(依中英文、出版年份排序)
【書籍類】
[1]張家相(1979),計劃評核術管理,黎明文化事業公司。
[2]石齊平、郭照榮(1994),當代計量經濟學,三民書局,台北,第57~64頁。
[3]謝淑貞(1995),賽局理論,雙葉書郎有限公司。
[4]鄧方譯(1996),賽局理論與經濟模型,五南圖書出版。
[5]行政院公共工程委員會(2002),政府採購法。
[6]行政院公共工程委員會(2003),最有利標作業手冊。
[7]Willenbrock, J.H.(1972), A Comparative Study of Expected Monetary Value and Expected Utility Value Bidding Strategy Models, Dept. of Civil Engineering, Construction Management Research Series, Report No.3, The Pennsylvania State University.
[8]Chris Hendickson(1989), Project Management for Construction, Prentice Hall, pp.196~210.
[9]Yaw-Kuang Chen(1991), An Analysis of Decision Strategy as Applied to Construction Portfolios, A Dissertation , Stevens Institute of Technology, New Jersey, pp.30~35.
[10]William R. Park, P. E. and Wayne B. Chapin, JR.(1992), Construction Bidding:Strategy Pricing for Profit, John Wiley&Sons, Inc., Canada, pp.64~75.
[11]Frank Harris and Ronald McCaffer(1995), Modern Construction Management, Blackwell Science Ltd, Cambridge, pp.235~260.
[12]Edwin J. Elton and Martin J. Gruber(1995), Modern Portfolio Theory and Investment Analysis.
[13]Avinash Dixit and Susan Skeath 著,藍兆杰、徐偉杰、陳怡君 譯(2002),策略的賽局,宏智文化事業有限公司。
[14]John Von Neumann and Oskar Morgenstern(2004), “Theory of Games and Economic Behavior”, Princeton.
【期刊類】
[1]鄧振原、曾國雄(1989),「層級分析法(AHP)的內涵特性與應用(上)」,中國統計學報,第27 卷,第6 期,第5~22頁。
[2]鄧振原、曾國雄(1989),「層級分析法(AHP)的內涵特性與應用(下)」,中國統計學報,第27 卷,第7 期,第1~20頁。
[3]陳耀光(1994),「整合性競標策略模型之研究」,第七屆建築研究成果發表會論文集,第631~637頁。
[4]姚乃嘉、楊智斌(1995),「工程競標決策輔助模型之建立」,第八屆建築研究成果發表會論文集,第935~940頁。
[5]謝浩明、廖繼仁、郭素貞(1998),「應用層級分析法(AHP)於投標案評選 -1-」,現代營建,226 期,第43-5 2頁。[6]謝浩明、廖繼仁、郭素貞(1998),「應用層級分析法(AHP)於投標案評選 -2-」,現代營建,227 期,第47-53頁。[7]李建中、王維志(2001),「電腦模擬與單價比對在工程採購招標之應用」,土木水利,第二十七卷,第四期,第3~12頁。
[8]王維志、林俊昌(2002),「運用電子標單支援最有例標之標價評審」,營建管理季刊,第52 期,第15~24 頁。
[9]陳奕章(2003),「投標估價網路作業與政府工程e 化連結關係分析」,營造天下,85.86 期合訂本,第19~21 頁。
[10]Friedman, L.(1956), “A Competitive Bidding Strategy”, Operation Research, Vol.4, pp.104~112.
[11]Benjamin, Neal B. H.(1970), “Discussion of "OPBID: Competitive Bidding Strategy Model", Journal of the Construction Division, ASCE,Vol. 96, No. 1, pp. 91-93.
[12]Morin, T.L. and R.H. Clough(1971), Discussion of “Bidding with Competitive Strategy Models”, Journal of the Construction Division, ASCE, Vol.97, No. 1, pp.137~139.
[13]Gate, M.(1971), “Bidding Contingencies and Probabilities”, Journal of The Construction Division, ASCE, Vol.97, No. 2, pp.277~303.
[14]Willenbrock, J.H.(1973), “Utility Function Determination for Bidding Management”, Journal of the Construction Division, ASCE, Vol.99, No. 1, pp.133~153.
[15]Spooner, J.W.(1974), “Probabilistic Estimating”, Journal of the Construction Dicision, ASCE, Vol.100, No. 1, pp.65~77.
[16]Warsgawski A.(1982), “Risk Element in Profit Planning Under Inflation”, Journal of the Construction Division, ASCE, Vol.108, No. 4, pp. 624~638.
[17]Carr, R.I(1987).,“Bidding Strategy Using Multiple Regression”, Journal of The Construction Division, ASCE, Vol.104, No.2, Co1, pp.15~26.
[18]Ahmad, I., and I. Minkarah(1988), ‘‘Questionnaire survey on bidding in construction”, J. Mgmt. in Engrg., ASCE, Vol.4, No.3, pp.229~243.
[19]Ahmad, I.(1990),”Decision-Support for Modeling Bid/no-Bid Decision Problem”, J. Constr. Engrg. and Mgmt., ASCE, Vol.116, No.4, pp.595~608.
[20]Seydel, J. and D. Olson(1990),“Bids Considering Multiple Criteria”, J. Mgmt. in Engrg., ASCE, Vol.116, No.4 , pp.609~623.
[21]Gheorghe, A.V.(1993), “Neural network in consulting engineering management: a framework for bid-decision management”, Cybernetics and Systems: An International Journal, Vol. 24, pp. 525~546.
[22]Moselhi, O., T. Hegazy and P. Fazio(1993), “DBID: Analogy-based DSS for Bidding in Construction”, J. Constr. Engrg. and Mgmt., ASCE, Vol.119, No.3, pp.466~479.
[23]Dozzi, S.P., S M. AbouRizk , and S.L. Schroeder (1996), “Utility-theory model for bid markup decisions”, J. Constr. Engrg. and Mgmt., ASCE, Vol.122, No.2, pp.119~124.
[24]Li, H., L.Y. Shen, and P.E.D. Love(1999), “ANN-Based mark-up estimation system with self-explanatory capacities”, J. Constr. Engrg. and Mgmt., ASCE, Vol.125, No. 3,pp. 185~189.
[25]Li., H. and P.E.D.Love(1999), “Combining Rule-Based Expert Systems and Artificial Neural Networks for Markup Estimation”, Construction Management and Economics, Vol. 17, pp. 169~176.
[26]Chapman, C.B., S.C. Ward, and J.A. Bennell(2000) , “Incorporating uncertainty in competitive bidding”, International journal of project management, Vol.18, pp.337~347.
【論文類】
[1]吳道生(1993),賽局理論在公共工程合約授與行為之應用,國立台灣大學土木工程研究所,碩士論文。[2]蔡文祥(1995),營造廠競標決策之研究—以效用函數理論分析,國立成功大學建築所,碩士論文。[3]郭文達(1996),工程投標決策之初步分析與應用,國立中央大學土木工程研究所,碩士論文。[4]吳道生(1997),營建工程競標模式之研究,國立台灣大學土木工程研究所,博士論文。[5]劉獻隆(1997),整合性競標策略模型之模擬研究,國立成功大學建築所,碩士論文。[6]蔡興文(1998),以人工智慧發展電力系統競價市場之競標策略,中原大學電機工程學系,碩士論文。[7]邱政章(1998),基於機率原理的競標理論在台灣地區營造業競標之實驗研究,中華大學土木工程研究所,碩士論文。[8]李秀玉(1999),應用賽局理論分析我國薄膜電晶體液晶顯示器產業之競爭策略,國立交通大學科技管理研究所,碩士論文。
[9]呂獎慧(1999),都市震救災路線選擇模式之構建,國立台灣大學土木工程研究所,碩士論文。
[10]陳紀宗(2000),模糊策略對局求解發電業競標標之問題,中山大學電機工程研究所,碩士論文。[11]陳曦照(2000),電業自由化環境下競價為基礎之電力調度及發電業競標策略之研究,中山大學電機工程研究所,碩士論文。[12]陳晉堂(2000),以效用函數理論探討造價工期競標法之競標策略,國立雲林科技大學營建工程系研究所,碩士論文。[13]應迦得(2002),工程競標得標機率之實證與經濟利潤競標模型之探討,臺灣大學土木工程研究所,碩士論文。[14]劉建忠(2003),應用賽局理論分析高科技廠房工程競爭行為之研究,國立中央大學營建管理研究所,碩士論文。[15]王昭月(2003),履約品質為基之競標策略-以航空產業為例,逢甲大學工業工程研究所,碩士論文。[16]魏金灶(2003),工程投標案件評選模式之研究,國立中央大學營建管理研究所,碩士論文。[17]劉昌南(2004),以成本攤平為導向之機率競標模型,國立高雄第一科技大學營建工程所,碩士論文。[18]曾坤發(2005),以效用函數探討營建工程之競標策略,國立高雄第一科技大學營建工程所,碩士論文。[19]林純民(2005),營造廠商備標作業之探討,國立高雄第一科技大學營建工程所,碩士論文。[20]黃建源(2006),整合性競標策略模型應用於建築統包工程之研究,國立成功大學工程管理研究所,碩士論文。[21]卓君翰(2007),應用賽局理論分析污水管線工程標案競爭行為之研究,逢甲大學土木工程研究所,碩士論文。[22]項家騏(2011),展望賽局理論決策模式之研究-以高科技廠房競標決策為例,國立台灣科技大學營建工程技術研究所,博士論文。