【1】Ang, A., Abdelnour, J., and Chaker, A.A., “ Analysis of activity networks under uncertainly ”, Journal of the Engineering Mechanic Division, ASCE, 101(EM4), 1975, pp. 373-387.
【2】Ayyub, B. M., and Halder, A., “ Project scheduling using fuzzy set concept. ” Journal of the Construction Engineering and Management, ASCE, 110(2), 1984, pp.189-204.
【3】Dize, C. F., and Hadipriono, F.C., “ Nondeterministic networking methods. ” Journal of the Construction Engineering and Management, ASCE, 1993, 119(1), pp.40-57.
【4】Hendrickson, C., and Au, T., “Project management for construction.” Prentice-Hall Inc., Englewood Cliffs, New Jersey, 1989, pp.346-356.
【5】Littlefield, T. K., and Randolph, P. H., “ An answer to Sasieni’s Question on PERT times. ”, Management Science, 1987,33(10), pp.1357-1359.
【6】Malcolm, D.G., Roseboom, J.E., Clark, C.E., and Fazer, W., “ Application of a technique for research and development program evaluation. ” Operations Research, 1959, 7, pp.646-669.
【7】MacCrimmon, K. R., and Rayvec, C. A.,“ An analytical study of the PERT assumptions. ”, Operations Research, 1964,12(4), pp.16-37.
【8】Moder, J. J., Phillips, C. R., and Davis, E. W. “ Project management with CPM, PERT, and precedence diagram. ”, Van Nostrand Company Inc., New York, N.Y, 1983, pp.269-312.
【9】Touran, A., and Wiser, E.P., “ Monte Carlo technique with correlated random variables. ”, Journal of the Construction Engineering and Management, ASCE, 118(2), 1992, pp.258-272.
【10】Van Slyke, R.M.,“ Monte Carlo methods and the PERT problem.” Operations Research, 1963, 11(5), pp.839-860.
【11】Wu, W. K., and Hadipriono, F. C.,“ Fuzzy modus ponens deduction technique for construction scheduling. ”, Journal of the Construction Engineering and Management, ASCE, 1994,120(1), pp.162-179.
【12】Yu-Ting Lai, and Wei-Chih Wang, “Automated representation of construction interface.” 17th international symposium on automation and robotics in construction, 1994, pp.137-142.
【13】Wei-Chih Wang, “Model for Evaluating under Correlated Uncertainty-NETOR.”, Ph.D. dissertation, University of California, Berkeley, CA, 1996.
【14】王維志,「考慮工程界面影響之新進度網圖模式」,國立交通大學,行政院國家科學委員會專題研究報告,台北,2000。
【15】余朝權,生產力管理,五南圖書出版股份有限公司,台北,1996。
【16】吳啟榮,「電腦模擬於營建工程專案排程之應用.」,碩士論文.,國立台灣大學土木工程研究所,台北,1997。【17】洪明洲,管理(個案、理論、辯證),科技圖書股份有限公司,台北,1997。
【18】郭哲明、吳毓勳,「建築工程施工界整合之研究」,內政部建築研究所專題研究計畫成果報告,1999。
【19】黃价成,「時程管理體系整合做法」,碩士論文, 國立成功大學土木工程研究所,台南,2000。【20】張益三,計畫管制實習,三民書局股份有限公司,台北,1987。
【21】張家相,計畫評核術管理,黎明文化事業公司,台北,1979。
【22】葉宏安、汪俊男、王維志,「施工界面管理之改善」, 中華民國第一屆營建管理學術研討會,台北,1999,第281頁-289頁。
【23】鄭國雄、張思,「軌道工程─高鐵、捷運、輕軌、傳統鐵路」,大中國圖書公司,台北,1999。
【24】劉福勳,實用工程進度規劃與控制,漢天下工程管理顧問有限公司,新竹,1997。
【25】謝文通,「高層集合住宅建築與設備介面之整合-介面整合編碼系統及資料庫模型之研究」,碩士論文,國立成功大學建築研究所,台南,1996。【26】戴培達,「施工階段界面圖繪製整合」,台灣營建研究院工程設計品保與界面圖說整合研討會,台北,1999,第227頁-273頁。
【27】顧文翔,「營造廠建立經驗學習資料庫之研究-以捷運車站工程界面管理為例」,碩士論文,國立台灣大學土木工程研究所,台北,2000。