|
1. Adams, M., Componation, P., Czarnecki, H., and Schroer, B. J., 1999, Simulation as a tool for continuous process improvement. Proceedings of the 1999 Winter Simulation Conference, Phoenix, Arizona, USA, 766-773. 2. Agustin, R. O. and Santiago, F., 1996, Single-Minute Exchange of Die, IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 214-217. 3. Ahlstrom, P., 1998, Sequences in the implementation of lean production. European Management Journal, 16 (3), 327-334. 4. Al-Harbi, K. M., 2001, Application of the AHP in project management, International Journal of Project Management, 19 (1), 19-27. 5. Arbos, L.C., 2002, Design of a rapid response and high efficiency service by lean production principles: methodology and evaluation of variability of performance. International Journal of Production Economics, 80 (2), 169-183. 6. Arbulu, J. R., and Tommelein, I. D., 2002, Value stream analysis of construction supply chains: Case study on pipe supports used in power plants. Proceedings IGLC-10, Aug. 2002, Gramado, Brazil. 7. Bicheno, J., Holweg, M., and Niessmann, J., 2001, Constraint batch sizing in a lean environment. International Journal of Production Economics, 73 (1), 41-49. 8. Braiden, B.W., and Morrison, K.R., 1996, Lean manufacturing optimization of automotive motor compartment System. Computer & Industrial Engineering, 31 (1-2), 99-102. 9. Donatelli, A. J., and Harris, G. A., 2002, Combining value stream mapping and discrete event simulation. Conf. Huntsville Simulation (HSC 2002), Huntsville, AL. 10. Ford, L. R., and Fulkerson, D. R., 1962, Flows in Networks (N.J: Princeton University Press). 11. Hazra, J., Schweitzer, P. J., and Seidmann, A., 1999, Analyzing closed Kanban-controlled assembly systems by iterative aggregation-disaggregation, Computers & Operations Research, 26 (10-11), 1015-1039. 12. Heckerman, D., Mannila, H., Pregibon, D., and Uthurusamy, R., 1997, Proceedings of the Third International Conference on Knowledge Discovery and Data Mining, (Menlo Park, CA: AAAI Press). 13. Hines, P., and Taylor, D., 2000, Going Lean (UK: Lean Enterprise Research Centre). 14. Huang, C. C. and Kusiak, A., 1996, Manufacturing control with a push-pull approach, International Journal of Production Research, 36 (1), 251-275. 15. Jones, D. T., Hines, P., and Rich, N., 1997, Lean logistics, International Journal of Physical Distribution & Logistics Management, 27 (3/4), 153-173. 16. Karlsson, C., and Ahlstrom, P., 1996, Assessing changes towards lean production. International Journal of Operations & Production Management, 16 (2), 24-41. 17. Kelton, W. D., Sadowski, R. P., and Sadowski, D. A., 2001, Simulation with arena, (IN: McGraw-Hill Science/Engineering/Math). 18. Kilpatrick, J., 2002, Reducing set up times: A foundation for lean manufacturing, 2002 Utah Manufacturing Extension Partnership. 19. Kobayashi, M., Makita, T., Matsui, S., Koyama, M., Fujii, N., Hatono, I., and Ueda, K., 2001, Floor layout planning method based on self-organization, Semiconductor Manufacturing Symposium, 2001 IEEE International, 381 — 384. 20. Komorowski, J., and Zytkow, J., 1997, Principles of Data Mining and Knowledge Discovery, (New York: Springer-Verlag). 21. Kusiak, A. and Tseng, T-L., 1999, Modeling approach to data mining. Proceedings of the Industrial Engineering and Production Management Conference, Glasgow, Scotland. 22. Kusiak, A., Kern, J. A., Kernstine, K. H., and Tseng, Bill, T. L., 2000, Autonomous decision-making: A data mining approach, IEEE Transactions on Information Technology in Biomedicine, 4 (4), 274-284. 23. Lee, B., 2001, Value stream mapping, IE 780S-Lean Manufacturing IMfge at Wichita State University. 24. Leitch, R. A., 2001, Effect of stochasticity, capacity and lead time cost drivers on WIP and throughput in a pull production environment, Management Accounting Research, 12 (2), 167—196. 25. Lin, Y. H. and Lee, C. E., 2001, Theory and Methodology: A total standard WIP estimation method for wafer fabrication, European Journal of Operational Research, 131 (1), 78-94. 26. Liu, C.M., 2000, Study on optimal machine layout for precision fabrication plants. Report of National Science Council of Taiwan (NSC89-2213-E-035-061). 27. Moore, E. F., 1957, The shortest path through a maze. Proceedings of the International Symposium on the Theory of Switch, Part II, 285-292. 28. Nye, T. J., Jewkes, E. M. and Dilts, D. M., 2001, Theory and Methodology: Optimal investment in setup reduction in manufacturing systems with WIP inventories, European Journal of Operational Research, 135 (1), 128-141. 29. Oz, E., 2000, Management Information Systems 3rd Edition, (USA: Course Technology). 30. Pan, J.C.H., and Chen, J.S., 2002, Minimizing makespan in re-entrant permutation flow-shops. Journal of the Operational Research Society, 54 (6), 642-653. 31. Papadopoulosa, H.T., and Vidalisb M.I., 2001, Minimizing WIP inventory in reliable production lines, Int. J. Production Economics, 70 (2), 185-197. 32. Pawlak, Z., 1991, Rough Sets: Theoretical Aspects of Reasoning about Data, (Norwell, MA: Kluwer Academic Publishers). 33. Rother, M., and Shook, J., 1999, Learning to see: value stream mapping to add value and eliminate muda 1, 2nd ed. Brookline, MA: The Lean Enterprise Institute, Inc. 34. Rother, M., and Shook, J., 1999, Learning to See, The Lean Enterprise Institute, Brookline, MA. 35. Saaty,T.L.,1980, The analytic hierarchy process: Planning, priority setting, resource allocation, (New York: McGraw-Hill). 36. Senge, P.M., 1990, The Fifth Discipline (New York: Doubleday/Currency). 37. Shingo, S., 1981, A Study of the Toyota Production System from an Industrial Engineering Viewpoint (Cambridge, MA: Productivity Press). 38. Shingo, S., 1983, Single Minute Exchange of Dies (Cambridge: Productivity Press). 39. Smith, R., 2000, State of the art in process integration, Applied Thermal Engineering, 20 (15-16), 1337-1345. 40. Sullivan, W. G., McDonald, T. N., Van Aken, E. M., 2002, Equipment replacement decisions and lean manufacturing. Robotics and Computer Integrated Manufacturing, 18 (3-4), 255-265. 41. Swiniarski, R. W. and Skowron, A., 2003, Rough set methods in feature selection and recognition, Pattern Recognition Letters, 24 (6), 833-849. 42. Taylor, D., 1999, Parallel incremental transformation strategy: An approach to the development of lean supply chains. International Journal of Logistics: Research and Applications, 2 (3), 305-323. 43. Tseng, Y. J., and Liu, C. C., 2001, Concurrent analysis of machining sequences and fixturing setups for minimizing setup changes for machining mill-turn parts. International Journal of Production Research, 39 (18), 4197-4214. 44. Tsourveloudis, N.C., Dretoulakis, E., and Ioannidis, S., 2000, Fuzzy work-in-process inventory control of unreliable manufacturing systems, Information Sciences, 127 (1-2), 69-83. 45. Warnecke, H. J., and Huser, M., 1995, Lean production. International Journal of Production Economics, 41 (1-3), 37-43. 46. Womack, J. P., and Jones, D. T., 1996, Lean Tthinking: Banish Waste and Create Wealth in Your Corporation (New York, NY: Simon & Schuster). 47. Wu, M.C., 2002, Scrap rules for small lots in wafer fabrication. Report of National Science Council of Taiwan (NSC91-2213-E009-134). 48. Yuan, J., 2002, Preventive maintenance strategy on improving the capacity and yield in manufacturing process. Report of National Science Council of Taiwan (NSC91-2213-E007-097). 49. Ziarko, W.P., 1994, Rough Sets, Fuzzy Sets and Knowledge Discovery (New York: Springer-Verlag). 50. url1: http://mciiw.itri.org.tw/, Industrial Development Bureau Ministry of Economic Affairs 51. url2: http://www.cpcnets.com.tw/tpm/Frame_A00.htm, China Productivity Center
|