[1] Bai, D. S. and Lee, K. T., 1998, “An economic design of variable sampling interval control charts”, International Journal of Production Economics, vol. 54, pp. 57-64.
[2] Duncan, A. J., 1971, “The economic design of -charts when there is a multiplic-ity of assignable Causes”, Journal of the American Statistical Association, vol. 66 Issue 333, pp. 107-121.
[3] El-Shal, S. M. and Morris, A. S., 2000, “A fuzzy rule-based algorithm to improve the performance of statistical process control in quality systems”, Journal of Intelli-gent and Fuzzy Systems, vol. 9, pp. 207–223.
[4] Hassen, T., 2002, “On fuzzy and probabilistic control charts”, International Journal of Production Research, vol. 40, pp. 2849–2863.
[5] Kim, D. and Sehun, R., 2002, “Design of a robust fuzzy controller for the arc stabil-ity of CO2 welding process using the Taguchi method”, IEEE Transactions on Sys-tems, Man, and Cybernetics—Part B: Cybernetics, vol. 32, pp. 157-162.
[6] Marion, R. and Zachary, G. S., 2001, “Monitoring the process mean and variance using individual observations and variable sampling intervals,” Journal of Quality Technology, vol. 33, pp. 181-205.
[7] Montgomery, D. C., 2001, Introduction to Statistical Quality Control, 4th Edition, John Wiley & Sons Inc, New York.
[8] Prabhu, S. S., Montgomery, D. C. and Runger, G. C., 1997, “Economic-statistical design of an adaptive chart”, International Journal of Production Economics, vol. 49, pp. 1-15.
[9] Reynolds, M. R., Amin, R. W., Arnold, J. C. and Nachlas, J. A. , 1988, “ charts with variable sampling intervals”, Technometrics, vol. 30, pp. 181-192.
[10] Tagaras, G.., 1998, “A survey of recent developments in the design of adaptive con-trol charts.” Journal of Quality Technology, vol. 30, pp. 212-231.
[11] Tannock, J. D. T., 2003, “A fuzzy control charting method for individuals”, Inter-national Journal of Production Research, vol. 41, pp. 1017–1032.
[12] Tzvi, R. and Wang, J. H., 1990, “Probabilistic and membership approaches in the construction of control charts for linguistic data”, Production Planning & Control, vol. 1, pp. 147-157.
[13] Woodall, W. H., 2000, “Controversies and contradictions in statistical process con-trol”, Journal of Quality Technology, vol. 32, pp. 341-350.
[14] Zadeh, L. A., 1965, “Fuzzy sets”, Information and Control, vol. 8, pp. 338-353.
[15] 林裕章、周昭宇, 2002, “適應性 管制圖之回顧與評估”, 中國統計學報,第40卷第3期, pp.361-390。