1.AASHTO:http://construction.transportation.org/
2.Al-Abdulrazzak A., Bubshait and AhmadAbdulaziz., “Design Quality Management Activities.”Journal of Professional Issues in Engineering Education and Practice, 1996.
3.Barlow J.K., “Effective Management of Engineering Design.”J. of Management in Engineering,ASCE, Vol.1,No.2, pp.51-66, 1985.
4.Carroll S.J., Schneier C.E., Performance appraisal and review systems: The identification, measurement, and development of performance in organizations, Scott, Foresman, 1982.
5.Chang S. and Ibbs C.W.A., “Development of Consultant Performance Measures for Design Projects.”Project Management Journal, Vol.29, No.2,pp.39-54, 1998.
6.Cheung K.T., Kuen J.L.F. and Skitmore M.F., “Multi-criteria evaluation model for the selection of architectural consultants.”Constr. Mgmt and Econ., pp.569-580, 2002.
7.CII., “Objectives Matrix Values for Evaluation of Design Effectiveness.”,2000.
8.Costa B., Formoso C.T., Kagioglou, M. and Alarcon, L.F.D., “Performance Measurement Systems for Benchmarking in the Construction Industry.”Proc. 12th Annual Lean Construction Conference. Helsingor, Denmark, pp.451-463, 2004.
9.Cox F., Issa R.R.A., Ahrens D.R. “Management''s Perception of Key Performance Indicators for Construction.” J. of Construction Engineering and Management, ASCE., Vol. 129, No.2, pp.142-151, 2003.
10.Department of the Environmentand the RegionsTransport, “KPI Report for The Minister for Construction., 2000.
11.Drucker P., “Managing for Tomorrow-Managing in Turbulent Times.” Industry Week, Vol.205, pp.54-56, 1980.
12.FEDIC:http://www1.fidic.org/
13.Gilford J. P., Psychometric Methods, 2nd ed. New York, NY: McGraw-Hill, 1854.
14.Hair J.F., Black W.C., Babin B.J., Anderson R.E., Tatham R.L., Multivariate data analysis ,1998.
15.Institute Industry Construction, “CII Benchmarking & metrics Data Report.” CII, Texas, EUA, 2000.
16.Kaiser H.F., "An index of factorial simplicity" Journal of Psychometrika, Vol. 39, No.1, pp.31, 1974.
17.Szilagyi O.A., “Management and Performance”California: Goodyear, 1981.
18.Spearman C., "General Intelligence, " Objectively Determined and Measured, American Journal of Psychology, Vol. 15, No.2, pp.201, 1904.
19.Tesoroand, Tootson J.F., “Implementing Global Performance Measurement Systems: A Cookbook Approach.”, 2000.
20.Tinsley H.E.A., Tinsley D.J., "Uses of factor analysis in counseling psychology research." Journal of Counseling Psychology, vol.34, iss.4, pp.414, 1987.
21.王保進,「視窗版 SPSS 與行為科學研究」,2003。
22.王瑞壎,「學校知識管理指標建構之研究」,教育政策論壇,第九卷第三期,2006。23.刘丽莉,「评价指标选取方法研究」,河北建筑工程学院学报,第22卷第1 期,2004。
24.行政院公共工程委員會,「公共工程管理法令彙編」,行政院公共工程委員會出版,2004。
25.吳明隆,「SPSS統計應用學習實務-問卷分析與應用統計(深究經典版)」,知城出版社,2006。
26.吳繼熊,「工程設計顧問評選作業之研究」,中華大學營建管理研究所碩士論文,2002,第49 頁。27.周壽榮,「工程標案管理系統」,行政院公共工程委員會資料庫,2010。
28.邱文杰,「施工專案績效指標與機制之建立」,碩士論文,國立成功大學土木工程學系, 2002。29.俞立平、潘云涛、武夷山,「学术期刊评价指标选取若干问题的思考」,JOURNAI OF INTELLIGENCE,第28卷第3期,2008。
30.洪五爵,「建築工程施工計畫書章節架構探討之研究」,碩士論文,國立台灣大學,2006。31.何正文,「工程顧問公司設計專案績效評估之研究 — 應用平衡計分卡觀念」,碩士論文,國立台灣大學,2003。32.孫千惠,「工程主辦機關對設計服務廠商之評鑑機制-以臺北捷運工程局為例」,碩士論文,國立中央大學,2008。33.翁慶發,「公共工程監造品質之管理機制研究」,碩士論文,國立台灣科技大學,2007。34.張金輝,「承包商執行專案工程績效評估之研究」,碩士論文,國立台灣科技大學營建,2002。35.郭學書,「公共工程規劃設計品質評鑑指標之研究」,碩士論文,國立成功大學,2006。36.陳淑君,「公共工程統包採購制度執行最有利標選」,碩士論文,國立台灣大學,2001。
37.陳薇如,「工程顧問公司評鑑程序驗證」,碩士論文,國立成功大學,2007。38.游宗憲、賴美淑,「建構醫療品質指標方法文獻之回顧」,台灣醫學期刊,第13卷2 期,2009。
39.黃仁宏,「公共工程採購違失態樣之研究」,國立臺灣大學土木工程研究所碩士論文,2003。40.楊政賢,「工程機關辦理大型工程設計審查要項及機制研究」,國立中央大學,碩士論文,2009。41.葉連發,「專案工程設計品質管理系統建構之研究」,碩士論文,國立台灣科技大學營建工程研究所,2001。42.劉雲濤,「工程顧問公司評鑑制度之建立」,碩士論文,國立成功大學,2005。43.廖宗盛,「公共工程統包制度執行問題研析與改進對策之研究」,博士論文,國立臺灣大學,2001。44.蔡弘祥,「建築工程設計品質評量指標之研究」,碩士論文,國立台灣大學,2005。45.蕭由義,「軟組織損傷病患針灸治療滿意度之影響因素探討」,博士論文,國立台灣大學,2010。46.香港特別行政區政府發展局:http://www.devb.gov.hk/
47.行政院公共工程委員會,「建立機關委託技術服務廠商履約績效評鑑及管理機制」,行政院公共工程委員會委託研究報告,2009。
48.趙經武,「以型態管理模式建購設計品質管理機制之研究(以台灣高鐵車站標工程為例)」,碩士論文,國立中央大學,2003。