1.Askar, M. M. (2002), “Problems facing parties involved in build, Operate, and Transfer projects in Egypt.” ASCE, Vol.18, Issue 4, pp.173-178.
2.Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). “Causes of quality deviations in design and construction.” J. Constr. Eng. Manage., 118(1), 34–49.
3.Chan, T. W., Chen, C., Messner, J. I. and Chua, D. K. H. (2005), “Interface Mmanagement for China’s build–operate–transfer projects.” Journal of Management in Engineering, ASCE, Vol. 131, No. 6, 645-655.
4.Chan T. W, Messner, and Chen C.etc. (2005), “Interface management for China’s build-operate-transfer projects.” Journal of Management in Engineering, ASCE, Vol.131, No.6, pp.645-655.
5.Chang, A. S. (2002), “Reasons for cost and schedule increase for engineering design projects.” Journal of Management in Engineering, ASCE, 18 (1), 29-36.
6.Chase, G.. W. (1993), “Effective total quality management (TQM) process for construction.” Journal of Management in Construction, ASCE, Vol.9, No.4, 433-443.
7.DBIA (1994), Design-Build Manual of Practice. Design-Build Institute of America, Washington, D.C.
8.Deffenbaugh, R. L. (1993), “Total quality management at construction jobsites.” Journal of Management in Construction, ASCE, Vol. 9, No. 4, 382-389.
9.Dym, C. L. and Little, P. (2001), Engineering Design: A Project-Based Introduction, John Wiley & Sons Inc, New York.
10.Fredrickson, K. (1998), “Design guidelines for design-build projects.” Journal of Management in Engineering, ASCE, Vol.14, No.1, pp.77-80.
11.Gransberg D. D. and Molenaar K. (2004), “Analysis of owner’s design and construction quality management approaches in design/build projects.” Journal of Management in Engineering, ASCE, Volume 20, Issue 4, 162-169
12.Gordon, C. (1991), Compatibility of Construction Contracting Methods with Projects and Owners. Master Thesis, Civil Engineering Dept., Massachusetts Institute of Technology (MIT).
13.Graves, R. (1993), “Total Quality—Does it work in engineering management?” Journal of Management in Construction, ASCE, Vol. 9, No. 4, 444-455.
14.Ibbs, W., Kwak, Y. H., Ng, T., and Odabasi, A. M. (2003), “Project delivery systems and project change: quantitative analysis.” Journal of Construction Engineering and Management, Vol.145, No.4, pp.382-387.
15.Jamali, D. (2004), “Success and failure mechanisms of public private partnerships (ppps)in developing.” IJPSM, Vol. 17, No. 5, 414-430
16.Kumaraswamy, m. m. (2002), “Build-operate-transfer-type procurement in Asian megaprojects.” Journal of Management in Engineering, ASCE, Vol. 128, No. 2, 93-102.
17.Kuprenas, J. A. and Kenney, M. D. (1998), “Total quality management implementations and results: progress update.” Journal of Management in Engineering, ASCE, Vol. 3, No. 1, 34-39.
18.Ledbetter, W. B. (1994). “Quality performance on successful projects.” Journal of Construction Engineering and Management, ASCE, 120 (1), 34-46.
19.Ling, Y. Y., Chan, S.L and Chong, E. (2004) “Predicting performance of design-bulid and design-bid-build projects.” Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 1, 75-83.
20.Ngowi, A. B. (2000), “Construction procurement based on concurrent engineering principles.” Logistics Information Management, Volume 13, No. 6, 361-368.
21.Pheng, S. L. and Teo J. A. (2004), “Implementing total quality management in construction firms” Journal of Construction Engineering and Management, ASCE, Vol. 20 No.1, 8-14.
22.Pietroforte, R. and Miller, J. B. (2007). “Procurement methods for US infrastructure: historical perspectives and recent trends.” Building Research & Information, 30:6, 425 – 434.
23.Saarinen, A. W. and Hobel, M. A.(1990) “Setting and meeting requirements for quality” Journal of Construction Engineering and Management, ASCE, Vol. 6, No.2, pp.177-184.
24.Schoonmaker, S. (1997), ISO 9001 for engineers and designers, McGraw-Hill, New York.
25.Songer, A. D. (1996), “Selecting design-build: Public and private sector owner attitudes.” Journal of Construction Engineering and Management, ASCE, Vol. l2, No.6, pp.47-58.
26.Tiong, R. L. K. (1992), “The structuring of Build-Operate-Transfer construction projects,” Centre for Advanced Construction Studies, Nanyang Technological University, Singapore.
27.Tiong, R. L. K. (1995), “Risk and guarantees in BOT tender,” Journal of Construction Engineering and Management, ASCE, Volume 121, No. 2, 183-188.
28.Tiong, R. L. K. (1995), “Competitive advantage of equity in BOT tender,” Journal of Construction Engineering and Management, ASCE, Volume 121, No. 3, 282-289.
29.Tiong, R. L. K. (1996), “CSFS in competitive tendering and negotiation model for bot projects.” Journal Construction Engineering and Management ASCE, Volume 122, No. 3, 205-211
30.Ye, S. and Tiong, L. K. (2003). “The effect of concession period design on completion risk management of BOT projects.” Construction Management and Economics, July, 21, 471-482.
31.Zhang, W. R., Wang, S.Q., Tiong, R. L. K., Ting, S.K. and Ashley, D.(1998), “Risk management of Shanghai’s privately financed Yan’an Donglu tunnels,” Engineering Construction and Architectural Management, Vol.5, No.4, 399-409.
32.Zhang, X. and Kumaraswamy, M. M. (2001), “Hong Kong experience in managing BOT projects,” Journal of Construction Engineering and Management, ASCE, Vol.127, No.2, pp.154-162.
33.Zhang, X. (2005), “Concessionaire's financial capability in developing Build-Operate- Transfer type infrastructure projects.” Journal of Management in Construction, ASCE, Vol. 131, 1054-1064.
34.C3聯合顧問團(民91),高雄都會區大眾捷運系統民間參與捷運顧問(第三部份)品質及安全管理監督顧問服務-工作執行3計畫書。
35.王冠雄與黃宏傑(民90),「高雄捷運BOT 計畫與執行策略之探討」,高雄捷運工程技術研討會(二)論文集,4 月23 日,高雄市政府捷運局,高雄。
36.宋明哲(民89),風險管理:非金融風險,第四版,五南圖書出版有限公司,台北市。
37.林同棪工程顧問股份有限公司(2001),民間參與公共建設交通計畫 BOT 辦理方式、法規及高雄捷運案例。
38.林能白等(民89),從高速鐵路及國際金融大樓兩案之經驗檢討我國BOT制度之設計,研究計畫編號RDEC-RES-089-004,行政院研究發展考核委員會,五月。
39.周禮良及楊瓊貴(民91),「民間參與捷運系統之監督與管理」,工程雙月刊,第75卷,第2 期,29-41頁。
40.周禮良(民96),信任,草根出版社,12月,台北。
41.邱皓政(民93),結構方程模式-Lisrel的理論、技術與應用,雙葉書廊有限公司出版,台北。
42.吳大川(民92),BOT工程品質管理制度之研究-以軌道工程為例,高雄第一科技大學營建工程系,碩士論文,高雄。43.胡仲英(民88),BOT理論與實務:兼論我國BOT政策之推動,財團法人孫運璿學術基金會,8月,台北。
44.莊曜聰(民93),BOT計畫之政府監督管理程度,成功大學土木工程研究所,碩士論文,台南。45.陳國書(民92),公共工程履約爭議處理之研究,中山大學企業管理所碩士在職專班,高雄。46.陳舜田、沈進發、呂守陞、鄭明淵(2002),「BOT計畫工程管理體系之探討」,2 月,台北。
47.張行道等(2003),公共建設BOT計畫組織協調與工作整合-以高雄捷運工程為例,研究計畫編號92946,中華顧問工程司,十二月。
48.張學孔(民87),「政府應在公共工程BOT 案中扮好角色」,營建知訊,第184 期, 6-7頁。49.黃振聲(民92),「政府部門獎勵民間參與交通建設之研究:以台北市公共停車場BOT為例」,玄奘管理學報,第一卷,第一期1-50頁。50.黃朗文譯(民88), Fowler F. J., Jr., Mangione T.W.著,標準化調查訪問,弘智文化出版,台北。
51.葉至誠、葉立誠 (民88),研究方法與論文寫作,商鼎,台北。
52.劉憶如等(民94),國內推動民間參與重大交通建設專案融資實務之研究,研究計畫編號1-0-94-31-02-0002,交通部高速鐵路工程局,7月。
53.劉福勳(民88),「營造業實施ISO認證之現存缺失及改善策略」,營造天下,第46期,pp. 43-46。54.促進民間參與公共建設法,民國90 年10 月31 日修正。
55.促進民間參與公共建設法施行細則,民國92 年08 月13 日修正。
56.公共工程委員會(民93),民間參與公共建設資訊,工程會網站www.pcc.gov.tw。
57.行政院公共工程委員會(民96),促進民間參與公共建設簡介,民間參與公共建設資訊網 http://60.248.253.154/popp/web/default.htm
58.台北捷運工程局(民96),政策專區-捷運白皮書,台北市政府捷運工程局網站http://www.dorts.gov.tw/home/home.asp
59.高雄捷運工程局(民96),捷運計畫-高雄捷運簡介,高雄市政府捷運工程局網站http://mtbu.kcg.gov.tw/html/promote/index.php