中文部份
江珮甄,2005,以派工法則求解彈性流程式生產排程問題,國立台灣大學,碩士論文。邱智琳,2012,具有限資源及整備時間與交期限制之平行機台排程問題,明志科技大學,碩士論文。陳俊吉,2008,以啟發式方法解決具迴流性資源之彈性流程式排和問題,國立政治大學,碩士論文。黃河川,2002,企業工作委外程度之影響因素分析-以國內生物科技廠商為列,國立成功大學,碩士論文。英文部分
Allahverdi, A., Ng, C.T., Cheng, T. C. E., and kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational research, 187, 985-1032.
Baker, K. R. and Scudder, G. D.(1990). Sequencing with earliness and tardiness penalties.
Biskup, D. and Cheng, T.C.E. (1999). Multiple-machine scheduling with earliness, tardiness and completion time penalties.
Cheng, T. C. E. and Sin, C. C. S. (1990). A state-of-the-art review of parallel-machine scheduling research. European Journal of Operational research, 47, 271-292
Framinan, J. M. and Leisten, R., (2003). An efficient constructive heuristic for flowtime minimization in permutation flow shops. Omega, Vol.31
Graham, R. L., Lawler, E. L., Lenstra, J. K., and Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematic, 5,287-326.
Laha, D., and Sarin, S. C., (2009). A heuristic to minimize total flowtime in permutation flowshop. Omega, Vol.37,
Pinedo, M. (1995).Scheduling.New Jersey: Hall.
Ventura, J., Radhakrishnan, S., (2000). Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times. International Journal of Production Research, Vol.38, No.10.