|
[1] BWR Owners' Group (BWROG), “Emergency Procedure and Severe Accident Guidelines,” rev.1, 1997. [2] General Electric (GE) Company, “Plant Specific Technical Guidelines (PSTG),” rev.0, 2003. [3] General Electric (GE) Company, “Emergency Operating Procedure (EOP) Flowchart and Emergency Support Procedure (ESP) Writer’s Guide,” rev.0, 2002. [4] Y. Niwa, E. Hollnagel, M. Green, “Guidelines for Computerized Presentation of Emergency Operating Procedures,” Nuclear Engineering and Design, vol. 167, no. 2, p.p.113-127, 1996. [5] Y.S. Jung, Y.C. Shin, I.S. Park, “An Incremental Objective Achievement Model in Computerized Procedure Execution,” Reliability Engineering & System Safety, vol. 70, no. 2, p.p. 185-195, 2000. [6] Y.S. Jung, P.H. Seong, M.C. Kim, “A Model for Computerized Procedures Based on Flowcharts and Success Logic Trees,” Reliability Engineering & System Safety, vol. 83, no. 3, p.p. 351-362, 2004. [7] S. Xu, F. Song, Z.Z. Li, Q.Y. Zhao, W. Luo, X.H. He, G. Salvendy, “An Ergonomics Study of Computerized Emergency Operating Procedures: Presentation Style, Task Complexity, and Training Level,” Reliability Engineering & System Safety, vol. 93, no. 10, p.p. 1500-1511, 2008. [8] F.R. Farmer, “Siting Criteria - A New Approach,” Atom, vol. 128, p.p. 152-170, 1967. [9] United States Nuclear Regulatory Commission (USNRC), “Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants,” 1975. [10] M. Čepin, B. Mavko, “A dynamic fault tree,” Reliability Engineering & System Safety, vol. 75, no. 1, p.p. 83-91, 2002. [11] Taiwan Power Company, “Final Safety Analysis Report (FSAR) for Lungmen Nuclear Power Station Units 1&2,” appendix AA-AB, 2007. [12] M. Karnaugh, “The Map Method for Synthesis of Combinational Logic Circuits,” American Institute of Electrical Engineers, Part I: Communication and Electronics, vol. 72, no. 5, p.p. 593-599, 1953. [13] S. Banerji, “Computer Simulation Codes for the Quine-McCluskey Method of Logic Minimization,” rev.2, 2014.
|