跳到主要內容

臺灣博碩士論文加值系統

(216.73.217.61) 您好!臺灣時間:2026/09/05 02:41
字體大小: 字級放大   字級縮小   預設字形  
回查詢結果 :::

詳目顯示

: 
twitterline
研究生:Dinar Pramudawardhani
研究生(外文):Dinar Pramudawardhani
論文名稱:Key Drivers, Critical Success Factors and Risk Allocation for Public-Private Partnership Infrastructure Projects: Comparisons between five countries
論文名稱(外文):Key Drivers, Critical Success Factors and Risk Allocation for Public-Private Partnership Infrastructure Projects: Comparisons between five countries
指導教授:周瑞生周瑞生引用關係
指導教授(外文):Jui-Sheng Chou
口試委員:周瑞生
口試委員(外文):Jui-Sheng Chou
口試日期:2014-06-19
學位類別:碩士
校院名稱:國立臺灣科技大學
系所名稱:營建工程系
學門:工程學門
學類:土木工程學類
論文種類:學術論文
論文出版年:2014
畢業學年度:102
語文別:英文
論文頁數:139
中文關鍵詞:key driverscritical success factorsrisks allocationpublic-private partnershipprivatizationconfirmatory factor analysiscross-country comparison
外文關鍵詞:key driverscritical success factorsrisks all
相關次數:
  • 被引用被引用:0
  • 點閱點閱:220
  • 評分評分:
  • 下載下載:1
  • 收藏至我的研究室書目清單書目收藏:1
Public private partnership (PPP) is an effective and well-established strategy for procuring infrastructure. Although many countries have implemented PPP for infrastructure development in recent years, not all have been successful. Most PPP implementation failures result from inappropriate risk allocation and lack of information about success factors within their countries. This research compared key drivers, critical success factors (CSFs), and preferred risk allocation in PPPs performed in Indonesia, Taiwan, Singapore, China and UK. Mean value analysis, confirmatory factor analysis, and dimensional grid were used to analyze and compare those categories. Data for PPPs in Taiwan, Singapore, China and UK were obtained by comprehensive literature reviews. Meanwhile, Indonesia data were obtained by structural survey of PPP practitioners and academicians. Considering Indonesia as a baseline, the results reveal that Indonesia and Taiwan have several similar key drivers’ indicators. Furthermore, comparisons with several countries showed that Indonesia CSFs are most similar to China CSFs. Regarding risk allocation preference, the analytical results indicate that Singapore has the most similarity with Indonesia. The contribution of this study is to provide useful information for potential investors in PPP projects so that they can improve their understanding of key drivers, CSFs and risk allocation in the researched counties. International investors can then apply investment strategies based on the similarities and differences in each country.
Public private partnership (PPP) is an effective and well-established strategy for procuring infrastructure. Although many countries have implemented PPP for infrastructure development in recent years, not all have been successful. Most PPP implementation failures result from inappropriate risk allocation and lack of information about success factors within their countries. This research compared key drivers, critical success factors (CSFs), and preferred risk allocation in PPPs performed in Indonesia, Taiwan, Singapore, China and UK. Mean value analysis, confirmatory factor analysis, and dimensional grid were used to analyze and compare those categories. Data for PPPs in Taiwan, Singapore, China and UK were obtained by comprehensive literature reviews. Meanwhile, Indonesia data were obtained by structural survey of PPP practitioners and academicians. Considering Indonesia as a baseline, the results reveal that Indonesia and Taiwan have several similar key drivers’ indicators. Furthermore, comparisons with several countries showed that Indonesia CSFs are most similar to China CSFs. Regarding risk allocation preference, the analytical results indicate that Singapore has the most similarity with Indonesia. The contribution of this study is to provide useful information for potential investors in PPP projects so that they can improve their understanding of key drivers, CSFs and risk allocation in the researched counties. International investors can then apply investment strategies based on the similarities and differences in each country.
ABSTRACT ii
ACKNOWLEDGEMENTS iii
TABLE OF CONTENTS v
LIST OF TABLES viii
Chapter 1 INTRODUCTION 1
1.1. Research background 1
1.2. Research objective 3
1.3. Research process 4
Chapter 2 LITERATURE REVIEW 6
2.1. Public private partnership (PPP) development 6
2.2. Public private partnership (PPP) success and failure story 7
2.3. PPP status in UK, Indonesia, Taiwan, Singapore and China 8
2.4. Data bank of key drivers, CSFs and risk factors 11
Chapter 3 METHODOLOGY 16
3.1. Survey process 16
3.2. Confirmatory factor analysis and mean value analysis 18
3.3. Model fit 20
3.4. Reliability and validity methods 22
3.4.1 Reliability 22
3.4.2 Validity 23
3.4.3 Two dimension importance analysis 23
Chapter 4 DATA ANALYSIS AND RESULTS 25
4.1. Description of survey data 25
4.2. Drivers, success factors and risk allocation in Indonesia 28
4.2.1 Drivers of PPP and CSFs 28
4.2.2 Preferred risk allocation 30
4.3. Cross-country comparisons 33
Indonesia versus Taiwan 34
Indonesia versus Singapore 40
Indonesia versus China 42
Indonesia versus UK 44
Chapter 5 CONCLUSIONS AND RECOMMENDATIONS 46
5.1. Conclusions 46
5.2. Future works and recommendation 48
REFERENCES 49
APPENDIX A QUESTIONNAIRE (ENGLISH VERSION) 55
APPENDIX B QUESTIONNAIRE (INDONESIAN VERSION) 61
APPENDIX C SPSS AMOS CONFIRMATORY FACTOR ANALYSIS 67
SPSS AMOS CONFIRMATORY FACTOR ANALYSIS (INITIAL MODEL) 67
APPENDIX D IBM SPSS STATISTIC SURVEY DATA INTERFACE VARIABLE DATA DESCRIPTION 69
APPENDIX E RISK ALLOCATION IN INDONESIA 74
APPENDIX F KEY DRIVERS AND CSFs COMPARISON 76
APPENDIX G RISKS ALLOCATION COMPARISONS 81
APPENDIX I THESIS TUTORIAL 90
A.Hayduk, L. (1987) Structural Equation Modeling with LISREL. the Johns Hopkins University Press.
Abednego, M.P., Ogunlana, S.O. (2006) Good project governance for proper risk allocation in public–private partnerships in Indonesia. International Journal of Project Management 24, 622-634.
Adams, J., Young, A., Zhihong, W. (2006) Public private partnerships in China; System, constraints and future prospects. International Journal of Public Sector Management 19, 384-396.
Asian Development Bank (2008) Public-Private Partnership Handbook. Asian Development Bank, etro Manila, Philippines.
B.Kline, R. (2011) Priciples and Practice of Structural Equation Modeling (Third Edition). The Guilford Press, New York.
Bing, L., Akintoye, A., Edwards, P.J., Hardcastle, C. (2005a) The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management 23, 25-35.
Bing, L., Akintoye, A., Edwards, P.J., Hardcastle, C. (2005b) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics 23, 459-471.
Brown, C. (1999) United Kingdom: public private partnerships. International Financial Law Review, 25–29.
Canadian Council for PPP, 2007. About PPP: Definition. (Accessed 12-Jan, 2014. http://www.pppcouncil.ca/resources/about-ppp/definitions.html).
Carnis, L., Yuliawati, E. (2013) Nusantara: Between sky and earth could the PPP be the solution for Indonesian airport infrastructures? Case Studies on Transport Policy 1, 18-26.
Chan, A., Chan, D., Chiang, Y., Tang, B., Chan, E., Ho, K. (2004) Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management 130, 188-198.
Chan, A., Lam, P., Chan, D., Cheung, E., Ke, Y. (2009) Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management 135, 1115-1124.
Chan, A., Lam, P., Chan, D., Cheung, E., Ke, Y. (2010) Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective. Journal of Construction Engineering and Management 136, 484-494.
Chan, A., Lam, P., Wen, Y., Ameyaw, E., Wang, S., Ke, Y. (2014) Cross-Sectional Analysis of Critical Risk Factors for PPP Water Projects in China. Journal of Infrastructure Systems 0, 04014031.
Chan, A., Yeung, J., Yu, C., Wang, S., Ke, Y. (2011) Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China. Journal of Management in Engineering 27, 136-148.
Chen, Y., Zhang, Y., Liu, J., Mo, P. (2011) Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation Model. Journal of Management in Engineering 28, 243-251.
Cheung, E., Chan, A. (2011) Risk Factors of Public-Private Partnership Projects in China: Comparison between the Water, Power, and Transportation Sectors. Journal of Urban Planning and Development 137, 409-415.
Chou, J.-S., Ping Tserng, H., Lin, C., Yeh, C.-P. (2012) Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects. Transport Policy 22, 36-48.
Chowdhury, A.N., Chen, P.H., Tiong, R.L.K. (2011) Analysing the structure of public–private partnership projects using network theory. Construction Management and Economics 29, 247-260.
Economic and Social Commission for Asia and the Pacific, 2012. A New Vision for Public-Private Partnerships (PPP) in Asia-Pacific. (Accessed 28-Feb, 2014. http://www.unescap.org/speeches/new-vision-public-private-partnerships-ppp-asia-pacific).
Fornell, C., F.Larcker, D. (1981) Evaluating Structural Equation Models with Unobservable Variables and Measurement Error. Journal of Marketing Research 18, 39-50.
Grimsey, D., Lewis, M.K. (2002) Evaluating the risks of public private partnerships for infrastructure projects. International Journal of Project Management 20, 107-118.
Hair, J.F., Black, W.C., Babin, B.J., Anderson, R.E. (2010) Multivariate Data Analysis: A global perspective (Seventh Edition), Seventh ed. Pearson Education International, New Jersey.
Hair, J.F., Black, W.C., Babin, B.J., Anderson, R.E., Tatham, R.L. (2006) Multivatiate Data Analysis.
Heravi, G., Hajihosseini, Z. (2012) Risk Allocation in Public–Private Partnership Infrastructure Projects in Developing Countries: Case Study of the Tehran–Chalus Toll Road. Journal of Infrastructure Systems 18, 210-217.
Hwang, B.-G., Zhao, X., Gay, M.J.S. (2013) Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors. International Journal of Project Management 31, 424-433.
Jin, X. (2010) Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia. Journal of Construction Engineering and Management 136, 138-150.
Jin, X. (2011) Model for Efficient Risk Allocation in Privately Financed Public Infrastructure Projects Using Neuro-Fuzzy Techniques. Journal of Construction Engineering and Management 137, 1003-1014.
Jin, X., Zhang, G. (2011) Modelling optimal risk allocation in PPP projects using artificial neural networks. International Journal of Project Management 29, 591-603.
European Investment Bank (2010) Public-private partnership in Europe - before and during the recent financial crisis.
Ke, Y., Wang, S., Chan, A., Cheung, E. (2009) Research Trend of Public-Private Partnership in Construction Journals. Journal of Construction Engineering and Management 135, 1076-1086.
Ke, Y., Wang, S., Chan, A.P.C., Lam, P.T.I. (2010) Preferred risk allocation in China’s public–private partnership (PPP) projects. International Journal of Project Management 28, 482-492.
Kingombe, C.K.M. (2011) Mapping the new infrastructure financing landscape. Overseas Development Institute.
Li, J., Zou, P. (2011) Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects. Journal of Construction Engineering and Management 137, 1205-1209.
Liu, J., Yu, X., Cheah, C.Y.J. (2014) Evaluation of restrictive competition in PPP projects using real option approach. International Journal of Project Management 32, 473-481.
Osipova, E., Eriksson, P.E. (2013) Balancing control and flexibility in joint risk management: Lessons learned from two construction projects. International Journal of Project Management 31, 391-399.
Robinson, P., Hawksworth, J., Boardbent, J., Laughlin, R., Haslam, C. (2002) The Private Finance Initiative:Saviour, Villain or Irrelevance? Institute of Public Policy Research, London.
Rockart, J.F. (1982) The changing role of the information systems executive: a critical success factors perspective. Sloan Management Review 24, 3-13.
Russell, A.D., Tawiah, P., DeZoysa, S. (2006) Project innovation—a function of procurement mode? Canadian Journal of Civil Engineering 33, 1519–1537.
Singh, L., Boeing ., Kalidindi, S.N. (2006) Traffic revenue risk management through Annuity Model of PPP road projects in India. International Journal of Project Management 24, 605-613.
Tam, C.M. (1999) Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures. International Journal of Project Management 17, 377-382.
Tang, L., Shen, Q., Cheng, E.W.L. (2010) A review of studies on Public–Private Partnership projects in the construction industry. International Journal of Project Management 28, 683-694.
The World Bank, 2011. A World Bank Resource for PPPs in Infrastructure. (Accessed 24-Dec, 2013. http://ppp.worldbank.org/public-private-partnership/).
The World Bank, 2014. Private participation in infrastructure database. (Accessed 23-Jan, 2014. http://ppi.worldbank.org/).
Tserng, H., Russell, J., Hsu, C., Lin, C. (2012) Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study. Journal of Construction Engineering and Management 138, 242-249.
Wang, S.Q., Dulaimi, M.F., Aguria, M.Y. (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics 22, 237-252.
Xenidis, Y., Angelides, D. (2005) The financial risks in build‐operate‐transfer projects. Construction Management and Economics 23, 431–441.
Xu, Y., Yeung, J.F.Y., Chan, A.P.C., Chan, D.W.M., Wang, S.Q., Ke, Y. (2010) Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach. Automation in Construction 19, 929-943.
Zhang, X. (2005) Critical Success Factors for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management 131, 3-14.
Zheng, S., Tiong, R. (2010) First Public-Private-Partnership Application in Taiwan’s Wastewater Treatment Sector: Case Study of the Nanzih BOT Wastewater Treatment Project. Journal of Construction Engineering and Management 136, 913-922.
連結至畢業學校之論文網頁點我開啟連結
註: 此連結為研究生畢業學校所提供,不一定有電子全文可供下載,若連結有誤,請點選上方之〝勘誤回報〞功能,我們會盡快修正,謝謝!
QRCODE
 
 
 
 
 
                                                                                                                                                                                                                                                                                                                                                                                                               
第一頁 上一頁 下一頁 最後一頁 top