|
[1] “Design Implementation Services,” http://www.tsmc.com.tw/index.html [2] J. K. Lu, S. T. Hsieh, C. C. Feng, H. W. Hsu,“B2B in TSMC Turnkey Services,” Semiconductor Manufacturing Symposium, 2001 IEEE International, 2001, pp 41-44 [3] E. Elam and A. Hinnawi, “UMC serves system design house requirements via new ASICplus program,” http://www.umc.com/english/news/20000201.asp [4] http://www.charteredsemi.com/index.htm [5] PMI Standards Committee, “A Guide to the Project Management Body of Knowledge,” Project Management Institute, 1996 [6] E. M. Goldratt and J. Cox, “The Goal: A Process of Ongoing Improvement,” New York: The North River Press, 1986 [7] E. M. Goldratt, “Critical Chain,” New York: The North River Press, 1997 [8] J. D. C. Little, “A Proof of the Queuing Formula: L= W,” Operations Research, Vol. 9, 1961, pp 383-387 [9] Y. H. Lee, “Supply Chain Model for the semiconductor Industry of Global Market,” Journal of Systems Integration, 10, 2001, pp189-206 [10] W. C. Wu, “A Study of Turnkey Service for Semiconductor,” Master Thesis, Department of Industrial Engineering and Management, National Chiao Tung University, HsinChu, Taiwan, ROC, 2001 [11] P. H. Chen, “A Production Resource Requirement Planning for IC Design House,” Master Thesis, Department of Industrial Engineering and Engineering Management, National Tsing Hua University, Hsinchu, Taiwan, ROC, 1997 [12] http://e-www.motorola.com/, “Motorola Inc.” [13] S. Jain, C. C. Lim, B. P. Gan, and Y. H. Low, “Criticality of Detailed Modeling in Semiconductor Supply Chain Simulation,” Proceedings of the 1999 Winter Simulation Conference, 1999, pp888-896 [14] S. J. Turner, W. Cai, and B. P. Gan, “Adapting a Supply-chain Simulation for HLA,” Proceedings of Fourth 2000 IEEE International Workshop on Distributed Simulation and Real-Time Applications, 2000, pp71-78 [15] Y. C. Lu, “A Production Planning System for IC Design House,” Master Thesis, Department of Industrial Engineering and Engineering Management, National Tsing Hua University, Hsinchu, Taiwan, ROC, 1999 [16] B. S. Chen, “A Framework of Production Planning and Control for IC Design House,” Master Thesis, Department of Industrial Engineering and Engineering Management, National Tsing Hua University, Hsinchu, Taiwan, ROC, 1998 [17] J. W. Chen, “A Study of Lot-Tracking System for IC Design Houses,” Master Thesis, Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan, ROC, 2000 [18] R. Uzsoy, C.Y. Lee and L. A. Martin-vega, “A Review of Production Planning And Scheduling Models In The Semiconductor Industry Part I: System Characteristics, Performance Evaluation And Production Planning,” IIE Transactions, Vol. 24, No. 4, 1992, pp47-60 [19] H. W. Hwang, “The Design of Production Activity Control for Wafer Fabrication Factory,” Master Thesis, Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan, ROC, 1995 [20] I. Duenyas, J. W. Fowler, and L. W. Schruben, “Planning and Scheduling in Japanese Semiconductor Manufacturing,” Journal of Manufacturing Systems, Vol. 13, No. 5, 1994, pp323-332 [21] R. Sturm, F. Frauenhoffer, J. Dorner, O. Kirschenhofer, and T. Reisinger, “Advanced WIP control for Make-to-Order Wafer Fabrication,” Advanced Semiconductor Manufacturing Conference and Workshop, 1999 IEEE/SEMI, 1999, pp31-36 [22] Y. H. Lee, B. K. Lee, and B. Jeong, “Multi-objective production scheduling of probe process in semiconductor manufacturing,” Production Planning & Control, Vol. 11, No. 7, 2000, pp660-669 [23] S. V. Murty and J. W. Bienvenu, “Global Planning at Harris Semiconductor,” 1995 International Symposium on Semiconductor Manufacturing, 1995, pp18-23 [24] R. C. Leachman, “Modeling Techniques for Automated Production Planning in the Semiconductor Industry,” Optimization in Industry: Mathematical Programming and Modeling Techniques in Practice, Chichester, UK, John Wiley & Sons, 1993, pp1-30 [25] C. Liu, “A Modular Production Planning System for Semiconductor Manufacturing,” Ph.D. Dissertation, Department of Industrial Engineering and Operations Research, University of California, Berkeley, Berkeley, CA, 1992 [26] I. M. Ovacik and W. Weng, “A Framework for Supply Chain Management in Semiconductor Manufacturing Industry,” Seventeenth IEEE/CPMT International Electronics Manufacturing Technology Symposium, 1995, pp47-50 [27] J. L. Bouff, “Semiconductor manufacturing: A supply chain management perspective,” Conference on Global Supply Chain Management, Singapore, 1997 [28] A. I. Sivakumar and C. S. Chong, “A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing,” Computer in Industry, Vol. 45, 2001, pp59-78 [29] T. R. Chen and T. C. Hsia, “Scheduling for IC Sort and Test Facilities with Precedence Constraints via Lagrangian Relaxation,” Journal of Manufacturing Systems, Vol. 16, No. 2, 1997, pp117-128 [30] L. P. Leach, “Critical Chain Project Management Improves Project Performance,” Project Management Journal, Vol. 30, No. 2, 1999, pp39-51 [31] Herman Steyn, “An investigation into the fundamentals of critical chain project scheduling,” International Journal of Project Management, Vol. 19, 2000, pp363-369 [32] http://www.pdinstitute.com/, “Project Management Tutorials” [33] S. C. Cook, “Applying Critical Chain to Improve the Management of Uncertainty in Projects,” Master Thesis, Massachusetts Institute of Technology, MA, 1998 [34] C. D. Hsu, “Studying the short cycle time and the model of the due date control for IC packaging factory,” Master Thesis, Department of Industrial Engineering and Management, National Chiao Tung University, HsinChu, Taiwan, ROC, 1998 [35] S. N. Huang, “Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication,” Master Thesis, Department of Industrial Engineering and Management, National Chiao Tung University, HsinChu, Taiwan, ROC, 1999 [36] Tim Lister, “Hallucinations at 37,000 Feet,” IEEE Software, Vol. 15, No. 3, 1998, pp105-107 [37] Y. Shou and K. T. Yeo, “Estimation of Project Buffers in Critical Chain Project Management,” Proceedings of the 2000 IEEE International Conference on Management of Innovation and Technology, Vol. 1, 2000, pp162-167 [38] I. Miller and J. E. Freund, “Probability and Statistics for Engineers,” 2nd Edition, New Jersey: Prentice-Hall, 1977, pp169-170 [39] M. L. Spearman, D. L. Woodruff and W. J. Hopp, “CONWIP: a pull alternative to kanban,” International Journal of Production Research, Vol. 28, No.5, 1990, pp879-894 [40] N. G. Pierce and T. Yurtsever, “Value-Based Dispatching for Semiconductor Wafer Fabrication,” 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop, 2000, pp245-249 [41] P. McGlynn and M. O''Dea, “How to get predictable Throughput times in a Multiple Product Environment,” 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings, 1997, pp27-30 [42] J. Y. Shieh, “A Study of Dispatching Logic for the Photolithography Area and the Furnace Area in a Wafer Fab,” Master Thesis, Department of Industrial Engineering and Management, National Chiao Tung University, HsinChu, Taiwan, ROC, 1998 [43] http://www.emplant.de/, eM-PlantTM
|