[余朝權,1980] Lrvin H.Siegel,1980,“企業生產力的促進",余朝
權、劉樂安 譯,中國生產力中心
[方世榮,1991] William J.Stevenson,1991,“生產管理",初版,方
世榮 譯,曉園出版社有限公司
[李垣明,1995] Heinz Kohler,1995,“統計學", 李垣明、鄭天澤 譯,
五南圖書出版有限公司
[曾慧鶯,1983] Christopher Chatfield,1983,“科技統計學",曾慧
鶯、黃雄毅 譯,科技圖書股份有限公司
[余朝權,1996] 余朝權,1996,“生產力管理",初版,五南圖書出版
有限公司
[余朝權,1988] 余朝權,1988,“生產力系統設計與應用",初版,商
略印書館
[劉福勳,1998] 劉福勳,1998,“營建管理概論",五版,詹氏書局
[林惠玲,2000] 林惠玲、陳正倉,2000,“應用統計學",雙葉書廊有
限公司
[顏月珠,1992] 顏月珠,1992,“現代統計學",三民書局
[沈進發,2001] 沈進發,2001,“工程規劃與管制(基本實務)",二
版
[Rifat,1998] Rifat Sonmez and ames E.Rowings,1998,“Construction
labor productivity modeling with neural network " J.Constr.
Engrg.and Mgmt.,ASCE,124(6),498-504
[Sanvido , 1988] Sanvido, V.E.,1988, “ Conceptual construction
process model"J Constr.Engrg.and Mgmt.,ASCE,114(2),294-310
[Sanvido,1991] Sanvido,V.E.,and Paulson,B,C.,1991“Site analysis
using controller function chart " J.Constr.Engrg.andMgmt.,ASCE,117(2),226-241
[Sanvido,1992] Sanvido,V.E.,Francois Grobler,Kevin Parfitt ,Moris
Guvenis, and Michael Coyle,1992“Critical success factors for
Construction projects " J.Constr. Engrg.and Mgmt.,ASCE,118
(1),94-111
[Tarig,1999] Tarig S.A. and John G.,Everell, 1999,“Time series
analysis forconstruction productivity experiments "
J.Constr.Engrg.and Mgmt.,ASCE,125(2),87-95
[Thomas,1986] Thomas,H.R.,Mathews,C.T.,and Ward,J.G.,“Learning
curve models of construction productivity"J.Constr.Engrg.and
Mgmt.,ASCE,112(2),245-258
[Thomas,1987] Thomas, H.R., and Yiakoumis,I.,1987,“Factor model
pf construction productivity"J.Constr.Engrg.and Mgmt.,ASCE,113
(4),623-639
[Thomas,1989] Thomas, H.R., Sanvido, V.E., and Sanders, S.R.,1989,
“ Impact of material management on productivity "
J.Constr.Engrg.and Mgmt.,ASCE,115(3),370-384
[Thomas,1990] Thomas,H.R.,Maloney,W.F.,Smith,G.R.,Sanders.,S.R.,
Horner,R.M.W.,and Handa,V.K.,1990“Modeling construction labor
productivity"J.Constr.Engrg.and Mgmt.,ASCE,116(4),705-726
[Thomas,1991a] Thomas,H.R.,1991,“Labor productivity and Work
sampling:the bottom line " J.Constr.Engrg.and Mgmt.,ASCE,117
(3),423-444
[Thomas , 1991b] Sander,S.R.,and Thomas,H.R.,1991, “ Factor
affecting masonry-labor productivity " J. Constr. Engrg.and
Mgmt.,ASCE,117(4),626-644
[Thomas,1992] Thomas,H.R.,1992“Effects of scheduled overtime on
labor productivity"J.Constr.Engrg.and Mgmt.,ASCE,118(1),60-76
[Thomas , 1993] Sander, S.R., and Thomas, H.R.,1993, “ Masonry
productivity forecasting model " J.Constr.Engrg.and
Mgmt.,ASCE,119(1),163-179
[Thomas,1994] Thomas,H.R.,and Ahemt S Sakarcan,1994,“Forecasting
labor productivity using factor model " J.Constr.Engrg.and
Mgmt.,ASCE,120(1),228-239
[Thomas,1995] Thomas,H.R.,and Napolitan,C.L.,1995,“Quantitative
effects of construction Changes on labor productivity "
J.Constr.Engrg.and Mgmt.,ASCE,121(3),290-296
[Thomas , 1997] Thomas,H.R.,and Raynar,K.A.,1997, “ Scheduled
overtime and labor productivity:quantitative analysis"J.Constr
Engrg.and Mgmt.,ASCE,123(2),181-188
[Thomas,1999a] Thomas,H.R.,David,R.Riley,and Victor,E.Sanvido,
1999“,Loss of labor productuvuty due to delivery methods and
weather"J.Constr.Engrg.and Mgmt.,ASCE,125(1),39-46
[Thomas,1999b] Thomas,H.R.,and Ivica Zavrski,1999 “Construction
baseline productivity:theory and practice"J.Constr. Engrg.and
Mgmt.,ASCE,125(5),295-303
[Ronald , 2003] Ronald Gulezian and Frederic Samelian , 2003 ,
“Baseline Determination in Construction Labor Productivity-
Loss".,J.Constr.Engrg.and Mgmt.,ASCE,19(4),160-165
[Ashely,2001] Ashely Howlett and Daryl Walcroft,2001,“US method
to quantify disruption claims in HK"BCI Asia-Asia's Leading
Construction Information Service
[Smith] Smith Currie and Hancock LLP,“Measured Mile Analysis"
Government Performance or Breach 3662
[林建良,2001] 林建良,2001,“鋼構造基準生產力之研究",行政院
國家科學委員會研究報告,NSC89-2211-E327-013
[李文瑞,2001] 李文瑞,2001,“建立以生產力為基準之品質改善指標
研究",行政院國家科學委員會研究報告,NSC89-2213-E168-014
[彭雲宏,1999] 彭雲宏,1999,“營建生產力學習曲線預測模型之研
究",行政院國家科學委員會研究報告,NSC88-2211-E011-017
[周南山,2001] 周南山,2001,“高鐵南科段,何不採路堤",中國土
木水利工程學會,土木水利半月集(第九集)
[陳錦宗,2002] 陳錦宗,2002,“營建業的微笑曲線",現代營建(285)[朱明輝,2003] 朱明輝,2003,“陽明海運技效率與生產力之評估",
台灣經濟論衡
[劉福勳,2005] 劉福勳,2005,“營建業生產力之現況與展望",2005
年中華大學研究成果論文發表會
[陳俊杰] 陳俊杰、孫遜,“我國製造業生產力評估之研究"
[莊永寧,2001] 莊永寧,2001,“路堤填築可施工時間之探討-以第二高
速公路為例",國立台灣科技大學,碩士論文
[黃弘銘,2000] 黃弘銘,2000,“鋼構造基準生產力之研究",國立高
雄第一科技大學,碩士論文
[劉繼元,2005] 劉繼元,2005,“污水下水道用戶接管工程生產力評估
與影響因子之探討",國立高雄第一科技大學,碩士論文
[林錦伶,2005] 林錦伶,2005,“污水下水道用戶接管施工空間與生產
力的關係",國立高雄第一科技大學,碩士論文
[高公局,2004a] “中山高速公路員林至高雄拓寬大林新營段第531 標工
程特定條款",交通部台灣區國道高速公路局
[高公局b] “施工技術規範(一)一般工程",交通部台灣區國道高速公
路局
[高公局,2002c] “91 年工作年報",交通部台灣區國道高速公路局拓建
工程處
[高公局,2003d] “92 年工作年報",交通部台灣區國道高速公路局拓建
工程處
[高公局,2004e] “93 年工作年報",交通部台灣區國道高速公路局拓建
工程處
[工程會] “施工綱要規範,第2331 章基地及路堤填築",行政院公共工
程委員會