中文部份:
1.任岳峰 (1999),及時化生產系統下整合存貨模式,國立台灣科技大學管理研究所工業管理學程碩士論文。2.林清河 (2002),物料管理解(二版),華泰書局,台北。
3.林隆儀 (1992),Charles O’Neal & Kate Bertrand 原著,JIT行銷策略,超越企管顧問股份有限公司,台北。
4.邱永俊 (2007),考慮運輸設備容量限制情況下之整合性存貨模式研究,南台科技大學工業管理研究所碩士論文5.張有恒 (1998),物流管理,華泰文化,台北。
6.張聖麟 (1998),卓越化生產管理(二版),華泰書局,台北。
7.張褔榮 (2005),物流管理(二版),五南書局,台北。
8.黃家伶 (2006),考慮前置時間與品質成本之整合存貨模式研究,南台科技大學工業管理研究所碩士論文。9.楊金山 (2003),可控制變數之整合性存貨系統研究,台灣科技大學工業管理研究所博士論文。10.闕興平 (2006),製造品質水準影響存貨決策之模式,南台科技大學工業管理研究所碩士論文。11.蘇雄義 (2002),企業物流導論(二版),華泰書局,台北。
12.鐘少剛 (2006),及時化採購下之整合性存貨模式之研究,南台科技大學工業管理研究所碩士論文。
英文部份:
1.Aderohunmu, R., Mobolurin, A. and Bryson, N. (1995), “Joint Vendor-buyer Policy in JIT Manufacturing,” Journal of the Operational Research Society, Vol. 46, pp. 375-385.
2.Baker, R. C., Chang, R. and Chang, I. (1995), “Switching Rules for JIT Purchasing,” Production and Inventory Management Journal, Vol. 35, No. 3, pp. 13-17.
3.Ballou, R. H. (1992), Business Logistics Management. 3rd Edition. Englewood Cliffs, N.J.:Prentice-Hall. Banerjee, A. (1986), “A Joint Economic-lot-size Model for Purchaser and Vendor,” Decision Sciences, Vol. 17, No. 30, pp. 292-311.
4.Banerjee, A. and Kim, S. L. (1995), “An Integrated JIT Inventory Model,” International Journal of Operation and Production Management, Vol. 15, No. 9, pp. 237-244.
5.Ben-Daya, M. and Raouf, A. (1994), Inventory models involving lead time as a decisionvariable, Journal of the Operational Research Society, Vol.45, No. 5,pp. 579-582.
6.Goyal, S. K. (1976), “An Integrated Inventory Model for a Single Supplier-single Customer Problem,” International Journal of Production Research, Vol. 15, No. 1, pp. 107-111.
7.Goyal, S. K. (1988), “A Joint Economic-lot-size Model for Purchaser and Vendor: A Comment,” Decision Sciences, Vol. 19, No. 1, pp. 236-241.
8.Goyal, S. K. (1995), “A One-vendor Multi-buyer Integrated Inventory Model: A Comment,” European Journal of Operational Research, Vol. 82, pp. 209-210.
9.Goyal, S. K. and Nebebe, F. (2000), “Determination of Economic Production-shipment Policy for a Single-vendor–single-buyer System,” European Journal of Operational Research, Vol. 121, pp. 175-178.
10.Ha, D. and Kim, S. L. (1997), “Implementation of JIT Purchasing: An Integrated Approach,” Production Planning and Control, Vol. 8, No. 2, pp. 152-157.
11.Hill, R. M. (1997), “The Single-vendor Single-buyer Integrated Production-inventory Model with a Generalized Policy,” European Journal of Operational Research, Vol. 97, pp. 493-499.
12.Huang, C. K. (2004), An optimal policy for a single-vender single-buyer integrated production-inventory problem with process unreliability consideration, International Journal of Production Economics, Vol. 91, pp. 91-98.
13.Kim, S. L. and Ha, D. (2003), “A JIT Lot-splitting Model for Supply Chain Management: Enhancing Buyer-supplier Linkage,” International Journal of Production Economics, Vol. 86, pp.1-10.
14.Leavy, B. L. (1994), “Two Strategic Perspectives on the Buyer-Supplier Relationship, ” Production and Inventory Management Journal, Vol. 35, pp.47-51.
15.Liao, C. J. and C. H. Shyu. (1991), Analytical Determination of Lead Time with NormalDemand, International Journal of Operations and Production Management, Vol. 11, No. 9,pp.72-78,.
16.Lu, L. (1995), “A one-vendor multi-buyer integrated inventory model,” European Journal of Operational Research, Vol. 81, pp.312-323.
17.Montgomery, D. C., Bazaraa, M. S., and Keswani, A. K.(1973), Inventory models with amixture of Backorders and lost sales, Naval Research Logistics Quarterly, Vol. 20, No.2 ,pp.255-263.
18.Moon, I. and Choi, S. (1998), “A note on lead time and distributional assumptions incontinuous review inventory models”, Computers & Operations Research, Vol. 25 No. 11, pp. 1007-1012.
19.Ouyang, L. Y. and Wu, K. S.(1998), A minimax distribution free procedure for mixedinventory model with variable lead time, International Journal of ProductionEconomics,Vol. 56-57, pp.511-516.
20.Ouyang, L. Y. and Yao, J. S. (2002), A minimax distribution free procedure for mixedinventory model involving variable lead time with fuzzy demand, Computers &Operations Research, Vol. 29, pp. 471-487.
21.Ouyang, L. Y., K. S. Wu and C. H. Ho. (2004), Integrated vendor-buyer cooperativemodel with stochastic demand in controllable lead time. International Journal of Production Economics, Vol. 92, pp. 255-266.
22.Ouyang, L. Y., Yeh, N. C., and Wu, K. S. (1996), “Mixture inventory model withbackorders and lost sales for variable lead time”, Journal of the OperationalResearch Society, Vol. 47, pp. 829-832.
23.Pan, C.-H. J. and Hsiao, Y. C. (2005), Integrated inventory models with controllable leadtime and backorder discount considerations, International Journal of Production Economics, Vol. 93-94, pp.387-397,
24.Pan, C.-H. J., and Yang, J. S. (2002), “A study of an integrated inventory with controllable lead time,” International Journal of Production Research, Vol. 40, No. 5, pp.1263-1273.
25.Pan, C.-H. J., Lo, M. C., and Hsiao, Y. C. (2004), Optimal reorder point inventory modelswith variable lead time and backorder discount considerations, European Journa of Operational Research, Vol.158, pp. 488-505.
26.Ramarapu, N.K., Mehra, S. and Frolick, M.N. (1995), “A Comparative analysis and Review of JIT Implementation Research,” International Journal of Operations and Production Management, Vol. 15, No. 1, pp.38-49.
27.Ramasesh, R.V. (1990), “Recasting the Traditional Inventory Model to Implement Just-in-time Purchasing,” Production and Inventory Management Journal, Vol. 31, pp.71-75.
28.Ramasesh, R.V. (1993), “A Logistics-based Inventory Model for JIT Procurement,” International Journal of Operations and Production Management, Vol. 13, pp.44-58.
29.Tersine, R. J. (1994), Principles of Inventory and Material Management, North Holland,New York.
30.Yang, G., Ronald, R. J., and Chu, P. (2005), Inventory models with variable lead time andpresent value, European Journal of Operational Research, Vol.164, pp.358-366.
31.Yang, J. S. and Pan, C.-H. J. (2004), “Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment,” International Journal of Production Research, Vol. 42, No. 5, pp. 853-863.