|
1. Abdel-Hameed, M. S., 1987, An imperfect maintenance model with block replacement, Applied Stochastic Models and Data Analysis, 3, 63-72. 2. Agnihothrj, S. R., Kenett, R. S., 1995, The impact of defects on a process with rework, European Journal of Operational Research, 80, 308-327. 3. Ait Kadi, D., Cleroux R., 1988, Optimal block replacement policies with multiple choice at failure, Naval Research Logistics, 35, 99-110. 4. Ait Kadi, D., Beaucaire C., Cleroux R., 1990, A periodic maintenance model with used equipment and random minimal repair, Naval Research Logistics, 37, 855-865. 5. Akelia, R. Kumar, P. R., 1986, Optimal control of production rate in a failure prone manufactuing systems, IEEE Transactions on Automatic Control, 31, 116-126. 6. Bai, D. S., Yun W. Y., 1986, An age replacement policy with minimal repair cost limit, IEEE Transactions on Reliability, 35, 452-454. 7. Barlow, R. E., Hunter L. C., 1960, Optimal Preventive Maintenance Policies. Operations Research, 8, 90-100. 8. Barlow, R. E., Proschan F., 1965, Mathematical Theory of Reliability, Wiley, New York. 9. Beichelt, F., 1981, A generalized block-replacement policy, IEEE Transactions on Reliability, 2, 171-172. 10. Ben-Daya, M., 1999, Integrated production maintenance and quality model using the imperfect maintenance concept. IIE Transactions, 31, 491-501. 11. Ben-Daya, M., 2002, The economic production lot-sizing problem with imperfect production and imperfect maintenance. International Journal of Production Economics, 76, 257-264. 12. Ben-Daya, M., Makhdoum M. A., 1998, Integrated production maintenance and quality model under various preventive maintenance policies. Journal of the Operational Research Society, 49, 840-853. 13. Berg, M., Bienvenu M., Cleroux R., 1986, Age replacement policy with age-dependent minimal repair, INFOR, 24, 26-32. 14. Berg, M., Cleroux R., 1982, The block replacement problem with minimal repair and random repair costs, Journal of Statistical Computation and Simulation, 15, 1-7. 15. Bhat, B. R., 1969, Used item replacement policy, Journal of Applied Probability, 6, 309-318. 16. Bielecki, T., Kumar, P. R., 1988, Optimality of zero-inventory policies for unreliable manufactuing systems, Operations Research, 36, 532-541. 17. Block, H. W., Borges W. S., Savits T. H., 1985, Age-dependent minimal repair, Journal of Applied Probability, 22, 370-385. 18. Boland, P. J., 1982, Periodic replacement when minimal repair costs vary with time, Naval Research Logistics, 29, 541-546. 19. Boland, P. J., Proschan F., 1982, Periodic replacement with increasing minimal repair costs at failure, Operations Research, 30, 1183-1189. 20. Cleroux, R., Dubuc S., Tilquin C., 1979, The age replacement problem with minimal repair and random repair cost,” Operations Research, 27, 1158-1167. 21. Chern, C. C., Yang, P., 1999, Determining a threshold contorl policy for an imperfect production system with rework jobs, Naval Research Logistics, 46, 273-301. 22. Cohen, M. A., 1977, Joint Pricing and Ordering Policy for Exponentially Decaying Inventory with Known Demand. Naval Research Logistics, 24, 257-268. 23. Covert, R. P., Philip, G. C., 1973, An EOQ Model for Items with Weibull Distribution Deterioration. AIIE Transactions, 5, 323-326. 24. Cox, R., 1962, Renewal Theory, Methuen, London. 25. Crookes, P. C. I., 1963, Replacement strategies, Operational Research, 14, 167-184. 26. Dave, U., 1979, On a discrete-in-time order level inventory model for deteriorating items, Journal of the Operational Research Society, 30, 349-354. 27. Deb, M., Chaudhuri, K. S., 1987, A note on the heuristic for replenishment of trended inventory considering shortages, Journal of the Operational Research Society, 38, 459-463. 28. Donaldson, W. A., 1977, Inventory replenishment policy for a linear trend in demand — an analytical solution, Operational Research, 28, 663-670. 29. Douglas, C. Montgomery, 1991, Introduction to Statistical Quality Control (2ed), John Wiley & Sons, Inc. 30. Elsayed, E. A., Teresi, C., 1983, Analysis of inventory systems with deterioating items, International Journal of Production Research, 21, 449-460. 31. Ghare, P. M., Schrader, G. F., 1963, A Model for Exponentially Decaying Inventory. Journal of Industrial Engineering, 14, 238-243. 32. Glasser, G. J., 1967, The age replacement problem, Technometrics, 9, 83-91. 33. Groenevelt, H., Pintelon, L., Seidmann, A. 1992a, Production lot sizing with machine breakdowns, Management Science, 38, 104-123. 34. Groenevelt, H., Pintelon, L., Seidmann, A. 1992b, Production batching with machine breakdowns and safety stocks, Operations Research, 40, 959-971. 35. Hariga, M. A., 1994, The inventory lot-sizing problem with continuous time-varying demand and shortages, Journal of the Operational Research Society, 45, 827-837. 36. Hariga, M. A., Ben-Daya M., 1998, The inventory lot-sizing problem with continuous time-varying demand and shortages, Journal of the Operational Research Society, 45, 827-837. 37. Kim, C. H., Hong, Y., 1997, An extended EMQ model for a failure prone machine with general lifetime distribution, International Journal of Production Economics, 49, 215-223. 38. Kim, C. H., Hong, Y., 1999, An optimal production run length in deteriorating production proceses, International Journal of Production Economics, 58, 183-189. 39. Kim, C. H., Hong, Y., Chang, S. Y., 2001, Optimal production run length and inspection schedules in a deteriorating production proceses, IIE Transcations, 33, 421-426. 40. Kimemia, J., Gershwin, S. B., 1983, An algorithm for the computer comtrol of a flexible manufacturing system, IIE Transcations, 15, 353-362. 41. Lee, H. L., 1992, Lot sizing to reduce capacity utilization in a production process with defective items, process correction, and rework, Management Science, 38, 1314-1328. 42. Lee, H. L., Rosenblatt, M. J., 1987, Simultaneous determination of production cycles and inspection schedules in a production system, Management Science, 33, 1125-1136. 43. Lee, J. S., Park, K. S., 1991, Joint determination of production cycle and inspection schedule in a production systems, Journal of Operational Society, 42, 775-783. 44. Lin, T. M., Tseng, S. T., Liou, M. J., 1991, Optimal inspection schedule in the imperfect production system under general shift distribution, Journal of the Chinese Institute of Industrial Engineers, 8, (2), 73-81. 45. Liu, B., Cao, J., 1997, Production control of an unreliable manufacturing system under the assumption of no backlog, Mathematical Methods of Operations Research, 46, 103-117. 46. Maimon, O. Z., Gershwin, S. B., 1988, Dynamic schduling and routing for flexible manufacuring systems that have unreliable machines. Operations Research, 36, 279-292. 47. Makis, V., 1998, Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections, Naval Research Logistics, 45, 165-186. 48. Makis, V., Fung, J., 1998, An EMQ model with inspections and random machine failures, Journal of the Operational Research Society, 49, (1), 66-76. 49. Mandal, B., Pal, A. K., 1998, Order level inventory system with ramp type demand rate for deteriorating items, Journal of Interdisciplinary Mathematics, 1, 49-66. 50. Misra, R. B., 1975, Optimum Production Lot Size Model for a System with Deteriorating Inventory. International Journal of Production Research, 13, 495-505. 51. Muth, E., 1977, An optimal decision rule for repair vs. replacement, IEEE Transactions on Reliability, 26, 179-181. 52. Nakagawa, T., 1980, A summary of imperfect preventive maintenance policies with minimal repair. Operational Research, 14, (3), 249-255. 53. Nakagawa, T., 1981, Generalized Models for Determining Optimal Number of Minimal Repairs Before Replacement, Journal of Operation Research Society of Japan, 24, 325-357. 54. Nakagawa, T., 1981, A summary of periodic replacement with minimal repair at failure, Journal of the Operations Research Society of Japan, 24, 213-228. 55. Nakagawa, T., 1982, A modified block replacement with two variables, IEEE Transactions on Reliability, 32, 398-400. 56. Nakagawa, T., Kowada M., 1983, Analysis of system with minimal repair and its application to replacement policy, European Journal of Operational Research, 12, 176-182. 57. Nakagawa, T. 1988, Sequential imperfect preventive maintenance policies. IEEE Transactions on Reliability, R-37, 295-298. 58. Nguyen, D. G., Murthy D. N. P., 1982, Optimal Burn-In Time to Minimize Cost for Products Sold Under Warranty. IIE Transcations, 14, 167-174. 59. Nguyen, D. G., Murthy D. N. P., 1984, A combined block and repair limit replacement policy, Journal of the Operational Research Society, 35, 653-658. 60. Pham. H., Wang H., 1996, Imperfect maintenance. European Journal of Operational Research, 94, 425-438. 61. Porteus, E. L., 1986, Optimal lost-sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144. 62. Rahim M. A., 1994, Joint determination of production quantity, inspection schedules and control chart design. IIE Transactions, 26, (6), 2-11. 63. Rahim M. A., Ben-Daya M., 1998, A generalized economic model for the joint determination of production run, inspection schedules and control chart design. International Journal of Production Research, 36, 277-289. 64. Rosenblatt, M. J., Lee, H. L. 1986, Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55. 65. Ross S. M. 1970, Applied probability Models with Optimization Applications, Holden-Day (San Francisco, CA). 66. Sharifnia, A., 1988, Production control of a manufactuing system with multiple machine states, IEEE Transactions on Automatic Control, 33, 620-625. 67. Sheu, S. H., 1998, A generalized age and block replacement of a system subject to shocks. European Journal of Operational Research, 108, 345-362. 68. Sheu, S. H., 1992, Optimal block replacement policies with multiple choice at failure, Journal of Applied Probability, 29, 129-141. 69. Sheu. S. H., Griffith W. S., Nakagawa T., 1995, Extended optimal replacement model with random minimal repair costs,” European Journal of Operational Research, 85, 636-649. 70. Sheu, S. H., Griffith W. S., 1996, Optimal Number of Minimal Repairs Before Replacement of A System Subject To Shocks, Naval Research Logistics, 43, 319-333. 71. Sheu, S. H., 1996, A modified block replacement policy with two variables and general random minimal repair cost, Journal of Applied Probability, 33, 557-572. 72. Sheu, S. H., 1999, A general ordering policy with number-dependent minimal repair and random lead time,” Annals of Operations Research, 91, 277-250. 73. Silver, E. A., Peterson, R., 1985, Decision Systems for Inventory Management and Production Planning, John Wiley (New York). 74. Silver, E. A., Pyke, D. F., Peterson, R., 1998, Inventory Management and Production Planning and Scheduling, John Wiley (New York). 75. Tahara, A., Nishida T., 1975, Optimum replacement policy for minimal repair model,” Journal of Operations Research Society of Japan, 18, 113-124. 76. Tango, T. 1978, Extended block replacement policy with used item, Journal of Applied Probability, 15, 560-572. 77. Wang, C. H., Sheu, S. H., 2001, A general ordering policy with number-dependent minimal repair and random lead time, Computers and Operations Research, 28, 1093-1110.
|