|
[1]Agra, Agostinho, and Miguel Constantino. "Lotsizing with backlogging and start-ups: The case of Wagner–Whitin costs." Operations Research Letters25.2 (1999): 81-88. [2]Baker, Kenneth R. "An experimental study of the effectiveness of rolling schedules in production planning." Decision Sciences 8.1 (1977): 19-27. [3]Bloemen, R., and J. Maes. "A DSS for optimizing the aggregate production planning at Monsanto Antwerp." European Journal of Operational Research61.1 (1992): 30-40. [4]Dave, Upendra. "A deterministic lot‐size inventory model with shortages and a linear trend in demand." Naval Research Logistics (NRL) 36.4 (1989): 507-514. [5]Eppen, Gary D., R. Kipp Martin, and Linus Schrage. "OR practice—A scenario approach to capacity planning." Operations Research 37.4 (1989): 517-527. [6]Glover, Fred, et al. "An integrated production, distribution, and inventory planning system." Interfaces 9.5 (1979): 21-35. [7]Heath, David C., and Peter L. Jackson. "Modeling the evolution of demand forecasts ITH application to safety stock analysis in production/distribution systems." IIE transactions 26.3 (1994): 17-30. [8]Jones, Thomas C., and Daniel W. Riley. "Using inventory for competitive advantage through supply chain management." International Journal of Physical Distribution & Logistics Management 15.5 (1985): 16-26. [9]King, R. H., and R. R. Love Jr. "Coordinating decisions for increased profits."Interfaces 10.6 (1980): 4-19. [10] Kumar, Akhil, and Graham Sharman. "We love your product but where is it."Sloan Management Review 33.2 (1992): 93-99. [11] Manne, Alan S. "Programming of economic lot sizes." Management Science4.2 (1958): 115-135. [12] Spitter, J. M., A. G. De Kok, and N. P. Dellaert. "Timing production in LP models in a rolling schedule." International Journal of Production Economics 93 (2005): 319-329. [13] Sridharan, V., and R. Lawrence LaForge. (1989) "The impact of safety stock on schedule instability, cost and service." Journal of Operations Management 8.4 (1989): 327-347. [14] Stadtler, Hartmut. "Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows." Operations Research 51.3 (2003): 487-502. [15] Sullivan, Robert S., and Stephen C. Secrest. "A simple optimization DSS for production planning at Dairyman''s Cooperative Creamery Association."Interfaces 15.5 (1985): 46-53. [16] Wagner, Harvey M. "Research portfolio for inventory management and production planning systems." Operations Research 28.3-part-i (1980): 445-475. [17] Wagner, Harvey M., and Thomson M. Whitin. "Dynamic version of the economic lot size model." Management science 5.1 (1958): 89-96. [18] Zangwill, Willard I. "A deterministic multi-period production scheduling model with backlogging." Management Science 13.1 (1966): 105-119.
|