[1] P. R. Philipoom,M. K. Malhotra, and J. B. Jensen,「An Evaluation of Capacity Sensitive Order Review and Release Procedure in Job Shops」,Decision Sciences,Vol.24,No. 6,pp. 1109-1133,1993.
[2] Goldratt,E.M. and Cox,J.,1992,「The Goal」,2nd Edition,North River Press.齊若蘭譯,1996,目標-簡單而有效的常識管理,天下文化出版公司。
[3] D. Bergamaschi, “Order Review and Release Strategies in a Job Shop Environment: a Review and a Classification”, International Journal of Production Research, Vol. 35, No. 2, pp. 399-420, 1997.
[4] P. M. Bobrowski, “Implementing a Loading Heuristic in a Discrete Release Job Shop”, International Journal of Production Research, Vol. 27, No. 11, pp. 1935-1948, 1989.
[5] J. C. Chen, H. Rau, and C. W. Chen, “Integrated Capacity Planning for Semiconductor Fabrication”, Proceedings of the 33rd International Conference on Computers & Industrial Engineering, Jeju Island, Korea, 2004.
[6] R. Cigolini, M. Perona, and A. Portioli, “Comparison of Order Review Techniques in a Dynamic and Uncertain Job Shop Environment”, International Journal of Production Research, Vol. 36, No. 11, pp. 2931-2951, 1998.
[7] P. Damodaran and S. Melouk, “Comparison of Push and Pull Systems with Transporters: A Metamodelling Approach”, International Journal of Production Research, Vol. 40, No. 12, pp. 2923-2936, 2002.
[8] H. S. Ham, “Job Route Selection Model for Workload Balancing between Workstations in Flexible Flow Line”, Production Planning & Control, Vol. 7, No. 4, pp. 430-438, 1996.
[9] P. Henrich, M. Land and G. Gaalman, “Grouping Machines for Effective Workload Control”, 13th International Working Seminar on Production Economics Conference Proceedings, Vol. 4, pp.141-160, 2004.
[10] M. H. Hung, Edward Wang, and Ivan Wang, “Using Simulation and Daily-Demand Method to Analyze the Capacity Utilization for Product-Mix in Semiconductor Fabrication”, Semiconductor Manufacturing Technology Workshop, pp.302 -306, 2002.
[11] V. Jayaraman and H. Pirkul, “Planning and Coordination of Production and Distribution Facilities for Multiple Commodities”, European Journal of Operational Research, Vol. 133, pp. 394-408, 2001.
[12] R. C. Leachman, R. F. Benson, C. Liu, and D. J. Raar, “IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation-Semiconductor Sector”, INTERFACES, 26, 6-37, January-February, 1996.
[13] H. Matsuura, H. Tsubone, and K. Kataoka, “Comparison between Simple Infinite Loading Considering a Workload Status under Uncertainty in Job Operation Times”, International Journal of Production Economics, Vol. 40, pp. 45-55, 1995.
[14] M. Sambasivan and C. P. Schmidt, “A Heuristic Procedure for Solving Multi-plant, Multi-item, Multi-period Capacitated Lot-sizing Problems,” Asia-Pacific Journal of Operational Research, Vol. 19, pp. 87-105, 2002.
[15] R. Swarnkar and M. K. Tiwari, “Modeling Machine Loading Problem of FMSs and Its Solution Methodology Using a Hybrid Tabu Search and Simulated Annealing-Based Heuristic Approach”, Robotics and Computer-Intrgrated Manufacturing, Vol. 20, pp.199-209, 2003.
[16] M. K. Tiwari and N. K. Vidyarth, “Solving Machine Loading Problem in a Flexible Manufacturing System Using a Genetic Algorithm Based Heuristic Approach”, International Journal of Production Research, Vol. 38, No. 14, pp. 3357-3384, 2000.
[17] J. C. Wortman, M. J. Euwe, M. Taal, and V. C. S. Wiers, “A Review of Capacity Planning Techniques within Standard Software Package”, Production Planning and Control, Vol. 7, No. 2, pp. 117-128, 1996.
[18] Vollmann,Thomas E.,William L. Berry,D. Clay Whybark「Manufacturing Planning and Control Systems 4th」,Irwin/McGraw-Hill,1997.
[19] 陳信嘉,「類神經網路應用於群組技術之機器分群及工件分族」,元智工學院工業工程系,碩士論文,1993。[20] 郭英婷,「群組技術之相似係數法的比較與研究」,元智工學院工業工程系,碩士論文,1994。[21] 周永昌,「ART類神經網路在群組技術上的應用」,元智工學院工業工程系,碩士論文,1994。
[22] 蔡志弘,「零工型工廠交期設定模式之構建」,交通大學工業工程與管理系,碩士論文,1997。[23] 陳國隆,「可預防暫時型瓶頸產生之晶圓製造廠投料模式」,交通大學工業工程與管理系,碩士論文,1997。[24] 李漢星,「以限制理論為基礎的訂單管理系統之探討」,東海大學工業工程系,碩士論文,1998。[25] 陳建宇,「限制理論在印刷電路板排程之應用」,元智大學工業工程系,碩士論文,1998。[26] 廖女琇,「訂單釋放控制之交期指定模式探討-IC 封裝廠為例」,元智大學工業工程與管理系,碩士論文,1998。[27] 曾綜源,「封閉迴圈式主生產排程再排程之研究—以晶圓製造廠為例」,交通大學工業工程與管理系,碩士論文,1998。[28] 黃承龍,「瓶頸漂移現象之分析與其管理對策之研究」,交通大學工業工程與管理系,碩士論文,1999。[29] 黃宏文,「產能管理概論」,交通大學工業工程與管理系,博士班研究心得報告,1999。
[30] 戴君彥,「晶圓製造動態因應狀態派工」,中原大學工業工程系,碩士論文,2000。[31] 邱俊智,「有限產能下之投料模式構建與應用之研究—以半導體測試廠為例」,中原大學工業工程系,碩士論文,2000。[32] 何晉凱,「多層印刷電路板廠之整合產能規劃」,元智大學工業工程系,碩士論文,2001。[33] 陳建銘,「多廠區緊急訂單承接評估及跨廠產能規劃探討」,政治大學資訊管理系,碩士論文,2003。[34] 黃萱懿,「印刷電路板工廠現場排程之研究」,政治大學資訊管理系,碩士論文,2003。[35] 簡秀安,「TFT-LCD 產業陣列製程投料機制之建構與績效分析」,東海大學工業工程與管理系,碩士論文,2003。[36] 呂春美,「晶圓測試廠產能規劃研究」,中原大學工業工程與管理系,碩士論文,2003。[37] 黃國峰,「限制理論應用在印刷電路板產品組合決策研究」,中山大學企業管理系,碩士論文,2003。[38] 謝明諺,「策略性調整主生產排程以減少瓶頸漂移」,華梵大學工業管理學系,碩士論文,2004。[39] 葉美伶,「應用集體緩衝於瓶頸迴流生產型態之限制驅導式主生產排程方法」,中華大學科技管理系,碩士論文,2004。[40] 徐梅芳,「半導體封裝廠產能規劃研究」,中原大學工業工程系,碩士論文,2005。[41] 蘇裕國,「TOC環境下的產能與負荷規劃-具迴流與組裝作業特性」,華梵大學工業管理學系,碩士論文,2004。[42] 廖建閎,「考慮瓶頸漂移及多瓶頸情境之MTO與MTS混線生產環境下生產控制之研究」,交通大學工業工程與管理系,碩士論文,2005。[43] 張百棧,「生產管理」,華泰書局,1996。
[44] 吳鴻輝、李榮貴,「限制驅導式現場排程與管理技術」,全華科技圖書,1999。
[45] 李榮貴、張盛鴻,TOC限制理論,中國生產力中心,2005。
[46] 工業技術研究院,http://www.itri.org.tw,ITIS產業評析。
[47] 台灣電路板協會網站 http://www.tpca.org.tw/ ,協會週報,2006。
[48] 限制管理(TOC)教育發展中心(台灣地區) http://www.anser.com.tw。
[49] 電子工業研究分析機構 Prismark,期刊,2006。