[1].Armentano, Vinicius A., and Debora P. Ronconi, 1999, “Tabu search total tardiness minimization in flowshop scheduling problems,”Computers & Operations Research, 26, 219-235.
[2].Armentano, Vinicius A., and Scrich Cintia Rigao, 2000, “Tabu search for minimizing total tardiness in a job shop,” International Journal of Production Economics, 63, 131-140.
[3].Atabakhsh, H., 1991 “A survey of Constraint based scheduling systems using an artificial intelligence approach”, Artificial Intelligence in Engineering, 6, No. 2.
[4].Brah, S. A., and Hunsucker, J. L., 1991, “Branch and bound algorithm for the flow shop with multiple processors,” European Journal Operational Research, 51, 88-99.
[5].Chen, Chuen-Lung, Vempati, Venkateswara S., and Nasser, Aljaber, 1995, “An application of genetic algorithms for flow shop problems,”European Journal of operational Research, 80, 389-396.
[6].Cheng, R., M. Gen, and Y. Tsujimura, 1999, “A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies,” Computers and Industrial engineering, 36, 343-364.
[7].D. R. Sule, 1997, “Industrial Scheduling”, PWS publishing Company.
[8].Garey MR, Johnson DS, Sethi R, 1976, “The complexity of flow-hop and job-shop scheduling”, Math Oper Res, 1, 117-129.
[9].Graves, S. C., 1981, “ A Review of Production Scheduling”, Operation Research, 29, 646-670.
[10].Hung, Y. F., and Leachman, R. C., 1996, “A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations,” IEEE Transactions on Semiconductor Manufacturing, 9, No. 2, 257-269.
[11].i2,1999, RHYTHM Factory Planner User Manual.
[12].Joel D. Wisner, 1995,"A Review of the Order Release Policy Research", International journal of operations & production management, 15, No. 6, 25-40.
[13].Jospeh Y-T. Leung, 2004, Handbook of Scheduling :Algorithms, Models,and Performance Analysis, Boca Raton :Chapman & Hall/CRC.
[14].Kimt, YD., 1993, “A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshop,” Computers and Operations Research, 20, 391-401.
[15].Kimt, Yeong-Dae, 1995 “ A backward approach in list scheduling algorithms for multi-machine tardiness problems,”Computers and Operations Research, 22, No.3, 307-319.
[16].Leachman, R. C., and Carmon, T. F., 1992, “On capacity modeling for production planning with alternative machines,” IIE Transactions, 24, No. 4, 62-72.
[17].Lomnicki, Z. A., 1965, “A branch and bound algorithm for the exact solution of the three-machine scheduling problem,” Operation Research Quarterly, 16/1, 89-100.
[18].Matsurra , H., Tsubone, H., and Kataoka, K., “Comparision between simple infinite loading considering a workload satus under uncertainty in job operation times,” International Journal of Production.
[19].Mellor, P., 1966, “A review of job shop scheduling “, Operational Research Quarterly, 17, No.2, 161-170.
[20].Michael Pinedo, Xiuli Chao, 1999, Operations Scheduling with Applications in Manufacturing and Services, rwin/McGraw-Hill, Boston.
[21].Moon, C., J. Kim, and S. Hur, 2002, “Integrated process planning and scheduling with minimizing total tardiness in multi plants supply chain,” computers & Industrial Engineering.
[22].Stevenson, W. T., 1988, Production and Operation Management, 2nd. Edition, Irwin.
[23].V.Suresh, Dipak Chaudhuri, 1993, “Dynamic scheduling-A survey of research”, International Journal of Production Economics, 32, 53-63.
[24].V.Suresh, Dipak Chaudhuri, 1993, “Dynamic scheduling-A survey of research”, International Journal of Production Economics, 32, 53-63.
[25].Wein L. M., 1988, “Scheduling Semiconductor Wafer FABRICATION”, IEEE Trans. Semicond. Manufact, 1, NO.3, 155-130.
[26].Wortmann, J. C., Euwe, M. J., Taal, M., and Wiers, V. C. S., 1996, “A review of capacity planning techniques within standard software package,” Production Planning and Control, 7, No. 2, 117-128.
[27].王立志,2006,系統化運籌管理與供應鏈管理-企業營運新典範,滄海書局。
[28].林我聰,現場排程專家系統—應用個體導向技術建立之研究,第1版,資訊與電腦。
[29].周世杰,林我聰,王立志,1993,"物件導向式現場排程專家系統之建立",中國工業工程學會八十二年度論文集,479-484。
[30].莊世宗, 1997, FAB之即時模擬台成語控制,雲林科技大學,碩士論文。
[31].陳建良,1995年12月號,排程概述,機械工業雜誌,l22-137。