1. Goldratt , Eliyahu M. and Rami, Avraham , TOC Insights, 2003.
2. Mabin, V. J., & Balderstone, S. J. (2000). The World of the Theory of Constraints, A Review of the International Literature. FL: St. Lucie Press
3. Goldratt, Eliyahu M., It’s Not Luck, The North River Press Publishing Corporation,1994.
4. Goldratt , Eliyahu M.(1992), The Goal(2nd ed.) NY:The Noth River Press.
5. Goldratt ,Eliyahu M.(1996), Production the TOC Way: A Self-Learning Kit NY:The Noth River Press.
6. Fry, T. D., & Blakestone, J. H., & Cox, J. F. (1992). An analysis and discussion of the optimized production technology software and its use. Production on Operation Management Journal, 1(2), 229-242.
7. Goldratt Consulting.(2006), The Strategy & Tactic tree – Reliable Rapid Response(Zycon) Detailed to level 4 .
8. Goldratt Consulting.(2008), Standing on the Shoulders of Giants .Goldratt group.
9. Schragenheim,E., & Dettmer, H. W. (2000).Manufacturing at Warp Speed: optimizing supply chain financial performance. Boca Raton, FL: St.Lucie Press.
10. Schragenheim,E.(2006). Using SDBR in Rapid Response Projects. Goldratt group.
11. Schragenheim,E.(2006). What’s really new in Simplified DBR. Goldratt group.
12. Schragenheim,E.(2009). A Systematic Approach to Common and Expected Uncertainty. Goldratt group.
13. 李榮貴、張盛鴻,TOC限制理論—從有限走向無限。台北縣:中國生產力中心,民國94年。
14. 吳鴻輝、李榮貴。限制驅導式現場排程與管理技術。台北市:全華科技圖書公司,民國88年。
15. 王傳順,「S-DBR應用於具迴流特性製造業之可行性研究」,國立交通大學,碩士論文,民國96年。16. 張家鈞,「S-DBR於MTO環境應用的強化」,國立交通大學,碩士論文,民國97年。17. 王美亭,「透過實驗研究交期不佳之主因」,國立交通大學,碩士論文,民國97年。
18. 柯林斯(Jim Collins) 著,從A到A+,齊若蘭譯,遠流出版事業有限公司,民國91年。
19. 彼得•聖吉(Peter M. Senge)著,第五項修練-學習型組織的藝術與實務,郭進隆 譯,天下文化出版事業有限公司,台北,民國83年。