|
[1]Chang, Y.C. and Lee, Y.L. (2004) Machine scheduling with job delivery coordination. European Journal of Operational Research, 158, 470-487. [2]Chen, J.S. (2010) Integration of job scheduling with delivery vehicles routing. Information Technology Journal, 9(6), 1202-1206. [3]Chen, Z.L. (2010) Integrated Production and Outbound Distribution Scheduling: Review and Extensions. Operations Research. 58, 130-148. [4]Chen, Z.L. and Vairaktarakis, G.L. (1994) Integrated scheduling of production and distribution operations. Management Science, 51, 614-628. [5]Cheng, T.C.E. and Gordon, V.S. (1994) Batch delivery scheduling on a single machine. Journal of the Operational Research Society, 45, 1211-1215. [6]Cheng, T.C.E., Gordon, V.S. and Kovalyov, M.Y. (1996) Single machine scheduling with batch deliveries. European Journal of OperationalResearch, 94, 277-283. [7]Cheng, T.C.E. and Kahlbacher, H.G. (1993) Scheduling with delivery and earliness penalties. Asia-Pacific Journal of Operational Research, 10, 145-152. [8]Chung, D., Lee, K., Shin, K., and Park, J. (2005) A new approach to job shop scheduling problems with due date constraints considering operation subcontracts. International Journal of Production Economics, 98, 238–250 [9]Ganesharajah, T., Hall, N.G. and Sriskandarajah, C. (1998) Design and operational issues in AGV-served manufacturing systems. Annals of Operations Research, 76, 109-154. [10]Gharbi, A. and Haouari, M. (2002) Minimizing makespan on parallel machines subject to release dates and delivery times. Journal of Scheduling, 5, 329-355. [11]Garcia, J. M. and Lozano, S. (2005) Production and vehicle scheduling for ready-mix operations. Computers and Industrial Engineering, 46, 803-816. [12]Gharbi, A. and Haouari, M. (2005) Optimal parallel machines scheduling with availability constraints. Discrete Applied Mathematics, 148, 63–87. [13]Hall, L.A. and Shmoys, D.B. (1992) Jackson’s rule of single-machine scheduling: Making a good heuristic better. Mathematics of Operations Research, 17, 22-35. [14]He, Y., Zhong, W. and Gu, H. (2006) Improved algorithms for two single machine scheduling problems. Theoretical Computer Science, 363, 257-265. [15]Ji, M., He, Y. and Cheng, T. C. E. (2007) Batch delivery scheduling with batch delivery cost on a single machine. European Journal of OperationalResearch, 176, 745-755. [16]Johnson, SM. (1954) Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1, 61-68. [17]Kellerer, H. and Pferschy, U. (1998) A new fully polynomial approximation scheme for the knapsack problem. Lecture Notes in Computer Science, 1444, 123-134. [18]Kise, H. (1991) On an automated two-machine flowshop scheduling problem with infinite buffer. Journal of the Operations Research Society of Japan, 34, 354-361. [19]Lawler, E. (1979) Fast approximation algorithms for knapsack problems. Mathematics of Operations Research, 4, 339-356. [20]Lee, C.Y. (1991) Parallel machines scheduling with nonsimultaneous machine available time. Discrete Applied Mathrmatics, 30, 53-61. [21]Lee, C.Y. (1996) Machines scheduling with an availability constraint. Journal of Global Optimization, 9, 395-416. [22]Lee, C.Y. and Chen, Z.L. (1999) Two-machines flowshop scheduling with availability constraints. European Journal of Operational Research, 114, 420-429. [23]Lee, C.Y. and Chen, Z.L. (2001) Machine scheduling with transportation considerations. Journal of Scheduling, 4, 3-24. [24]Lee, Y.H., Jeong, C.S. and Moon, C. (2002) Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43, 351–374. [25]Lee, C.-Y., Lei, L. and Pinedo, M. (1997) Current trends in deterministic scheduling. Annals of Operations Research, 70, 1-41. [26]Lee, I. S. and Sung, C. S. (2007) Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186, 931–952. [27]Lin, C.H. and Liao, C.J. (2007) Makespan minimization for two parallel machines with an unavailable period on each machine. International Journal of Advanced Manufacturing Technology, 33, 1024–1030 [28]Liao, C.T., Shyur, D.L. and Lin, C.H. (2005) Makespan minimization for two parallel machines with an availability constraint. European Journal of Operational Research, 160, 445-456. [29]Lu, L., Yuan, J. and Zhang, L. (2008) Single machine scheduling with release dates and job delivery to minimize the makespan. Theoretical Computer Science, 393, 102-108. [30]Maggu, P.L. and Das, G. (1980) On 2×n sequencing problem with transportation times of jobs. Pure and Applied Mathematika Sciences, 12, 1-6. [31]Maggu, P.L., Das, G. and Kumar, R. (1981) On equivalent job-for-job block in 2×n sequencing problem with transportation times. Journal of the Operations Research Society of Japan, 24, 136-146. [32]Mastrolilli, M. (2003) Efficient approximation schemes for scheduling problems with release dates and delivery times. Journal of Scheduling, 6, 521-531. [33]Mellouli, R., Sadfi, C., Chu, C.B. and Kacem, I. (2009) Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times. European Journal of Operational Research, 197, 1150–1165. [34]Pan, C.H., Wu, C.L, Huang, H.C. and Su, C.S. (2009) Coordinating Scheduling with Batch Deliveries in a Two-Machine Flow Shop. International Journal of Advanced Manufacturing Technology, 40, 607-616. [35]Panwalkar, S.S. (1991) Scheduling of a two machine flowshop with travel time between machines. Journal of the Operational Research Society, 42, 609-613. [36]Pinedo, M. (1995) Scheduling: Theory, Algorithms, and Systems. Prentice-Hall: Englewoods Cliffs, NJ. [37]Potts, C.N. (1980) Analysis of a heuristic for one machine sequencing with release dates and delivery times. Operations Research, 28, 1436-1441. [38]Potts, C.N. and Kovalyov, M.Y. (2000) Scheduling with batching: A review. European Journal of Operational Research, 120, 228-249. [39]Potts, C.N. and Van Wassenhove, L.N. (1992) Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity. Journal of the Operational Research Society, 43, 395-406. [40]Qi, X. (2011) Outsourcing and production scheduling for a two-stage flow shop. International Journal of Production Economics, 129, 43-50. [41]Schmidt, G. (1984) Scheduling on semi-identical process. Zeitschrift fur Operational Research, 28, 153-162. [42]Simchi-Levi, D. (1994) New worst-case results for the bin packing problem. Naval Research Logistics, 41, 579-585. [43]Soukhal, A., Oulamara, A. and Martineau, P. (2005) Complexity of flow shop scheduling problems with transportation constraints. European Journal of Operational Research, 161, 32-41. [44]Stevens, J.W. and Gemmill, D.D. (1997) Scheduling a two-machine flowshop with travel times to minimize maximum lateness. International Journal of Production Research, 35, 1-15. [45]Stern, H.I. and Vitner, G. (1990) Scheduling parts in a combined production-transportation work cell. Journal of the Operational Research Society, 41, 625-632. [46]Sun Lee, I. and Yoon, S.H. (2010) Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs. Omega, 38, 509-521. [47]Woeginger, G.J. (1994) Heuristics for parallel machine scheduling with delivery times. Acta Informatica, 31, 503-512. [48]Wang, H. and Lee, C.Y. (2005) Production and Transport Logistics Scheduling with Two Transport Mode Choices. Naval Research Logistics, 52, 796-809. [49]Wang, S. and Yu, J. (2009) An effective heuristic for flexible job-shop scheduling problem with maintenance activities. Computers and Industrial Engineering, 59, 436-447. [50]Wang, X. and Cheng, T. C. E. (2009) Logistics scheduling to minimize inventory and transport costs. International Journal of Production Economics, 121, 266-273. [51]Wang, Xiuli. and Cheng, T. C. E. (2007) Machine Scheduling with an Availability Constraint and Job Delivery Coordination. Naval Research Logistics, 54, 11-20. [52]Yue, M. (1991) A simple proof of the inequality FFD(L) ?T 11OPT(L)/9 + 1 ?pL, for the FFD bin-packing algorithm. Acta Mathematica Applicate Sinica, 7, 321-331. [53]Zhong, W., Do’sa, G. and Tan, Z. (2007) On the machine scheduling problem with job delivery coordination. European Journal of Operational Research, 182, 1057-1072.
|