|
(1)Alfares, H. K., “Inventory model with stock-level dependent demand rate and variable holding cost”, International Journal of Production Economics, 108(1–2), pp. 259–265, 2007. (2)Baker, R. C. and Urban, T. L., “A deterministic inventory system with an inventory-level-dependent demand rate”, Journal of the Operational Research Society, 39(9), pp. 823–831, 1988. (3)Banerjee, A., “A joint economic-lot-size model for purchaser and vender”, Decision Sciences, 17, pp. 292–311, 1986. (4)Ben-Daya, M., As’ad, R. and Seliaman, M., “An integrated production inventory model with raw material replenishment considerations in a three layer supply chain”, International Journal of Production Economics, 143(1), pp. 53–61, 2013. (5)Chung, K.J., Chu, P. and Lan, S.P., “A note on EOQ models for deteriorating items under stock-dependent selling rate”, European Journal of Operational Research, 124 (3), pp. 550–559, 2000. (6)Chung, K. J. and Hou, K. L., “An optimal production run time with imperfect production process and allowable shortages”, Computers and Operations Research, 30, pp. 483–490, 2003. (7)Datta, T. K. and Pal, A. K., “A note on an inventory model with inventory-level-dependent demand rate”, Journal of the Operational Research Society, 41 (10), pp. 971–975, 1990. (8)Duan, Y., Li, G., Tien, J. M., and Huo, J., “Inventory models for perishable items with inventory level dependent demand rate”, Applied Mathematical Modeling, 36, pp. 5015–5028, 2012. (9)Dye, C. Y. and Ouyang, L. Y., “An EOQ model for perishable items under stock dependent selling rate and time-dependent partial backlogging”, European Journal of Operational Research, 163 (3), pp. 776–783, 2005. (10)Eroglu, A. and Ozdemir, G., “An economic order quantity model with defective items and shortages”, International Journal of Production Economics, 106 (2), pp. 544–549, 2007. (11)Giri, B.C., Pal, S. Goswami, A. and Chaudhuri, K.S., “An inventory model for deteriorating items with stock-dependent demand rate”, European Journal of Operational Research, 95 (3), pp. 604–610, 1996. (12)Glock, C. H., “A multiple-vendor single-buyer integrated inventory model with a variable number of vendors”, Computers & Industrial Engineering, 60, pp. 173–182, 2011. (13)Goh, M., “EOQ models with general demand and holding cost functions”, European Journal of Operational Research, 73, pp. 50–54, 1994. (14)Goyal, S. K., “An integrated inventory model for a single supplier-single customer problem”, International Journal of Production Research, 15(1), pp. 107–111, 1976. (15)Goyal, S. K., “A joint economic-lot-size model for purchaser and vendor: a comment”, Decision Sciences, 19, pp. 236–241, 1988. (16)Goyal, S. K. and Nebebe, F., “Determination of economic production-shipment policy for a single-vendor-single-buyer system”, European Journal of Operational Research, 121(1), pp. 175–178, 2000. (17)Gupta, R. and Vrat, P., “Inventory model with multi-items under constraint systems for stock dependent consumption rate”, Operations Research, 24, pp. 41–42, 1986. (18)Hill, R. M., “The single-vendor single-buyer integrated production-inventory model with a generalized policy”, European Journal of Operational Research, 97(3), pp. 493–499, 1997. (19)Hoque, M. A., “Synchronization in the single-Manufacturer multi-buyer integrated inventory supply chain”, European Journal of Operational Research, 188(3), pp. 811–825, 2008. (20)Huang, C. K., “An Optimal Policy for a Single-Vendor Single-Buyer Integrated Production-Inventory Problem with Process Unreliability Consideration”, International Journal of Production Economics, 91(1), pp. 91–98, 2004. (21)Kim, T., Honga, Y. and Chang, S. Y., “Joint economic procurement–production–delivery policy for multiple items in a single-Manufacturer multiple-retailer system”, International Journal of Production Economics, 103(1), pp. 199–208, 2006. (22)Konstantaras, I., Goyal, S. K. and Papachristos, S., “Economic ordering policy for an item with imperfect quality subject to the in-house inspection”, International Journal of Systems Science, 38 (6), pp. 473–482, 2007. (23)Lee, H. L. and Rosenblatt, M. J., “Simultaneous determination of production cycles and inspection schedules in a production system”, Management Science, 33 (9), pp. 1125–1136, 1987. (24)Lee, S. and Kim, D., “An optimal policy for a single-vendor single-buyer integrated production–distribution model with both deteriorating and defective items”, International Journal of Production Economics, 147(Part A), pp. 161–170, 2014. (25)Lu, L., “A one-vendor multi-buyer integrated inventory model”, European Journal of Operational Research, 81(2), pp. 312–323, 1995. (26)Maddah, B. and Jaber, M. Y., “Economic order quantity for items with imperfect quality: Revisited”, International Journal of Production Economics, 112(2), pp. 808–815. 2008. (27)Mandal, B. N. and Phaujdar, S., “An inventory model for deteriorating items and stock-dependent consumption rate”, Journal of the Operational Research Society, 40( 5), pp. 483–488, 1989. (28)Min, J. and Zhou, Y.-W, “A perishable inventory model under stock-dependent selling rate and shortage-dependent partial backlogging with capacity constraint”, International Journal of Systems Science, 40(1), pp. 33–44, 2009. (29)Padmanabhan, G. and Vrat, P., “EOQ models for perishable items under stock-dependent selling rate”, European Journal of Operational Research, 86(2), pp. 281–292, 1995. (30)Pando, V., García-Laguna, J. and San-José, L. A., “Optimal policy for profit maximising in an EOQ model under non-linear holding cost and stock-dependent demand rate”, International Journal of Systems Science, 43(11), pp. 2160–2171, 2012. (31)Paul, K., Datta, T. K., Chaudhuri, K. S., & Pal, A. K., “An inventory model with two-component demand rate and shortages”, Journal of the Operational Research Society, 47( 8), pp. 1029-1036, 1996. (32)Porteus, E. L., “Optimal lot sizing, process quality improvement and setup cost reduction”, Operations Research, 34(1), pp. 137–144, 1986. (33)Rosenblat, M. J. and Lee, H. L., “Economic production cycles with imperfect production processes”, IIE Transactions, 18(1), pp. 48–55, 1986. (34)Roy, M. D., Sana, S. S. and Chaudhuri, K., “An integrated producer–buyer relationship in the environment of EMQ and JIT production systems”, International Journal of Production Research, 50(19), pp. 5597–5614, 2012. (35)Sajadieh, M. S., Thorstenson, A. and Jokar, M.R.A., “An integrated vendor–buyer model with stock-dependent demand”, Transportation Research Part E: Logistics and Transportation Review, 46(6), pp. 963–974, 2010. (36)Salameh, M. K. and Jaber, M. Y., “Economic production quantity model for items with imperfect quality”, International Journal of Production Economics, 64(1), pp. 59–64, 2000. (37)Sarkar, B. and Sarkar, S., “An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand”, Economic Modeling, 30, pp. 924–932, 2013. (38)Sarkar, B., Cárdenas-Barrón, L. E., Sarkar, M. and Singgih, M. L., “An economic production quantity model with random defective rate, rework process and backorders for a single stage production system”, Journal of Manufacturing Systems, 33(3), pp. 423–435, 2014. (39)Silver, E. A. and R. Peterson, Decision Systems for Inventory Management and Production Planning, 2nd ed., New York: John Wiley & Sons, 1985. (40)Urban, T. L., “Inventory models with the demand rate dependent on stock and shortage levels”, International Journal of Production Economics, 40, pp. 21–28, 1995. (41)Urban, T. L., “Inventory models with inventory-level-dependent demand: A comprehensive review and unifying theory”, European Journal of Operational Research, 162, pp. 792–804, 2005. (42)Wee, H. M., Wang, W. T. and Yang, P. C., “A production quantity model for imperfect quality items with shortage and screening constraint”, International Journal of Production Research, 51 (6), pp. 1869–1884, 2013. (43)Wee, H. M., Yu J. and Chen, M. C., “Optimal inventory model for items with imperfect quality and shortage backordering”, Omega, 35 (1), 7–11, 2007. (44)Whitin, T. M., The Theory of Inventory Management, Princeton: Princeton University Press, 1957. (45)Wu, K. S. and Ouyang, L. Y., “(Q,r,L) Inventory model with defective items”, Computers & Industrial Engineering, 39, pp. 173–185, 2001. (46)Yang, C. T., “An inventory model with both stock-dependent demand rate and stock-dependent holding cost rate”, International Journal of Production Economics, 155, pp. 214–221, 2014. (47)Yang, J. S. and Pan, C. -H. J., “Just-in-time purchasing:An integrated inventory model involving deterministic variable lead time and quality improvement investment”, International Journal of Production Research, 42(5), pp. 853–863, 2004. (48)Yassine, A., Maddah, B. and Salameh, M., “Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model”, International Journal of Production Economics, 135(1), pp. 345–352, 2012. (49)Yoo, S. H., Kim, D. and Park, M. S., “Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return”, International Journal of Production Economics, 121(1), pp. 255–265, 2009
|