Adedeji B. Badiru (1992) Computational Survey of Univariate and Multivariate Learning Curve Models. IEEE Transactions on Engineering Management, 39(2), 176 - 188.
Ahn Jae-Hyeon, Kim Myoung-Soo, Lee Dong-joo (2005). Learning from the failure: experiences in the Korean telecommunications market. Technovation, 25(1) 69-82.
Asher H. (1956) Cost-quantity relationships in the airframe industry, Rep. No. R-291, The Rand Corporation, Santa Monica, CA.
Badiru, A.B.(1992) Computational survey of univariate and multivariate learning curve models. IEEE Transactions on Engineering Management, 39(2), 176-188.
Baloff,N.(1971) Extension of the Learning Curve: Some Empirical Results. Operational Research Quarterly, 22(4), 329-340.
Bates A.B., Watts D.G. (1988) Nonlinear regression analysis and its applications, Wiley, New York.
Belkaoui, A.R.(1986) The Learning Curve: A Management Accounting Tool. Quorum Books.
Berndt, E. (1991) The Practice of Econometrics: Classic and Contemporary, Addison-Wesley Pub. Co.
Box, G.E. and Draper, N. R. (1997) Empirical Model Building and Response Surface, John Wiley and Sons, New York.
Carlson, J.G. (1973) Cubic Learning curves:Precision tool for labor estimating. Manufacturing Engineering and Management, 71(5), 22-25,.
De P., Dunne E.J., Gosh J.B., Wells C.E. (1995) The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, 81, 225–238.
DeJong J. R.(1957) The effects of increasing skill on cycle time and its consequences for time standards. Ergonomics, 1(1) , 51-60.
Feng C.W., Liu L. and Burns S.A.(2000) Stochastic construction time–cost trade off analysis. J. Comput. Civ. Eng., 14(2) 117–126.
Fine, C.H. (1986) Quality improvement and learning in productive systems. Management Science, 32(10) , 1301-1315.
Garg, A., and Milliman P.(1961) The Aircraft Progress Curve Modified for Design Changes. Journal of Industriul Engineering, 12(1) 23-27.
Globerson, S.(1980) The influence of job related variables on the predictability power of three learning curve models. AIIE Transactions, 12(1), 64-69.
Glover J.H. (1966) Manufacturing progress functions: An alternative model and its comparison with existing functions. International Journal of Production Research, 4(4), 279-300,
Howell S.D. (1980) Learning curves for new products. Industrial Marketing Management, 9(2), 97-99.
Jaber, M.Y.(2006) Learning and forgetting models and their applications. In: Badiru, A.B. (Ed.), Handbook of Industrial & Systems Engineering. CRC Press (Taylor & Francis Group), New York, NY, 30.1–30.2.
Jeang, A.(1999) Optimal Process Parameter Determination for Computer-Aided Manufacturing. Quality and Reliability Engineering International, 15, 3-16.
Kerridge, A.E.(1986) Predict project results with trending method. Engineering and Construction Project Management , A. E. Kerridge and C. H. Verralin, eds., Gulf Publishing Co., Houston.
Khuri, A.J. and Cornell, J.A. (1996). Response Surface : Design and Analysis. Marcel Dekker, New York.
Knecht G.R. (1974) Costing, technological growth and generalized learning curves. Operational Research Quarterly, 25(3), 487-491.
Kobos Peter H. , Erickson Jon D. , Drennen Thomas E. .(2006) Technological learning and renewable energy costs: implications for US renewable energy policy.
Levy F.K. (1965) Adaptation in the production process. Management Science, 11(6), B136-Bl54.
Li George , Rajagopalan S.(1997). The impact of quality on learning. Journal of Operations Management, 15, 181-191.
Lieberman, M.B.(1987) The learning curve, diffusion, and competitive strategy. Strategic Management Journal, 8(5), 441-452.
Maple User Manual (2011), Maple 15, Maplesoft, Canada.
McIntyre E.V. (1977), Cost-Volume-Profit analysis adjusted for learning. Management Science, 10, 149-160.
Moussourakis J. and Haksever C. (2004) Flexible Model for Time/Cost Tradeoff Problem. Journal of Construction Engineering and Management, 130(3) , 307-314.
Myers, R.H. and Montyomery, D. C.(1995) Response Surface Methodology, Process and Product Optimization Using Designed Experiments, John Wiley and Sons, New York.
Park, S.B., Lee, J.D. and Kim, T.Y.(2003) Learning by doing and spillovers: An empirical study on the TFT–LCD industry, IEMC’ 03.
Pegels C.C. (1969) On Startup or learning curves: An expanded view. AIIE Transactions, 1(3), 216-222.
Womer N.K. (1979) Learning curves, production rate, and program costs. Management Science, 25(4), 312-319.
Wright, T.(1936) Factors affecting the cost of airplanes. Journal of Aeronautical Science,3 , 122-128.
Yang L., Wang Y.R., Pai S. (2009) On-line SPC with consideration of learning curve. Computers & Industrial Engineering, 57, 1089-1095.
Yelle L.E. (1976) Estimating learning curves for potential products. Industrial Marketing Management, 5, 147- 154.
Yelle, L.E.(1979) The learning curve: Historical review and comprehensive survey. Decision Sciences, 10(2), 302-328.
Montgomery原著,黎正中譯(2010),實驗設計與分析,高立圖書出版有限公司,台北。
丁敬哲(2005),以模擬技術和反應曲面法建構專案排程之可靠度,逢甲大學工業工程與系統管理學系,碩士學位論文。王佳鎮 (2000),學習曲線在通訊產業之應用-個案研究,國立交通大學工業工程與管理學系,碩士學位論文。朱鳳傳(1985),選用「公差」的基本觀念,工業職業教育,卷5,冊1,頁34-38。宋化榮(2003),單機排程問題—伴隨學習效果之雙準則研究,逢甲大學統計與精算研究所,碩士學位論文。宋欣財(2003),專案排程趕工決策模式,國立成奶j學土木工程系,碩士學位論文。張春興(2001),現代心理學,東華書局。
張嘉麟(2000),以不對稱損失函數同時作裝配尺寸與公差之最佳化設計,逢甲大學工業工程學系,碩士學位論文。陳榮坤(2011),數位影像在量測植物葉面積之應用,台南區農業專訊,76期,頁8-9。
謝瀚霆(2010),螞蟻演算法求解有學習效應之不相關平行機總加權延遲最小化之排程問題,逢甲大學工業工程與系統管理學系,碩士學位論文。