|
[1] Y. M. Park, K. Y. Lee, and L. T. O. Youn, “New Analytical Approach for Long-Term Generation Expansion Planning Based on Maximum Principle and Gaussian Distribution Function,” IEEE Trans. on Power Apparatus and Systems, vol.104, no.2, pp.390-397, 1985. [2] J. A. Bloom, “Long-Range Generation Planning Using Decomposition and Probabilistic Simulation,” IEEE Trans. on Power Apparatus and Systems, vol.101, no.4, pp.797-801, 1982. [3] P. Nordlund, D. Sjelvgren, M. V. F. Pereira, and J. A. Bubenko, ”Generation Expansion Planning for Systems with a High Share of Hydro Power,” IEEE Trans. on Power Systems, vol.2, no.1, pp.161-167, 1987. [4] L. T. O. Youn, K. Y. Lee, and Y. M. Park, “Optimal Long-Range Generation Expansion Planning for Hydro-Thermal System Based on Analytical Production Costing Model,” IEEE Trans. on Power Systems, vol.2, no.2, pp.278-286, 1987. [5] S. Majumdar and D. Chattopadhyay, “A Model for Integrated Analysis of Generation Capacity Expansion and Financial Planning,” IEEE Trans. on Power Systems, vol.14, no.2, pp.466-471, 1999. [6] R. Romero, R. A. Gallego, and A. Monticelli, “Transmission System Expansion Planning by Simulated Annealing,” IEEE Trans. on Power Systems, vol.11, no.1, pp.364-369, 1996. [7] R. A. Gallego, A. B. Alves, A. Monticelli, and R. Romero, “Parallel Simulated Annealing Applied to Long Term Transmission Network Expansion Planning,” IEEE Trans. on Power Systems, vol.12, no.1, pp.181-188, 1997. [8] R. A. Gallego, A. Monticelli, and R. Romero, “Transmission System Expansion Planning by an Extended Genetic Algorithm,” IEE Proc.- Gener. Transm. Distrib., vol.145, no.3, pp.329-335, 1998. [9] J. Contreras and F. F. Wu, “Coalition Formation in Transmission Expansion Planning,” IEEE Trans. on Power Systems, vol.14, no.3, pp.1144-1152, 1999. [10] C. T. Su, T. S. Wu, C. L. Huang, and T. H. Lee, “Transmission Capacity Expansion Planning with Economic Dispatching and Flow Evaluation,” Journal of the Franklin Institute, vol.323, no.3, pp.285-295, 1987. [11] R. M. Sawey and D. C. Zinn, “A Mathematical Model for Long Range Expansion Planning of Generation and Transmission in Electric Utility Systems,” IEEE Trans. on Power Apparatus and Systems, vol.96, no.2, pp.657-666, 1977. [12] C. T. Su, T. H. Lee, T. S. Wu, and C. L. Huang, “Production Costing and Reliability Evaluation for Composite Systems with Outages and Uncertainties,” International Journal of Electric Power Systems Research, vol.10, no.3, pp.215-222, 1986. [13] L. Wenyuan and R. Billinton, “A Minimum Cost Assessment Method for Composite Generation and Transmission System Expansion Planning,” IEEE Trans. on Power Systems, vol.8, no.2, pp.628-635, 1993. [14] E. N. Dialynas and N. C. Kskolos, “Comparison of Contingency Enumeration and Monte-Carlo Simulation Approaches Applied to the Reliability Evaluation of Composite Power Systems,” European Journal of Diagnosis and Safety in Automation, Hermes, vol.5, pp.25-48, 1995. [15] W. D. Stevenson, Elements of Power System Analysis, McGraw-Hill, Inc. 1982. [16] C. L. Wadhwa, Electrical Power Systems, John Wiley & Sons, Inc. 1986. [17] Gharles A. Gross, Power System Analysis, John Wiley & Sons, Inc. 1986. [18] A. J. Wood and B. F. Wollenberg, Power Generation, Operation and Control, John Wiley & Sons, Inc. 1996. [19] 楊浩二,線性規劃理論與實際,華泰書局,民國75年8月。 [20] J. Endrenyi, P. Albrecht, R. Billinton, G.E. Marks, N. Reppen, and L. Salvaderi, “Bulk Power System Reliability Assessment — Why and How?” IEEE Trans. on Power Apparatus and Systems, vol.101, no.9, pp.3439-3456, 1982. [21] R. Billinton and R. N. Allan, Reliability Assessment of Large Electric Power Systems, Kluwer Academic Accord Starion, 1988. [22] L. Salvaderi and R. Billinton, “A Comparison Between Two Fundamentally Different Approach to Composite System Reliability Evaluation,” IEEE Trans. on Power Apparatus and Systems, vol.104, no.12, pp.3486-3492, 1982. [23] R. Billinton and E. Khan, “A Security Based Approach to Composite Power System Reliability Evaluation,” IEEE Trans. on Power Systems, vol.7, no.1, pp.65-72, 1992. [24] R. Billinton and R. N. Allan, Reliability Evaluation of Power Systems, Plenum Press, New York, 1984. [25] R. M. Sawey and C. D. Zinn, “A Mathematical Model for Long Range Expansion Planning of Generation and Transmission in Electric Utility Systems,” IEEE Trans. on Power Apparatus and Systems, vol.96, no.2, pp.657-666, 1977. [26] C. T. Su, G. R. Lii, and J. J. Chen, “Long-Term Generation Expansion Planning Employing Dynamic Programming and Fuzzy Techniques,” IEEE International Conference on Industrial Technology, pp.644-649, 2000. [27] G. Wacker and R. Billinton, “Cost of Electric Service Interruptions,” Proc. of IEEE, Electric Utility Systems Planning Issues and Methods, June 1989. [28] Shih-An Yin, Chan-Nan Lu, Liu, E., Yu-Chang Huang, and Chinug-Yi Huang, “Assessment of Interruption Cost to High Tech Industry in Taiwan” IEEE Transmission and Distribution Conference and Exposition, pp.270-275, 2001. [29] H.W. Zaininger, A. J. Wood, H. K. Clark, T. F. Laskowski, and J. D. Burns, Synthetic Electric Utility System for Evaluating Advanced Technologies, EPRI EM-285, Final Report, 1977. [30] 臺灣電力公司企畫處(2000), 長期負載預測(89年至103年), 臺灣電力公司, 台北。 [31] IEEE Committee Report, “IEEE Reliability Test System,” IEEE Trans. on Power Apparatus and Systems, vol.98, no.6, pp.2047-2054, 1979. [32] O. Berloldi, L. Salvaderi, and S. Scalcino, “Monte Carlo Approach in Planning Studies — An Application to IEEE RTS”, IEEE Trans. on Power Systems, vol.3, no.3, pp.1146-1154, 1988. [33] EPRI Report, “Transmission System Reliability Methods,” EL-2526, vol.1, July 1982, Appendix Q.
|