|
1.Abass, H.H., Bass, D.M., “The Critical Production Rate in water-coning System.” Paper SPE 17311, p.351-360, 1988. 2.Ahcene Benamara , Djebbar Tiab, “Gas Coning in Vertical and Horizontal Wells, a Numerical Approach.” Paper SPE 71026, 2001. 3.Ahmed, T., “Reservoir Engineering Handbook,” 2nd Edition, ISBN:0-88415-770-9, 2003. 4.Allard, D.R., Chen, S.M., “ Calculation of Water Influx for Bottomwater Drive Reservoirs.” Paper SPE 13170, p.369-379, 1988. 5.Bilhartz, H.L. and Ramey H.J., “The Combined Effects of Storage, Skin, and Partial Penetration on Well Test Analysis.” Paper SPE6753, 1977. 6.Bournazel, C. and Jeanson, B.:“Fast Water Coning Evaluation,”paper SPE 3628 presented at the SPE 46th Annual Fall Meeting, New Orleans, Oct. 3-6, 1971. 7.Chaney, P.E., Noble M.D., Henson, W.L., and Rice, T.D. “How to Perforate Your Well to Prevent Water and Gas Coning.” The Oil and Gas Journal, May 7, p108-114, 1956. 8.Chierici, C. L., Ciucci, G. M., and Long, G.:“A Systematic Study of Gas and Water Coning by Potentiometric Models.” JPT, August, 923-929, 1964. 9.CMG,2000.User’s Guide IMEX Advanced Oil/Gas Reservoir Simulator. Computer Modelling Group Ltd., Calgary,Aalberta Canada,746pp. 10.Ezuka, E.E. Onyekonwu, M.O., “Productivity Enhancement throught Single Well Numerical Modeling.” Paper SPE 88966, 2004. 11.Hagoort, “Water Coning.” P225-228, 1988. 12.Kuo, M.C.T., DesBrisay, C.L., “A Simplified Method for Water Coning Predictions.” Paper SPE 12067, 1983. 13.Lee, J.W.: “Well Testing,” Society of Petroleum Engineering of AIME, Dallas, Texas (1982). 14.Leif A. Hψyland, Statoil, Paul Papatzacos, Svein M. Skjaeveland, “ Critical Rate for Water Coning: Correlation and Analytical Solution.” Paper SPE 15855, p.495-502, 1989. 15.Meyer, H.L. and Garder, A.O., “Mechanics of two Immiscible Fluid in Porous Media,” Journal of Applied Physics, Vol. 25, No. 11, p.1400, 1954 16.Muskat, M, and Wyckoff, R. D.:“An Approximate Theory of Water-Coning in Oil Production,” Trans., AIME(1935)144-163. 17.Piper, L.D., Gonzalez Jr., F.M., Texas A and M U., “ Calculation of the Critical Oil Production Rate and Optimum Completion Interval.” Paper SPE 16206, p.235-242, 1987. 18.Recham R., Osisanya, S.O., “Effects of Water Coning on the Performance of Vertical and Horizontal Wells-A Reservoir Simulation Study of Hassi R’mel Field, Algeria.” Paper SPE65506, 2000. 19.Russell T. Johns, Larry W. Lake, Arnaud M. Delliste, “ Prediction of Capillary Fluid Interfaces During Gas or Water Coning in Vertical Wells.” Paper SPE 77772, 2002. 20.Schols, R.S., “An Empirical Formula for the Critical Oil Production Rate,” Erdoel Erdgas, Z., Vol. 88, No. 1, p.6-11, January 1972. 21.Sobocinski, “A Correlation for Predicting Water Coning Time.” SPE 894, 1964. 22.Wheatley, M.J., “An Approximate Theory of Oil/Water Coning.” Paper SPE 14210, 1985.
|