|
[1]Atmaca T., 1994, “Approximate analysis of a conveyor system”, International Journal of Production Research, Vol. 32, No.11, pp.2645-2655. [2]Bader, U., Besler, A., Schliesser, J., and Dorner, J., 1999, A view to the future – a modular simulation kit for cost-efficient fab-wide planning and the simulation of automated material handling systems in the semiconductor industry. 1999 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp.109-112. [3]Bozer, Y.A., and Hsieh, Y.J., 2005, “Throughput performance analysis and machine layout for discrete-space closed-loop conveyors”, IEEE Transactions on semiconductor manufacturing, Vol.37, pp.77-89. [4]Campbell, E., Wright, R., Cheatham, J., Schulz, M. and Berry, J.L., 2000, “Simulation modeling for 300mm semiconductor factories”, Solid State Technology, pp.95-106. [5]Campbell, P., and Laitinen. G. 1997. Overhead Intrabay Automation and Microstocking – a virtual fab case study. In Proceedings of the IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop, pp.368-372. [6]Campbell, P., and Norman.M. 1998. Microstocking and Fab Throughput. In Proceedings of the AutoSimulations '98 Symposium, pp.101--106. [7]Chang, I.H. and Tyan, J.C., 2001, “Development of a Vitural Fab Simulation Platform for 300mm fully automated wafer fabrication”, CIIE2001, pp.0058. [8]Chang, I.H., Perng, D.B., Chen, J.R. and Chung, S.H., 2001, “Object-Oriented Simulation Platform Construction for IC Fabs Modeling by Using SiMPLE++”, SMOMS, Seattle, [9]Chase, M., Scott, D. and Nestel-Patt, J., 2000, “The challenges of macro integration for fully automated 300mm fabs” , Solid State Technology, pp.52-64. [10]Fronckowiak, D., Peikert, A. and Nishinohara, K., 1996, “Using discrete event simulator to analyze the impact of job priorities on cycle time in semiconductor manufacturing”, Proceedings of IEEE/SEMI Advanced Semiconductor Manufacturing Conferences and Workshop, pp.151–155. [11]Hong, S., A. Johnson, H. Carlo, D. Nazzal and J. Jimenez. 2011. “Optimising the location of crossovers in conveyor-based automated material handling systems in semiconductor wafer fabs.” International Journal of Production Research, pp.1-28. [12]Hung, Y. F., Chen I.R., 1998, “A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabrication”, Production Planning & Control, Vol.9, No.7, pp714-722. [13]International SEMATECH, 2009, “ISMI 450mm Guidelines”, International SEMICON West, July 15th. [14]International SEMATECH., 1999,“300 mm Factory Layout and Material Handling Modeling: Phase I Report.”, International SEMICON West , Dec. [15]ITRS, 2005, International Technology Roadmap for Semiconductors 2005 Edition Executive Summary, [Online]. Available : http://www.itrs.net/Links/2005ITRS/Factory2005.pdf [16]ITRS, 2009, International Technology Roadmap for Semiconductors 2009 Edition Executive Summary, [Online]. Available: http://www.itrs.net/Links/2009ITRS/2009Chapters_2009Tables/2009_ExecSum.pdf [17]Johnson, A., Carlo, H.J., Jimenez, J.A., Nazzal, D. and Lasrado, V., 2009, “A GREEDY HEURISTIC FOR LOCATING CROSSOVERS IN CONVEYOR-BASED AMHS IN WAFER FABS”, IEEE Proceedings of the 2009 Winter Simulation Conference, pp.1688-1676. [18]Kim B I.. and Park J., 2009, “Idle vehicle circulation policies in a semiconductor FAB”, Journal of Intelligent Manufacturing, pp.709-717. [19]Kim BI, Jeong S, Shin J, et al, 2009, “A Layout- and Data-Driven Generic Simulation Model for Semiconductor Fabs”, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, Vol.22, Issue2, pp225-231. [20]Koo, P.H., Jang, J. and Shu, J., 2005, “Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first”, International Journal of Flexible Manufacturing Systems, Vol.17, pp.23-38. [21]Kuo,C.H., Huang,C.S., 2006, “Dispatching of overhead hoist vehicles in a fab intrabay using a multimission-oriented controller”, Int J Adv Manuf Technol, 27, pp824–832. [22]Lasrado V., Nazzal D. “DESIGN OF A MANUFACTURING FACILITY LAYOUT WITH A CLOSED LOOP CONVEYOR WITH SHORTCUTS USING QUEUEING THEORY AND GENETIC ALGORITHMS” Simulation Conference (WSC), Proceedings of the 2011 Winter [23]Li B, Wu J, Carriker W,Giddings R 2005, “Factory throughput improvements through intelligent integrated delivery in semiconductor fabrication facilities”, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, Vol.18, pp.222-231. [24]Liang SK, Wang CN (2005) Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing. Int J Adv Manuf Technol pp.645–652. [25]Liao DY, 2006, “A hybrid push/pull-dispatching rule for a photobay in a 300 mm wafer fab”, Robotics and Computer-Integrated Manufacturing, Vol.22, Issue1, pp47-55. [26]Liao D-Y, Fu H-S ,2004, “ Dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management”, IEEE Robot Automat Mag11(3), pp.22-32. [27]Liao,D.Y., Wang,C.N., 2006 “ Differentiated preemptive dispatching for automatic materials handling services in 300mm semiconductor foundry”, Int J Adv Manuf Technol, 29, pp.890–896. [28]Lin J. T., Huang C W (2011) A Novel Vehicle Assignment Method for Automated Material Handling System in semiconductor manufacturing. Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference Vol.3, pp.1627-1631. [29]Lin, J.T., Wang, F.K. and Wu, C.K., 2003, “Simulation Analysis of the Connecting Transport AMHS in a Wafer Fab”, IEEE Transactions on Semiconductor Manufacturing, pp.555-564., [30]Lin, J.T., Wang, F.K. and Yen, P.Y., 2001, “Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab”, International Journal of Production Research, , pp.1221-1238. [31]Miller L., Bradley A., Tish A., Jin T., Jimenez J.A., and Wright R.. “Simulating conveyor-based AMHS layout configurations in small wafer lot manufacturing environments,” in Proc. Winter Simulation Conference, 2011. [32]Narahari, Y. and Khan, L.M., 1997, “Modeling the effect of hot lots in semiconductor manufacturing systems”, IEEE Transactions on Semiconductor Manufacturing, Vol.10, No.1, pp.185-188. [33]Nazzal D., and El-Nashar A., 2007, “Survey of research in modeling conveyor-based automated material handling systems in wafer fabs”, In Proceedings of the 2007 Winter Simulation Conference. [34]Nazzal D., and Johnson A., 2008 , “AN ANALYTICAL MODEL FOR CONVEYOR BASED AMHS IN SEMICONDUCTOR WAFER FABS”, Proceedings of the 2008 Winter Simulation Conference. [35]Nazzal, D., Jimenez, J.A., Carlo, H.J., Johnson, A.L. and Lasrado, V., 2010, “An Analytical Model for Conveyor-Based Material Handling System With Crossovers in Semiconductor Wafer Fabs”, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, Vol. 23, No.3, pp.468-476. [36]Norman, M., Barksdale, J., Wiersholm, 1999, “Integrated Manufacturing and Material Handling Simulation Modeling” , Proceedings of the SIMULATION Solutions’99 Conference. [37]Paprotny, I., Shiau J-Y., Huh Y., and Mackulak G., 2000, “Simulation based comparison of semiconductor AMHS alternatives: continuous flow vs. overhead monorail” , In Proceedings of 2000 Winter Simulation Conference. [38]Pierce N. G. and Stafford R., 1994, “Modeling and simulation of material handling for semiconductor wafer fabrication,” in Proc. Winter Simulation Conf., pp. 900–906. [39]Pwttinato, J.S. and Pillai, D., 2005,“Technology Decisions to Minimize 4500mm Wafer Size Transition Risk” , IEEE TRANSCTIONS ON SEMICONDUCTOR MANUFACTURING, Vol.18, No.4, pp.501-509. [40]Roland, W., Christian, F., Fabian, B. and Martin, K., 2008, “Improved Empty Vehicle Balancing in Automated Material Handling Systems,” Proceedings of International Conference on Computer Modeling and Simulation,” pp. 732-733. [41]Schmidt, L.C., and Jackman J., 2000, “Modeling recirculating conveyors with blocking”, European Journal of Operational Research , pp.124:422-436. [42]Shikalgar S.T., MacNair E.A., 2003, “Application of Cluster Tool Modeling to a 300 mm Fab Simulation”, Proceedings of the 2003 Winter Simulation Conference , pp.1394-1397. [43]Shikalgar, S.T., MacNair, E.A., 2002, “300 mm Wafer Fabrication Line Simulation Model”, Proceedings of the 2002 Winter Simulation Conference, pp1365-1368. [44]Wang C N •Chen Li-Chin (2010) The heuristic preemptive dispatching method of aterial transportation system in 300mm semiconductor fabrication. J Intell Manuf DOI 10.1007/s10845-011-0531-7. [45]Wang CN, 2009, “The heuristic dispatching method of automatic matetial handing system in 300mm semiconductor fabrication”, International Journal of Innovative Computing Information and Control, vol.5,pp1927-1935. [46]Wang F.K., Lin J.T., 2004, “Performance evaluation of an automated material handling system for a wafer fab”, Robotics and Computer-Integrated Manufacturing, vol.20, pp.91-100. [47]Wang, C.N., Liao, D.Y., 2002, “Proiritized Automatic Material Handling Services in 300 mm Foundry Manufacturing”, IEEE 2002 Semiconductor Manufacturing Technology Workshop, pp109-114. [48]Wang, CN., Hsu, F.Y., 2010, “Analysis on the Differences between Conveyor and OHT in Production-A study of 450 mm Fab”, National Kaohsiung University of Applied Sciences, Master of Engineering in Industrial Engineering and Managemen. [49]Wein, L. M., 1988, “Scheduling semiconductor wafer fabrication”, IEEE Transactions on Semiconductor Manufacturing, Vol.4, No. pp. 77-82. [50]Wright, R., Shopbell, M., Rust, K. and Sigireddy, S., 2002, “Effects of Metrology Load Port Buffering in Automated 300mm Factories”, Proceedings of the 2002 Winter Simulation Conference, Vol.2, pp. 1359-1362.
|