|
1.行政院主計處,中華民國統計年鑑,行政院主計處,1997。 2.林偉仁,D. H. Besterfield 「品質管制」Quality control,科技圖書股份有限公司,1989。 3.謝清佳、吳琮璠,「決策支援資訊系統與高階主管資訊系統」,資訊管理理論與實務,台北:智勝文化事業有限公司,1997。 4.陳瑞雄,「石化業動態抽驗作業的品質檢驗排程最佳化模型與決策支援系統之研究」,1999年11月。 5.Hogue, J. T. and H. J. Watson, ”Management’s Role in the Approval and Administration of DSS,” MIS Quarterly. 6.Johnson, S.M., “Optimal two-and three-stage production schedules with setup times included,“ Naval Research Logistics Quarterly, 1, pp.61-68, 1954. 7.Keen, P. G. W., and M. S. Scott Morton, Decision Support Systems, An Organizational Perspective. Reading, MA: Addison –Wesley, 1978. 8.Laudon, K.C. and J. P. Laudon, Management Information System: Organization and Technology, 4th, 1996. 9.Linet O., Bozyel, M. A., and S. I. Birbil, “ A hierarchical decision support system for production planning (with case study),“ European Journal of Operation Research, 104, pp.403-422, 1998. 10.Morton,M.S. and Gorry ,G.M.,”A Framework for Management Information Systems.” Sloan Management Review. (1971) 11.Palmer, D.S. , “Sequencing jobs through a multi-stage process in the minimum total time -a quick method of obtaining a near optimum Operational Research Quarterly , 16, 101-113(1965). 12.Sun , D. and L. Lim, “ A dynamic job shop scheduling framework : a backward approach , “ International Journal of Production Reaearch , 32(4), 967-985(1994). 13.Tailand , E. , “Europen Journal of Operational Research , 47,65-74(1990). 14.Van De Velde , S. L. , “ Minimizing the sum of job completion times in Operations Research , 26,257-268(1990)Wang , C. , C. Chu and J. M. Proch , “European Journal of Operation Research 96,636-644(1997)
|