlook, Booz, Allen and Hamilton Inc., reprinted in Logistics: The Strategic Issues, ed. M Christopher (1992), Chapman Hall, London, p. 63-75. [6].Jones, T.C. and Riley, 1985, “Using Inventory for Competitive Advantage through Supply Chain Management”, International Journal of Physical Distribution and Materials Management, Vol. 15, No. 5, p. 16-26. [7].Stevens, 1989, "Integrating the Supply Chain", International Journal of Physical Distribution &; Logistics Management, Vol. 19, p.29-48. [8].Sunil Chopra and ManMohan S. Sodhi , 2004, “Manage risk to avoid Supply-Chain Breakdown”, MIT Sloan Management Review, Vol. 46, No.1, p.54 [9].Tang, C.S., 2006. “Perspectives in Supply Chain Risk Management”, International Journal of Production Economics, Vol. 103, p. 451-488. [10].Kleindorfer, P.R. and Saad, Gh., 2005. “Managing disruption risks in supply chains”, Production and Operations Management, 14, p. 53-68. [11].Riddalls, C. and Bennett, S., 2002. “Production–Inventory System Controller Design and Supply Chain Dynamics”, International Journal of System Science, Vol. 33, p. 181-195. [12].Rice, J. and Caniato, F., 2003. “Building a secure and resilient supply network”, Supply Chain Management Review, Vol. 7, p. 22-30. [13].Hendricks, K.B. and Singhal, V.R., 2003. “The effect of supply chain glitches on shareholder wealth”, Journal of Operation Management, Vol. 21, p. 501-523. [14].Horwich, G, 2000, ‘‘Economic Lessons of the Kobe Earthquake’’, Economic Development and Cultural Change, Vol. 48, p. 521-542. [15].Mitroff, I.I. and M.C. Alpaslan, 2003, ‘‘Preparing for Evil’’, Harvard Business Review, Vol. 81, p. 109-115. [16].Roshan Gaonkar, N. Viswanadham, 2004, “A conceptual and analytical framework for the management of risk in supply chains [C]”, IEEE International Conference on Roboties &; Automation, p. 2699-2701. [17].Kleindorfer PR, Saad G H, 2005, “Managing Disruption Risks in Supply Chains [J]”, Production and Operations Management Society, p. 53-68. [18].Tomlin B.t and Snyder LV., 2008, “On the Value of a Threat Advisory System for Managing Supply Chain Disruptions”, Working Paper, Kenan-Flagler Business School, University of North Carolina-Chapel Hill, USA. [19].Snyder LV, Shen Z-J Max, 2006, “Managing Disruption to Supply Chains”, Forthcoming in The Bridge (National Academy of Engineering). [20].Alex J, Ruiz-Torres, Farzad Mahmoodi, 2007, “The optimal number of suppliers considering the costs of individual supplier failures”, Omega, p. 104-115. [21].Bundschuh M., Klabjan D., Thurston D.L, 2003, “Modeling Robust and Reliable Supply Chains”, Working paper, University of Illinois at Urbana-Champaign. [22].Xiao t Oi X, 2004, “Price Competition, Cost and Demand Disruptions and Coordination of a Supply Chain with One Manufacturer and Two Competing Retailers”, Omega, p. 301-312. [23].Xu M, H’Qi X. T., Zhang H, Gao C, 2003 ,”The Demand Disruption Management Problem For a Supply Chain System with Nonlinear Demand Functions”, Journal of systems science and systems engineering, p. 82-97. [24].Snyder LV., Scaparra MP., DASKIN MS.,2006, “Planning for distributions in supply chain networks [J]”, Operations Research, p. 234-257. [25].易海燕, 2007,“供&;#24212;&;#38142;&;#39118;&;#38505;的管理与控制研究”,西南交通大&;#23398;, 碩士論文 [26].Ruiz-Torres AJ, Mahmoodi F, 2007, “The Optimal Number of Suppliers Considering the Costs of Individual Supplier Failures [J]”, The International Journal of Management Science, p. 104-115. [27].Burke, G.J., Carrillo, J.E., Vakharia, A.J., 2007, “Single Versus Multiple Supplier Sourcing Strategies”, European Journal of Operational Research, p. 95-112. [28].Yu H S, Zeng A Z, Zhao L D, 2007, “Single or Dual Sourcing: Decision-Making in The Presence of Supply Chain Disruption Risks [J]”. The International Journal of Management Science, p. 788-800. [29].Sarkar, Ashutosh Mohapatra, Pratap K.J,. 2009, “Determining The Optimal Size of Supply Base with The Consideration of Risks of Supply Disruptions [J]”, Production Economics, p. 122-135. [30].Ruiz-Torres A J, Mahmoodi F, 2007, “The Optimal Number of Suppliers Considering The Costs of Individual Supplier Failures [J]”. The International Journal of Management Science, p. 104-115. [31].Andrew C. Pan, 1989, “Allocation of Order Quantity among Suppliers”, Journal of Purchasing &; Materials Management, Vol. 25, No. 3, p. 120-150. [32].Vaidyanathan Jayaraman, Rajesh Srivastava, WC Benton, 2000, “Supply-Chain Management for Recoverable Manufacturing Systems”, Interfaces, p. 125. [33].Hong, J.D., Hayya, J.C., Kim, S.L, 1992, “JIT Purchasing and Setup Reduction in an Integrated Inventory Model”, International Journal of Production Research, p. 255-266. [34].Ramasesh, R.V., J.K. Ord, J.C. Hayya, A.C. Pan, 1993, “Note: Dual Sourcing with Nonidentocal Suppliers”, Naval Research Logistic, Vol. 40, No. 2, p. 279-288. [35].Kawtummachai R., Nguyen Van Hop. N.V, 2005, “Order Allocation in a Multiple-Supplier Environment”, Production Economics, p. 231-238. [36].Ezgi Aktar Demirtas, Ozden Ustun, 2008, “Analytic Network Process and Multi-Period Goal Programming Integration in Purchasing Decisions”, Computers &; Industrial Engineering, p. 677-690.
|