[1]陳奕翔,《飛行操作風險評估系統(FORAS)之風險因素權重分析》,碩士論文,國立成功大學民航研究所,2007。[2]黃清賢,《危害分析與風險評估》,第二版,三民書局出版,ISBN:978-957-142-312-8,2011。
[3]黃敬元,《基於FORAS之高飛航風險航班關鍵因素搜尋》,碩士論文,淡江大學資訊管理學系,2011。[4]張紹勳,《模糊多準則評估法及統計》,五南圖書出版,ISBN:978-957-11-6583-7,2012。
[5]葉鎰維,《基於雲端運算的飛航作業風險評估架構》,碩士論文,淡江大學資訊管理學系,2012。[6]Blair, A. R., Nachtmann, R., Saaty, T. L., & Whitaker, R. “Forecasting the resurgence of the US economy in 2001: An expert judgment approach.” Socio-Economic Planning Sciences, (36:2), 2002, pp. 77-91.
[7]Dr. Michael Stamatelatos, Probabilistic Risk Assessment: What Is It And Why Is It Worth Performing It?
http://www.hq.nasa.gov/office/codeq/qnews/pra.pdf , accessed 2013.
[8]Flight Safety Foundation, Guide to methods & tools for airline flight safety analysis, http://flightsafety.org/files/analytical_methods_and_tools.pdf , accessed 2012.
[9]Hsu, H. M., Wey, W. M. and Tsai, P. J.” The Applications of Analytic Network Process to Priorities of Interdependent Housing Project Selection.” Journal of Architecture, vol. 62, pp. 49-74, 2007.
[10] International Civil Aviation Organization, 2013 Safety Report ICAO, http://www.icao.int/safety/Documents/ICAO_2013-Safety-Report_FINAL.pdf, accessed 2013/05/29.
[11] Jharkharia, S., & Shankar, R. “IT enablement of supply chains: Modeling the enablers.” International Journal of Productivity and Performance Management, (53:8), 2004, pp. 700-712.
[12] Kamiyama, N. “Designing data center network by analytic hierarchy process.” Computer Networks, (57:3), 2012, pp. 658-667.
[13] Kim, S., & Whang, K. “Forecasting the capabilities of the Korean civil aircraft industry.” Omega, (21:1), 1993, pp. 91-98.
[14] Lee, J. W., & Kim, S. H. “Using analytic network process and goal programming for interdependent information system project selection. “Computers & Operations Research, (27:4), 2000, pp. 367-382.
[15] Lee, J. W., & Chang, Y. “Risk assessment model on flight-safety management.” Transportation Planning Journal, vol. 34, 2005, pp. 145-176.
[16] Luxhoj, J. T. “Probabilistic causal analysis for system safety risk assessments in commercial air transport,” Proceedings of the Workshop on Investigating and Reporting of Incidents and Accidents, 2003, pp. 1738-1750.
[17] Luxhoj, J. T., & Coit, D. W. “Modeling low probability/high consequence events: An aviation safety risk model.” Reliability and Maintainability Symposium, 2006. RAMS''06. Annual, pp. 215-221.
[18] Michael, H., John, M., “Flight Operations Risk Assessment System (FORAS),” International Air Safety Seminar, Flight Safety Foundation, 2002.
[19] Michael, H., Osborne, D.M., Ross, D., Boyd, D., and Brown, B.G., “The Flight Operations Risk Assessment System,” Proceedings of the SAE Advances Safety Conference, Society of Automotive Engineers, Jan. 1999.
[20] Niemira, M. P., & Saaty, T. L. “An analytic network process model for financial-crisis forecasting. International Journal of Forecasting,” (20:4), 2004, pp. 573-587.
[21] Nuclear Regulatory Commission(NRC), Fact Sheet on Probabilistic Risk Assessment, http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/probabilisticd-risk-asses.html , accessed 2013.
[22] Partovi, F. Y. “An analytical model of process choice in the chemical industry.” International Journal of Production Economics, (105:1), 2007, pp. 213-227.
[23] Saaty, T. L. & Takizawa, Masahiro, “Dependence and independence: From linear hierarchies to nonlinear networks,” European Journal of Operational Research, vol. 26, 1986, pp. 229-237.
[24] Saaty, T. L., Decision making with dependence and feedback: The analytic network process, Pittsburgh, PA: RWS Publication, 1996.
[25] Saaty, T. L., The analytic network process, Pittsburgh, PA: RWS Publication, 2001.
[26] Saaty, T. L., Theory and applications of the analytic network process: Decision making with benefits, opportunities, costs and risks. Pittsburgh, PA: RWS Publications, 2005.
[27] System Safety Handbook: Practices and Guidelines for ConductingSystem Safety Engineering and Management, December 2000. FederalAviation Administration [On-line], http://www.faa.gov/regulations_policies/handbooks_manuals/aviation/riskmanagement/ss_handbook/media/Chap9_1200.pdf , accessed 2012
[28] Ulengin, F., & Ulengin, B. “Forecasting foreign exchange rates: A comparative evaluation of AHP.” Omega, (22:5), 1994, pp. 505-519.
[29] Waller, R. A. &Covello, V. T. “Low-robability/high-consequence risk analysis”, Plenum Press New York; London, 1984.
[30] W. K. Lee and Y. H. Chang, “Applying the fuzzy FMECA to assess the risks of flight-safety,” Civil Aviation Journal, vol. 7, pp. 1–22, 2005.
[31] YuKsel, S. (2007). “An integrated forecasting approach to hotel demand.” Mathematical and Computer Modeling, (46:7), 2007, pp. 1063-1070.