| 
[1.] Kimura, O. and Terada, H., 1981,”Design and analysis of pull system, a method of multi-stage production control,” International Journal of Production Research, Vol. 19, No. 3, pp. 241-253. [2.] Graves, S. C., 1981,”A review of production scheduling,”Operation Research, Vol. 29, No. 4, pp. 646-675. [3.] Spearman, M. L. , Woodruff, D. L. and Hopp, W. J.,1990,”CONWIP: a pull alternative to kanban,” International Journal of Production Research, Vol. 28, No. 5, pp. 879-894. [4.] Bonvik, A. M., Couch, C. E. and Gershwin, S. B., 1997,”A comparison of production-line control mechanisms,” International Journal of Production Research, Vol. 35, No. 3, pp. 789-804. [5.] Sule, D. R, 1997, Industrial scheduling, PWS Publishing Company, Boston. [6.] Baker, K. R., 1974, Introduction to sequencing and scheduling, John Wiley, New York. [7.] Baker, K. R., 1984,”Sequencing rules and due-date assignments in a job shop,” Management Science, Vol. 30, No. 9, pp. 1093-1104. [8.] Baker, K. R., 1984,”Improved decision rules in a combind system for minimizing job tardiness,” International Journal of Production Research, Vol. 22, No. 6, pp. 917-921. [9.] Blackstone, J. H. ,Phillips, D. T. and Hogg, G. L.,”A state-of-art survey of dispatching rules for manufacturing job shop operation,” International Journal of Production Research, Vol. 20, No. 1, pp. 27-45. [10.] Ramasesh, R. 1990,”Dynanic job shop scheduling: a survey of simulation research,”International Journal of Management science, Vol. 18, No. 1, pp. 43-57. [11.] Yang, K. K. and Sum, C. C., 1994, “A comparison of job shop dispatching rules using a total cost criterion,” International Journal of Production Research, Vol. 32, No. 4, pp. 807-820. [12.] 劉賓陽,趙平宜,1999 ,「電器容生產管理系統整合」,華容公司產學合作計畫成果報告。 [13.] Hopp, W. J. and Spearman, M. L.,1996, Factory Physics, McGraw-Hill, New York. [14.] Panwalker, S. S. and Isander, W., 1977,”A survey of scheduling rules,” Operations Research, Vol. 25, No. 1, pp. 45-61. [15.] Rodammer, F. A. and White, K. P., 1988,”A recent survey of production scheduling,”IEEE Transactions System, Man, and Cybernetics, Vol, 18, No. 6 , pp. 841-851. [16.] Sun, D. and Lin, L., 1994,”A dynamic job shop scheduling framework: a backward apporach," International Journal of Production Research, Vol. 32, No. 4, pp. 967-985. [17.] Dennis, P. C. and Shannon, R. E., 1995, Introduction to simulation using SIMAN, McGraw-Hill, New York. [18.] 王立志,系統化運籌與供應鍊管理,滄海書局,初版,台中,民國八十八年。 [19.] 潘錦平,軟體系統開發技術,儒林出版社,初版,台北,民國八十一年。 [20.] 張豐雄,結構化系統分析與設計,松崗電腦,初版,台北,民國八十三年。 [21.] 張百棧,生產管理,華泰書局發行,初版,台北,民國八十五年。 [22.] 黃慶祥,洪寶環,資料自動收集與商業自動化,松崗電腦,初版,台北,民國八十六年。 [23.] 潘錦平,軟體系統開發技術,儒林出版社,初版,台北,民國八十一年。 [24.] 曾煥釗,『MRP 電腦化物料需求計畫』,資訊工業策進會,pp.135-153 ,1992 。 [25.] 經濟部,經濟部商業資訊出版品參考叢書(協會,台北,民國八十五年六月。 [26.] 楊永陵,『我國企業資訊系統分析設計方法論採用之比較實證研究』,中國工業工程學會年會論文集,p.426~433 ,台灣,民國八十一年。 [27.] 張君龍,『企業現代化與國際化之全方位解決方案』,88 企業資訊化年鑑,開放時代通訊社,pp.42 ~50 ,民國八十八年。 [28.] A.Bauer ,R.Bowden ,J.Browne ,J.Duggan and G.Lyons ,Shop Floor Control From design to implementation ,Champan&Hall ,NY,1991. [29.] Groover ,M.P.,Automation , Production System and Computer Integrated Manufacturing ,Prentice-Hall,NJ,1987 。 [30.] Boehm,B. W. "A Spiral Model Of Software Development Enhancement",IEEE Computer ,Vol. 21. NO.5 , p64 ,May 1988 。 [31.] Melnyk,S.A.and P.L.Carter,Production Activity Control ,Richard D.Irwin,Inc. Publish,1987 。 [32.] teven A.Melnyk and Gray L.Ragate.“Order review / release :research issue and perspectives “,International journal of production research ,Vol.27 ,pp.1081-1096 ,1989 。
   |