參考文獻
[1]Alpan, G., R. Larbi &; B. Penz (2011) A bounded dynamic programming approach to schedule operations in a cross docking platform. Computers &; Industrial Engineering, Vol.60, pp.385-396.
[2]Bakker, M., J. Riezebos &; R. H. Teunter (2012) Review of inventory systems with deterioration since 2001. European Journal of Operational Research, Vol.221, pp.275-284.
[3]Banerjee, A. (1986) A joint economic-lot-size- model for purchaser and vendor. Decision Sciences, Vol.17, pp.292-311.
[4]Ben-Daya, M. &; A. Al-Nassar (2008) An integrated inventory production system in a three-layer supply chain. Production Planning &; Control, Vol.19, pp.97-104.
[5]Ben-Daya, M., M. Darwish &; K. Ertogral (2008) The joint economic lot sizing problem: Review and extensions. European Journal of Operational Research, Vol.185, pp.726-742.
[6]Ben-Daya, M., R. As’ad &; M. Seliaman (2013) An integrated production inventory model with raw material replenishment considerations in a three layer supply chain. International Journal of Production Economics, Vol.143, pp.53-61.
[7]Bessler, S.A. &; A. J. Veinott (1966) Optimal policy for a multi-echelon inventory model. Naval Research Logistics Quarterly, Vol.13, pp.355-389.
[8]Chung, C. J. &; H.-M. Wee (2011) Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system. International Journal of Production Economics, Vol.129, pp.195-203.
[9]Chung, C. J. (2013) Investigating imperfect process and demand effects on inspection scheduling and supply chain replenishment policy. Computers &; Industrial Engineering, Vol.64, pp.31-44.
[10]Chung, C. J.&; H. M, Wee.(2008) Scheduling and replenishment plan for an integrated deteriorating inventory model with stock-dependent selling rate. The International Journal of Advanced Manufacturing Technology, Vol.86, pp.155-168.
[11]Chung, K.-J. (2012) The integrated inventory model with the transportation cost and two-level trade credit in supply chain management. Computers &; Mathematics with Applications, Vol.64, pp.2011-2033.
[12]Clark , A. J. &; H Scarf (1960) Optimal Policies for a multi-echelon inventory problem.
Management Science, Vol.6, pp.475–490.
[13]Ghare, P. M. &; G. F. Schrader (1963) A model for an exponentially decaying inventory. Journal of Industrial Engineering, Vol.14, pp.238-243.
[14]Glock, C. H. (2012) The joint economic lot size problem: A review. International Journal of Production Economics, Vol.135, pp.671-686.
[15]Goyal, S. K. (1977) An integrated inventory model for a single supplier-single customer Problem. International Journal of Production Research, Vol.15, pp.107-111.
[16]Goyal, S. K., C.-K. Huang &; K.-C. Chen (2003) A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning &; Control, 14, 596-602.
[17]He, Y. &; X. Zhao (2012) Coordination in multi-echelon supply chain under supply and demand uncertainty. International Journal of Production Economics, Vol.139, pp.106-115.
[18]Hill, R. M. (1997) The single-vendor single-buyer integrated production-inventory model with a generalised policy. European Journal of Operational Research, Vol. 97, pp.493-499.
[19]Hill, R. M. (1999) The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem. International Journal of Production Research, Vol. 37, pp.2463-2475.
[20]Hsu, P. H., H. M. Wee &; H. M. Teng (2010) Preservation technology investment for deteriorating inventory, International Journal of Production Economics, Vol.124, pp.388-394.
[21]Huang, C. K. (2004) An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration.International Journal of Production Economics, Vol.91, pp.91-98.
[22]Hudnurkar, M., S. Jakhar &; U. Rathod (2014) Factors Affecting Collaboration in Supply Chain: A Literature Review. Procedia - Social and Behavioral Sciences, Vol.133, pp.189-202.
[23]Khanra, S., S. K. Ghosh &; K. S. Chaudhuri (2011) An EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment. Applied Mathematics and Computation, Vol.218, pp.1-9.
[24]Khouja, M. (2003) Optimizing inventory decisions in a multi-stage multi-customer supply chain. Transportation Research Part E: Logistics and Transportation Review, Vol.39, pp.193-208.
[25]Lee, H. L. &; C. Billington (1993) Material Management in Decentralized Supply Chains. Operations Research, Vol. 41, pp.835-947.
[26]Lee, S. &; D. Kim (2014) An optimal policy for a single-vendor single-buyer integrated production–distribution model with both deteriorating and defective items. International Journal of Production Economics, Vol. 147, pp.161-170.
[27]Lee, S.-D. &; Y.-C. Fu (2014) Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost. Transportation Research Part E: Logistics and Transportation Review, Vol.66, pp.23-35.
[28]Lee, W. (2005) A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. Omega, Vol.33, pp.163-174.
[29]Madadi, A., M. E. Kurz &; J. Ashayeri (2010) Multi-level inventory management decisions with transportation cost consideration. Transportation Research Part E: Logistics and Transportation Review, Vol.46, pp.719-734.
[30]Mathews, J. H. (1992) Numerical methods for mathematics, science and engineering. Englewood Cliff, New Jersey: Prentice-Hall.
[31]Nahmias, S. (1978) Perishable inventory theory : a Review. Operations Research, 30, pp.680-708.
[32]Pal, B., S. S. Sana &; K. Chaudhuri (2012) A three layer multi-item production–inventory model for multiple suppliers and retailers. Economic Modelling, Vol.29, pp.2704-2710.
[33]Raafat, F. (1991) Survey of literature on continuously deteriorating inventory models. Journal of the Operational Research Society, Vol.42, pp.27-37.
[34]Sajadieh, M. S., M. S. Fallahnezhad &; M. Khosravi (2013) A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system. International Journal of Production Economics, Vol.146, pp.738-744.
[35]Sana, S. S., J. A. Chedid &; K. S. Navarro (2014) A three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple items. Applied Mathematics and Computation, Vol.229, pp.139-150.
[36]Wang, S. P., Lee, W., &; C. Y. Chang (2012) Modeling the consignment inventory for a deteriorating item while the buyer has warehouse capacity constraint. International Journal of Production Economics, Vol.138, pp.284-292.
[37]Wee, H. M. &; G. A. Widyadana (2013) Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales. International Journal of Production Economics, Vol.143, pp.574-579.
[38]Wee, H. M. &; Y. S. Shum (1999) Model development for deteriorating inventory in material requirement planning systems. Computers &; Industrial Engineering, Vol.36, pp.219-225.
[39]Widyadana, G. A. &; H. M. Wee (2011) Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. Applied Mathematical Modelling, Vol.35, pp.3495-3508.
[40]Widyadana, G. A. &; H. M. Wee (2012) An economic production quantity model for deteriorating items with multiple production setups and rework. International Journal of Production Economics, Vol.138, pp.62-67.
[41]Yan, C., A. Banerjee &; L. Yang (2011) An integrated production–distribution model for a deteriorating inventory item. International Journal of Production Economics, Vol.133, pp.228-232.
[42]Yang, P. C., S. L. Chung, H. M. Wee, E. Zahara &; C. Y. Peng (2013) Collaboration for a closed-loop deteriorating inventory supply chain with multi-retailer and price-sensitive demand. International Journal of Production Economics, Vol.143, pp.557-566.
[43]Yu, J. C. P. (2013) A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits. International Journal of Production Economics, Vol.143, pp.403-409.
[44]Yu, J. C. P., H. M. Wee &; K. J. Wang (2008) Supply chain partnership for three echelon. Journal of Industrial and Management Optimization, Vol.4, pp.827-842.
[45]古民尊,2012,“損耗性商品考慮不完美重工及價格變動之最佳補貨策略”,中原大學工業與系統工程學系碩士學位論文。
[46]紀慶來,2004,“考慮製成品質損失之供應鏈聯合經濟批量模式”,成功大學製造工程研究所碩士學位論文。[47]桂華明,2013,“物料運輸成本的聯合訂貨和生產批量模型研究”,東亞論壇季刊。[48]黃惠民、楊伯中,2008,“供應鏈存貨系統設計與管理”,滄海書局出版。
[49]葉菀暄,2011,“緊急狀況下損耗性產品之存貨與運送系統”,中原大學工業與系統工程學系碩士學位論文。[50]蘇義雄,2011,“物流與運籌管理供應鏈管理的基礎”,華泰文化出版。