英文部分
1. Adnan A. Abu-Dayya, Norman C. Beaulieu, “Outage Probabilities in the Presence of Correlated Lognormal Interferers”, IEEE Transactions on Vehicular Technology, 43, pp. 164-173, February 1994.
2. David S. Christensen, “Cost Performance Index Stability”, National Contract Management Journal, 25, p.p. 7-15, 1993.
3. David S. Christensen, “Determining an Accurate Estimate at Completion”, National Contract Management Journal, 25, pp. 17-25. 1993.
4. David S. Christensen, Richard C. Antolini, John W. McKinney, “A Review of Estimate at Completion Research”, Journal of Cost Analysis and Management, pp. 41-62, Spring 1995.
5. David S. Christensen, “Project Advocacy and the Estimate at Completion Problem”, Journal of Cost Analysis, pp. 35-60, Spring 1996.
6. Edmond Levy, “Pricing European Average rate currency options”, Journal of International Money and Finance, 11, pp. 474-491, 1992.
7. Frank T. Anbari, “Earned Value Project Management Method and Extensions”, Project Management Journal, pp. 12-23, December 2003.
8. J. I. Naus, “The Distribution of the Logarithm of the Sum of Two Log-Normal Variates”, Journal of the American Statistical Association, 64, pp. 655-659, June 1969.
9. Lawrence F. Fenton, “The Sum of Log-Normal Probability Distributions in Scatter Transmission Systems”, IEEE Transactions on Communication Systems, 8, pp. 57-67, March 1960.
10. M. A. Hamdan, “The Logarithm of the Sum of Two Correlated Log-Normal Variates”, Journal of the American Statistical Association, 66, pp. 105-106, March 1971.
11. Norman C. Beaulieu, Adnan A. Abu-Dayya, Peter J. McLane, “Estimating the Distribution of a Sum of Independent Lognormal Random Variables”, IEEE Transactions on Communications, 43, pp. 2869-2873, December 1995.
12. Philippe Jorion, Value at Risk, 3rd edition, McGraw-Hill, 2007.
13. Richard Barakat , “Sums of independent lognormally distributed random variables”, Journal of the Optical Society of America, 5, pp. 229-241, March 1976.
14. Schwartz, Stuart C., Y.S. Yeh, “On the Distribution and Moment of Power Sum with Log-Normal Components”, Bell System Technology Journal, 61, pp. 1441-1462, September 1982.
15. Walt Lipke, “A Study of the Normality of Earned Value Management Indicators”, The Measurable News, pp. 1-16, December 2002.
16. Walt Lipke, “Statistical Methods Applied to EVM… the Next Frontier”, The Measurable News, pp. 18-30, Winter 2006.
17. William A. Janos, “Tail of the Distribution of Sums of Log-Normal Variates”, IEEE Transactions on Information Theory, IT-16, pp.299-302, May 1970.
中文部份
1. 余至忠,「實得值(Earned Value)於工程管理上的應用」,國立中央大學,碩士論文,民國92年。2. 吳聰敏,「實獲值管理應用於營建工程專案成本管控之研究」,國立台灣大學,碩士論文,民國96年。3. 林金面,營建管理學,文笙書局,民國94年。
4. 易力行,專案導向企業管理(一)PO-ERP專案企業資源規劃管理,城市吉國際資訊股份有限公司,民國99年。
5. 黃薰慧,「由預算書論營建專案資訊整合」,國立台灣大學,碩士論文,民國99年。6. 詹次洚,「實獲值管理於工程實務之應用研究」,逢甲大學,碩士論文,民國96年。
7. 謝國祥,「完成實值系統(EVMS)在專案管理應用之研究-以高雄捷運某服務合約為例」,國立中山大學,碩士論文,民國89年。