1.Achugbue, J.O., and Chin, F.Y., Scheduling the Openshop to Minimize Mean Flow Time, SIAM Journal on Computing, 11 (1982) 709-20.2.Ahmadi, J.H., Ahmadi, R.H., Dasu, S. and Tang, C.S., Batching and scheduling jobs on batch and discrete processors, Operations Research, 39(4) (1992) 750-763.3.Barany, I., and Fiala, T., Nearly optimum solution of multimachine scheduling problems, Szigma Mathematika Kozgazdasagi Folyoirat, 19 (1982) 177-191(in Hungarian).4.Chen, B., and Strusevich, V.A., Worst-case analysis of heuristics for open shops with parallel machines, Eur. J. Oper. Res., 70 (1993) 379-390.5.Chang, S. Suang, Young, H. K., and Sang, H. Y., A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines, European Journal of Operational Research, 121 (2000) 179-192.6.Compbell, H.G., Dudek, R.A., and Smith, M.L., A heuristic algorithm for the ’N’ job ’M’ machine sequence problem, Management Science, 16 (1970) 630-637.7.Dannenbring, D.G., An evaluation of flowshop sequencing heuristics, Management Science, 23(11) (1977) 1174-1182.8.George, J. and Kyparisis, Koulamas, C., Open shop scheduling with makespan and total completion time criteria, Computers and Operational Research, 27 (2000) 15-27.9.George, J. and Kyparisis, Koulamas, C., Flow shop and open shop scheduling with a critical machine and two operations per job, European Journal of Operational Research, 127 (2000) 120-125.10.Glassey, C. R., and Weng, W. W., Dynamic batching heuristics for simultaneous processing, IEEE Transactions on Semiconductor Manufacturing, 4 (1991) 77-82.11.Gonzalez, T., and Sahni, S., Open shop scheduling to minimize finish time, Journal of the Association for Computing Machinery, 23 (1976) 665-79.12.Gonzalez, T. and Sahni, S., Flowshop and Jobshop Schedules: Complexity and Approximation, Operations Res., 26 (1978) 36-52.13.Graham, R.L., Lawler, E.L., Lenstra, J.K., and Rinnooy, K. A., Optimization and approximation in deterministic sequencing and scheduling: a survey, Annals of Discrete Mathematics, 5 (1979) 287-326.14.Graves, S. C., A review of production scheduling, Operations Research, 29(4) (1981) 646-675.15.Gupta, J.N.D., A functional heuristic algorithm for the flow shop scheduling problem, Operations Research Quarterly, 22 (1971) 39-47.16.Johnson, S. M., Optimal two and three stage production schedules with set-up time included, Naval Research Quarterly, 1 (1954) 61-68.17.Lee, C. Y., Cheng, T. C. E., and Lin, B. M. T., Minimizing the Makespan in the 3-Machine Assembly-type Flowshop Scheduling Problem, Management Science, 39(5) (1993) 616-625. 18.Nawaz, M., Enscore, R. J. T, and Ham, I., A heuristic algorithm for the m machine, n job flow shop sequence problem, Omega, 11(1) (1983) 91-95.19.Schuurman, Petra, and Woeginger, Gerhard J., Approximation algorithms for the multiprocessor open shop scheduling problem, Operations Research Letters, 24 (1999) 157-163. 20.Pinedo, M., Scheduling: Theory, Algorithms, and Systems, Prentice Hall, Englewood Cliffs, NJ, (1995).21.Sevastianov, SV, and Woeginger, GJ, Makespan minimization in open shops: a polynomial time approximation scheme, Mathematical Programming, 82 (1998) 191-8.22.Su, L. H., and Chou, F. D., Heuristic for scheduling in a two-machine bicriteria dynamic flowshop with setup and processing times separated, Production Planning and Control, 11(8) (2000) 806-819.23.Tautenhahn, T., Open-Shop-Problem mit Einheitsbear-beitungszeiten, Dissertation, Otto-Von-Guericke-Univer-sitat Mgdeburg, (1993).24.Webster, S.T., A General Lower Bound for the Makespan Problem, Europ. J. Ops Res., Vol., 89 (1996) 516-524.25.Yoshida, T, and Hitomi, K., Optimal two-stage production scheduling with setup times separated, IIE Transaction, 11 (1979) 261-263.
|