1 Mercer, J., Strategic Planning for Public Managers. Wesport, Conn. : Quorum 1991.
2 Burgess, C. M., A Management Analysis and System Model of Development of Defense Acquisition Structure and Policy. Ph.D. Dissertation, State University of Florida,1998.
3 Nijkamp, P., Rietveld P., Voogd H., “Multicriteria Evaluation Physical Planning, North-Holland,” Amsterdam,1990.
4 Ramannathan, R. and Ganesh, L. S., “Using AHP for Resource Allocation Problems,” European Journal of Operation Research, Vol. 80, pp. 410-417,1995.
5 Su, C. W., “Developing a Project Ranking and Evaluation Model for Railroad Projects”, Ph.D. dissertation, National Taiwan University of Science and Technology,2004.
6 Dharmappa H. B.,”Water-Treatment – System Design for Turbidity Removal. I: Simulation”, Journal of Environmental Engineering, Vol. 120, No. 4, July/August 1994, pp. 900-920,1994.
7 Zhang X. L. and Zhang K. C., Using Genetic Algorithm to Solve a New Multi-period Stochastic Optimization Model, Journal of Computational and Applied Mathematics, Vol. 231, pp. 114-123,2009.
8 Ming-Der Yang and Tung-Ching Su,“An optimization model of sewerage rehabilitation.” Journal of the Chinese Institute of Engineers. 30(4), pp651-659,2007.
9 Moribayashi, M. and Wu, C. Y., “A Decision Support System for Capital Budgeting and Allocation.” Computers and Industrial Engineering, Vol. 19, pp. 524-528,1990.
10 Shohet, I. M. and Perelstein E., Decision Support Model for the Allocation of Resources in Rehabilitation Projects, Journal of Construction Engineering and Management, March/April, pp. 249-257,2004.
11 Kwak, N.K. and C. Lee, “A Multicriteria Decision-making Approach to University Resource Allocations and Information Infrastructure Planning.” European Journal of Operational Research, Vol. 110, pp.234-242,1998.
12 Kari Alanne, “Selection of renovation actions using multi-criteria 'knapsack' model.” Automation in Construction, Vol. 13, Issue 3, pp.377-391, May,2004.
13 Guan, X. G., Wu, J., and Gao, F., “Optimization-Based Generation Asset Allocation for Forwand and Spot Market”, Power Systems, IEEE Transactions on, Vol. 23, Issue 4,pp.1796-1808, 2008.
14 Aviad Shapira , Marat Goldenberg,”AHP-Based Equipment Selection Model for Construction Projects”,Journal of Construction Engineering and Management,Vol.131,No.12,pp.1263-1273,2005.
15 Kwak, N.K. and C. Lee, “A Multicriteria Decision-making Approach to University Resource Allocations and Information Infrastructure Planning,” European Journal of Operational Research, Vol. 110, pp.234-242,1998.
16 Charles J. Corbett, Frank J.C. Debets, Luk N. Van Wassenhove, “Decentralization of Responsibility for Site Decontamination Projects: A Budget Allocation Approach”,European Journal of Operational Research, Vol. 86, pp.103-119,1995.
17 Zheng D. X. M., Thomas Ng, S., and Kumaraswamy M. M., “Applying Pareto Ranking and Niche Formation to Genetic Algorithn-Based Multiobjective Time-Cost Optimization”, Journal of Construction Engineering and Management, Vol.131, pp. 81-91,2005.
18 Geem, Z. W.,”Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search”, Journal of Construction Engineering and Management, June, pp. 711-716,2010.
19 R. G. Cassidy,M. J. L. Kirby and W. M. Raike, “Efficient Distribution of Resources Through Three Levels of Government” , Management , Vol.17 , No.8 , pp.462-473,1971.
20Machine Hsie, Cheng-Han Huang, Chun-Yen Huang, Shu-Chien Hsu, “A Budget Allocation for Flood Management in Flood-Prone Areas” , Materials Engineers and Automatic Control II ,pp773-777,2013.
21曾國雄、蕭再安、鄧振源,「多評準決策方法之分析比較」,科學發展月刊,民國77年。22楊宏達,「道路養護工程預算分配模式之建構」,雲林科技大學營建工程所,碩士論文,民國96年。
23陳仁龍,「軍事投資最適化比例之研究」,國防管理學院國防決策科學研究所,碩士論文,民國90年。
24羅仕喬,「利用基因演算法進行單晶片網路架構之預設式備份路徑的容錯通訊」,國立成功大學電機工程學系,碩士論文,民國93年。
25吳昆恩,「公共工程預算之柏拉圖效率配置-以易淹水地區水患治理計畫為例」,中興大學土木工程學系,碩士論文,民國97年。
26俞偉武,「營建工程短期人力指派最佳化模式之研究」,中央大學土木工程學系,碩士論文,民國97年。
27張乃斌,「環境系統分析原理(上冊)(下冊)」,茂昌圖書有限公司,民國91年。
28黃濬彥,「重複性專案排程於多資源限制下之最佳化模式」,中興大學土木工程學系,碩士論文,民國97年。
29蔡秉寰,「資產配置之動態規劃」, 政治大學金融研究所,碩士論文,民國90年。
30張弘岳,「污水下水道管網系統最佳化水理設計之研究」,中興大學環境工程研究所,碩士論文,民國92年。
31陳明晏,「利用Pareto Front求解預拌車派送之最佳化排程」,朝陽科技大學營建工程系,碩士論文,民國97年。
32高強、高重光,「由資源分配提升多單位組織之整體效率」,中山管理評論,第2卷2期,18-28頁,民國83年。33陳志勇,「供應商於供給不足下供應方法之研究」,台灣大學商學研究所,碩士論文,民國88年。
34經濟部水利署水利規劃研究所,「區域排水整治及環境營造規劃參考手冊」,民國95年。
35 張齡方,「住宅區淹水損失之推估」,國立台灣大學農業工程研究所碩士論文,民國89年7月。36 經濟部水利署水利規劃研究所,「台南縣管區域排水龜子港排水系統規劃報告」,民國98年。