|
參考文獻
1.IEEE Committee Report, ‘Proposed Definitions of Terms for Reporting and Analyzing Outages of Electrical Transmission and Distribution Facilities and Interruptions’ , IEEE Trans. , Vol. PAS-87, PP. 1318-1323, May 2003. 2.T.L. Huang and C. H. Chang, ‘Reliability Evaluation Using Dynamic Programming’ , International Journal of Information and Technology, PP. 47-54, May 2006. 3.AIEE Committee Report, ‘Application of Probability Methods to Generating Capacity Problem’ , AIEE Trans. , Vol. PAS-79, PP. 1165-1182, 2003. 4.C.D. Galloway and L.L. Gawer , ‘Computer Design of Single Area Generation Expansions’ , IEEE Trans. Vol. PAS-83, PP. 305-311, April 2002. 5.H. Halperin and H. A Adler, ‘ Determination of Reserve Generating Capacity’ , AIEE Trans. Vol. PAS-77, PP. 530-544, August 2004. 6.D. Patton and D.W. Holditch, ‘ Reliability of Generation Supply’ , IEEE Trans Vol. PAS-87, PP. 1979-1803, September 2011. 7.J.D. Hall, R.J. Ringlee, and A.J. Wood, ‘Frequency and Duration Methods for Power System Reliability Calculation, Pt. I : Generation System Model’ , IEEE Trans. PAS-87, PP. 1787-1796, September 2003. 8.R.R. Booth, ‘Power System Simulation Model Based on Probability Analysis’ , IEEE Trans. , Vol. PAS-91, PP, 62-69, 2012. 9.J. Endrenyi, ‘ Reliability model in Electric Power System’ , A Wiley-Interscience publication, 2012. 10.V.M. Cook, C.D. Galloway, M.J. Steinberg and A.J. Wood, ‘ Determination of Reserve Requirements of Two Interconnected Systems’ , IEEE Trans. , Vol. PAS-92, PP. 18-33, 2012. 11.G.S. Vasslee and N. Tibbets, ‘Analysis of Generating Capacity Reserve Requirements for Interconnected Power System’ , IEEE Trans. Vol. PAS-91, PP. 638-649, 2002. 12.A.M. Adamson, A. L. Desell and L. L. Garver, ‘Generation Reserve Value of Interconnections’ , IEEE Trans. PAS-96, No.2, PP. 337-346, March/April, 2004. 13.H. T. Spears, K.L. Hicks and S. T. Y. Lee, ‘Probability of Loss of load for Three Areas’ , IEEE Trans. Vol. PAS-89, PP. 521-526, 1999. 14.C.K. Pang and A.J. Wood, ‘Multi-Area Generation System Reliability Calculations’ , IEEE Trans. Vol. PAS-94, No.2, PP. 508-517, March/April, 2005. 15.C.K. Pang and A.J. Wood, ‘Multi-Area Power System Reliability Calculation : Extensions and Examples’ , Paper No. A 75 535-5, IEEE PES Summer Power Meeting, July, 2011. 16.C.K. Pang and A.J. Wood, R.L. Watt and J.A. Bruggeman, ‘Multi-Area Generation Reliability Studies’ , Paper No. A 78 546-4, IEEE PES Summer Power Meeting, July, 2011. 17.L.R. Ford and D.R. Fulkerson, ‘Flow in Network’ , Princeton University Press, 2012. 18.T.L. Huang and Y.T. Hsiao, ‘Reliability of Multiple PQ Disturbances’ , Proceedings of IEEE/PES Transmission and Distribution Conference and Exhibition, Aug, 2005. 19.G. Calabrese, ‘ Generating Reserve Capacity Determined by the Probability Method’ , AIEE Trans. , Vol. PAS-66, PP. 1439-1450, 1998. 20.T.L. Huang, K.T. Lee and T.Y. Hwang, ‘System Reliability Evaluation Via Greg Method’ , International Journal of Information and Technology, PP. 39-46, May 2006.
|