|
Alidaee, Bahram and Rosa, Duane (1997), 'Scheduling parallel machines to minimize total weighted and unweighted tardiness', Computers & Operations Research, 24 (8), 775-88.
Arkin, Esther M and Roundy, Robin O (1991), 'Weighted-tardiness scheduling on parallel machines with proportional weights', Operations Research, 39 (1), 64-81. Azizoglu, Meral and Kirca, Omer (1998), 'Tardiness minimization on parallel machines', International Journal of Production Economics, 55 (2), 163-68. Biskup, Dirk, Herrmann, Jan, and Gupta, Jatinder N. D. (2008), 'Scheduling identical parallel machines to minimize total tardiness', International Journal of Production Economics, 115 (1), 134-42. Bozorgirad, Mir Abbas and Logendran, Rasaratnam (2012), 'Sequence-dependent group scheduling problem on unrelated-parallel machines', Expert Systems with Applications, 39 (10), 9021-30. Dessouky, Maged M (1998), 'Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness', Computers & Industrial Engineering, 34 (4), 793-806. Dogramaci, Ali and Surkis, Julius (1979), 'Evaluation of a heuristic for scheduling independent jobs on parallel identical processors', Management Science, 25 (12), 1208-16. Drobouchevitch, Inna G. and Sidney, Jeffrey B. (2012), 'Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs', Computers & Operations Research, 39 (9), 1919-26. Du, Jianzhong and Leung, Joseph Y-T (1990), 'Minimizing total tardiness on one machine is NP-hard', Mathematics of operations research, 15 (3), 483-95. Eom, D-H, et al. (2002), 'Scheduling jobs on parallel machines with sequence-dependent family set-up times', The International Journal of Advanced Manufacturing Technology, 19 (12), 926-32. Framinan, Jose Manuel and Leisten, Rainer (2008), 'Total tardiness minimization in permutation flow shops: a simple approach based on a variable greedy algorithm', International Journal of Production Research, 46 (22), 6479-98 Guinet, Alain (1995), 'Scheduling independent jobs on uniform parallel machines to minimize tardiness criteria', Journal of Intelligent Manufacturing, 6 (2), 95-103. Gupta, Jatinder ND and Maykut, Albert R (1973), 'Scheduling jobs on parallel processors with dynamic programming', Decision Sciences, 4 (4), 447-57. Ho, Johnny C and Chang, Yih‐Long (1991), 'Heuristics for minimizing mean tardiness for m parallel machines', Naval Research Logistics (NRL), 38 (3), 367-81. Lin, BMT and Jeng, AAK (2004), 'Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs', International Journal of Production Economics, 91 (2), 121-34.
Jin, Feng, Song, Shiji, and Wu, Cheng (2009), 'A simulated annealing algorithm for single machine scheduling problems with family setups', Computers & Operations Research, 36 (7), 2133-38. Kim, Dong-Won, et al. (2002), 'Unrelated parallel machine scheduling with setup times using simulated annealing', Robotics and Computer-Integrated Manufacturing, 18 (3), 223-31. Koulamas, Christos (1997), 'Decomposition and hybrid simulated annealing heuristics for the parallel‐machine total tardiness problem', Naval Research Logistics (NRL), 44 (1), 109-25. Lawler, Eugene L (1964), 'On scheduling problems with deferral costs', Management Science, 11 (2), 280-88. Lee, Young Hoon and Pinedo, Michael (1997), 'Scheduling jobs on parallel machines with sequence-dependent setup times', European Journal of Operational Research, 100 (3), 464-74. Lin, Yang-Kuei, Fowler, John W., and Pfund, Michele E. (2012), 'Multiple-objective heuristics for scheduling unrelated parallel machines', European Journal of Operational Research. Lushchakova, Irina N. (2012), 'Preemptive scheduling of two uniform parallel machines to minimize total tardiness', European Journal of Operational Research, 219 (1), 27-33. Pfund, Michele, Fowler, John W, and Gupta, Jatinder ND (2004), 'A survey of algorithms for single and multi-objective unrelated parallel-machine deterministic scheduling problems', Journal of the Chinese Institute of Industrial Engineers, 21 (3), 230-41. Pfund, Michele, et al. (2008), 'Scheduling jobs on parallel machines with setup times and ready times', Computers & Industrial Engineering, 54 (4), 764-82. Root, James G (1965), 'Scheduling with deadlines and loss functions on k parallel machines', Management Science, 11 (3), 460-75. Sarıçiçek, İnci and Çelik, Cenk (2011), 'Two meta-heuristics for parallel machine scheduling with job splitting to minimize total tardiness', Applied Mathematical Modelling, 35 (8), 4117-26. Shim, Sang-Oh and Kim, Yeong-Dae (2007), 'Scheduling on parallel identical machines to minimize total tardiness', European Journal of Operational Research, 177 (1), 135-46. Suriyaarachchi, Rasika H. and Wirth, Andrew (2004), 'Earliness/tardiness scheduling with a common due date and family setups', Computers & Industrial Engineering, 47 (2-3), 275-88. Uzsoy, R. (1995), 'Scheduling batch processing machines with incompatible job families', International Journal of Production Research, 33 (10), 2685-708. Xi, Yue and Jang, Jaejin (2012), 'Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study', International Journal of Production Economics, 137 (1), 1-10. Yalaoui, Farouk and Chu, Chengbin (2002), 'Parallel machine scheduling to minimize total tardiness', International Journal of Production Economics, 76 (3), 265-79.
|