[1] Donald P. Martin, “The Advantages of Using Short Cycle Time Manufacturing Instead of Continuous Flow Manufacturing”, Proceedings of the ASMC, Boston, MA, 1998.
[2] Glassey, C.R. and Resende, M.G.C., “Closed-loop job release control for VLSI circuit manufacturing”, IEEE Transactions on Semiconductor, vol.1, No.1, pp.36-46, Feb 1988.
[3] Jackson, J.R., “Simulation research on job shop production”, Naval Research Logistic Quarterly, vol.14, pp.287-295, 1957.
[4] Kramer, Scott S., “Total Cycle Time Management by Operational Element”, International Semiconductor Manufacturing Science Symposium, pp.17-20, 1989.
[5] Leachman, R.C., Solozano M., and Glassey, C. R., “A queue management policy for release of factory work orders”, Engineering Systems Research Center, University of California, Berkeley, ESRC Report 89-19, CA94720. , 1988.
[6] Lawrence, S. R., and Buss, A. H., “Shifting Production Bottlenecks: Causes, Cures, and Conundrums”, Production and Operations Management, 3/ (1), pp21-37, 1994.
[7] Lu, S. C. H., Ramaswamy, D., and Kumar P.R., “Efficient Scheduling Polices to reduce Mean and Variance of Cycle Time in Semiconductor Manufacturing Plants”, IEEE Transactions on Semiconductor, vol.7, No.3, pp.374-388, 1994.
[8] Ronen, B. an d Spector, “Managing System Constraints: A Cost/ Utilization Approach”, International Journal of Production Research, 30/9, pp.2045-2061, 1992.
[9] Sridharan, V., William, L. B., and Udayabhanu, V., “Freezing the master production schedule under rolling planning horizon,” Management Science, Vol. 33, pp. 1137-1149, 1992.
[10] 吳鴻輝、李榮貴,限制驅導式現場排程與管理技術,全華科技圖書股份有限公司,pp.3-1~3-9,2000 。
[11] 李明煌,「晶圓廠之限制驅導式主生產排程模式研究」,中華大學工業工程與管理研究所,碩士論文,1999。[12] 何正斌,「晶圓製造廠瓶頸管理模式之研究」,華梵大學工業管理學系,碩士論文,2001。
[13] 施盈志,「晶圓製造廠在製品水準之規劃與控制」,國立交通大學工業工程與管理學系,碩士論文,1996。[14] 高正峰,「半導體廠提高達交率的派工法則」,國立交通大學工業工程與管理學系,碩士論文,2003。[15] 黃承龍,「瓶頸漂移現象之分析與其管理對策之研究」,國立交通大學工業工程與管理學系,博士論文, 1998。[16] 馮鈺敏,「考慮晶圓製造廠績效之組合式即時派工法則」,國立交通大學工業工程與管理學系,碩士論文,1997。[17] 曾裕文,「多種生產週期時間產品之派工方法-考量機台當機特性」,國立交通大學工業工程與管理學系,碩士論文,2003。