|
[1] V. Sanchez, R. Echavarria, M. Cotorogea and A. Claudio, “A Novel Fast On-Load Tap Changing Regulator,” IEEE Transactions on Power Delivery, pp.l09-ll6, Oct., 2000. [2] 台灣電力公司業務處,「電阻式電壓調整器」,民國八十二年。 [3] R. Shuttleworth, X. Tian, C. Fan and A. Power, “New Tap-Changing Scheme,” IEE Proceedings-Electric Power Applications, Vol. 143, No. l, pp.l08-ll2, Jan., l996. [4] 賴俊鴻,「電力變壓器用有載分接頭切換器」,華城技術,第二期,第11 ~ 17 頁,華城電機公司,民國八十二年六月。 [5] W. Breuer, K. Stenzel, “On-Load Tap Changers for Power and Industrial Transformers-A Vital Apparatus on Today''s Transformers,” Maschinenfabrik Reinhausen GmbH, F. R. Germany, 1993. [6] 台灣電力公司材料處,「69kV, 25MVA 電力變壓器材料標準」,民國九十二年十月。 [7] Operating Instructions for On-Load Tap Changer Type V, Maschinenfabrik Reinhausen GmbH, F. R. Germany, 2001. [8] Operating Principle for On-Load Tap Changer, Maschinenfabrik Reinhausen GmbH, F. R. Germany, 2001. [9] Y. Shibuya, S. Fujita and N. Hosokawa, “Analysis of Very Fast Transient Overvoltage in Transformer Windings,” IEE Proceedings-Generation, Transmission and Distribution, Vol. 144, No. 5, pp.461-468, Sep., 1997. [10] A. Greenwood, “Electrical Transients in Power Systems,” 2nd Edition, John Wiley and Sons, New York, 1991. [11] IEEE Std C57.98-1993, IEEE Guide for Transformer Impulse Tests, IEEE Press, Dec., 2002. [12] R. H. Hopkinson, “Ferroresonant Overvoltage Control Based on TNA Tests on Three-Phase Delta-Wye Transformer Banks,” IEEE Transactions on Power Apparatus and System, Vol. PAS-87, pp. 352-36l, l968. [13] 薛小生、黃郁東,「工業配電」,台北,大中國圖書出版公司,第375 ~ 383 頁,民國八十七年三月。 [14] IEEE Std C57.12.00-2000, IEEE Standard General Requirements for Liquid-Immersed Distribution﹐Power﹐and Regulating Transformers﹐IEEE Press, Dec., 2002. [15] W. J. MeNutt, I. J. Blalock, and R. A. Hinton, “Response of Transformer Windings to System Transient Voltage,” IEEE Transactions on Power Apparatus and System, Vol. PAS-93, pp. 457-467, l974. [16] G. M. Stein, “A Study of Initial Surge Distribution in Concentric Transformer Windings,” IEEE Transactions on Power Apparatus and System, PAS-83, pp.877-893, 1964. [17] A. De, N. Chatterjee, “Part Winding Resonance: Demerit of Interleaved High-Voltage Transformer Winding,” IEE Proceedings-Electric Power Applications, Vol. 147, No. 3, pp.167-174, May, 2000. [18] IEEE Std C57.106-1991, IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment, IEEE press, Dec., 2002﹒ [19] 台灣電力公司試驗所,「電力試驗工作手冊」,民國八十五年六月。 [20] Instruction for Hot Line Oil Purifier, Sanmi Corporation, Tokyo, Japan, Mar., 2000. [21] B. Handley, M. Redfern and S. White, “On Load Tap-Changer Conditioned based Maintenance,” IEE Proceedings-Generation, Transmission and Distribution, Vol. 148, No. 4, pp. 296-300, July, 2001. [22] International Standard IEC 60270-2000, “High Voltage test techniques- Partial discharge measurements,” Sep., 2000.
|