[1] Potts, C. N. and Kovalyov, M. Y., “Scheduling with batch: A review,” European
Journal of Operational Research, Vol. 120, p. 228-249, 2000.
[2] Liao, C. J. and Liao, L. M., “Improved MILP models for two-machine flowshop with batch processing machines,” Mathematical and Computer Modelling, Vol. 48, p. 1254-1264, 2008.
[3] Mönch, L., Balasubramanian, H., Fowler, J. W., and Pfund, M. E., “Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times,” Computers & Operations Research, Vol. 32, p. 2731-2750, 2005.
[4] Ng, C. T., Cheng, T. C. E., and Liu, L. L., “Scheduling jobs with release dates on parallel batch processing machines,” Discrete Applied Mathematics, Vol. 157, p. 1825-1830, 2009.
[5] Melouk, S., Damodaran, P., and Chang, P. Y., “Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing,” International Journal of Production Economics, Vol. 87, p. 141-147, 2004.
[6] Luh, P. B., Wang, J. H., Wang, J. L., and Tomastik, R. N., “Near-Optimal Scheduling of Manufacturing Systems with Presence of Batch Machines and Setup Requirements,” CIRP Annals-Manufacturing Technology, Vol. 46, Issue. 1, p. 397-402, 1997.
[7] Qi, X. and Tu, F., “Earliness and tardiness scheduling problems on a batch processor,” Discrete Applied Mathematics, Vol. 98, p. 131-145, 1999.
[8] Sung, C. S. and Kim, Y. H., “Minimizing due date related performance measures on two batch processing machines,” European Journal of Operational Research, Vol. 147, p. 644-656, 2003.
[9] Jager-Waldau, A., “PV Status Report 2007-Research, Solar Cell Production and Market Implementation of Photovoltaics,” European Commission, DG JRC, Institute for Environment and Sustainability, Renewable Energies Unit Via Enrico Fermi 1, 2007.
[10] Chand, S., McClurg, T., and Ward, J., “A model for parallel machine replacement with capacity expansion,” European Journal of Operational Research, Vol. 121, p. 519-531, 2000.
[11] Moon, C., Lee, M., Seo, Y., and Lee, Y. H., “Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm,” Computers & Industrial Engineering, Vol. 43, p. 605-621, 2002.
[12] Chung S. H. and Huang H. W., “The block-based cycle time estimation algorithm for wafer fabrication factories,” International Journal of Industrial Engineering, Vol. 6, no. 4, p. 307-316, 1999.
[13] Ahmadi, J. H., Ahmadi, R. H., Dasu, S., and Tang, C. S., “Batching and scheduling jobs on batch and discrete processors,” Operations Research, Vol. 39, p. 750-763, 1992.
[14] Lee, C. Y., Uzsoy, R., and Martin-Vega, L. A., “Efficient algorithms for scheduling semiconductor burn-in operations,” Operations Research, Vol. 40, p. 764-775, 1992.
[15] Mehta, S. V., and Uzsoy, R., “Minimizing total tardiness on a batch processing machine with incompatible job families,” IIE Transactions, Vol. 30, p. 165-178, 1998.
[16] Damodaran, P., and Srihari, K., “Mixed integer formulation to minimize makespan in a flow shop with batch processing machines,” Mathematical and Computer Modelling, Vol. 40, p. 1465-1472, 2004.
[17] Hall, L. A., and Shmoys, D. B., “Approximation schemes for constrained scheduling problems,” Proceeding of the 30th Annual IEEE Symposium on Foundations of Computer Science, p. 134-139, 1989.
[18] Li, S. G., Li, G. J., and Zhang, S. Q., “Minimizing makespan with release times on identical parallel batching machines,” Discrete Applied Mathematics, Vol. 148, p. 127-134, 2005.
[19] Li, S. G., Li, G. J., and Zhang, S. Q., “Minimizing maximum lateness on identical parallel batch processing machines,” Computer Science, Vol. 3106, p. 229-237, 2004.
[20] Chung, S. H., Tai, Y, T., and Pearn, W. L., “Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes,” International Journal of Production Research, Vol. 47, No. 18, p. 5109-5128, 2009.
[21] Conway, R., Maxwell, W., and Miller, L. W., “Theory of Scheduling,” Addison-Wesley Publishing Company, Inc., 1967.
[22] 蘇昱彰,「新興晶圓代工廠生產規劃與排程系統之構建」,國立交通大學工業工程與管理學系,碩士論文,民過87年。[23] 溫伊蓁,「晶圓製造廠多工單等級之生產活動控制系統設計」,國立交通大學工業工程與管理學系,碩士論文,民國89年。[24] 李俊昇,「液晶面板組裝廠批量製程派工法則之設計」,國立交通大學工業工程與管理學系,碩士論文,民國92年。[25] 陳頌翔,「連續批量排程機制之構建—以薄膜液晶顯示器組立製程為 例」,國立交通大學工業工程與管理學系,碩士論文,民國95年。[26] 楊東錡,「晶圓針測廠考量針測卡資源限制下主生產排程系統之設計」,國立交通大學工業工程與管理學系,碩士論文,民國96年。[27] 趙媛婷,「印刷電路板製造廠主生產排程規劃系統之構建」,國立交通大學工業工程與管理學系,碩士論文,民國99年[28] 吳彥夆,「TFT-LCD組立廠於製程可選擇情境下主生產排程系統與可允諾機制之構建」,國立交通大學工業工程與管理學系,碩士論文,民國99年[29] 高薇婷,「以台灣半導體產業成功營運模式探討我國矽晶太陽能電池產業未來營運策略」,國立交通大學科技管理所,碩士論文,民國98年[30] 施華,「社區發展太陽能發電系統之成本效益評估」,國立交通大學工學院產業安全與防災學程,碩士論文,民國98年[31] 林柏均,「從資源依賴觀點看台灣薄膜太陽能電池產業發展前景」,國立清華大學工業工程與工程管理系,碩士論文,民國96年[32] 莊習武,「全球能源短缺下看台灣太陽能產業的契機」,國立清華大學工業工程與工程管理系,碩士論文,民國95年[33] 顏嘉德,「有機太陽能電池中烷基駢苯衍生物薄膜所受應力隨厚度紓解之研究」國立成功大學光電科學與工程研究所,碩士論文,民國97年[34] 顧絨瑛,「台灣太陽能電池產業分析」,國立中央大學產業經濟研究
所,碩士論文,民國98年
[35] 李建鳴,「應用模擬退火法於半導體批次作業製程之雙目標排程」,國立台北科技大學工業工程與管理系碩士班,碩士論文,民國95年。[36] 陳健智,「我國太陽能產業經營策略與績效關係之研究」,銘傳大學管理學院高階經理碩士學程,碩士論文,民國97年
[37] 吳銀泉,「太陽能電池產業發展模式與競爭策略-兩岸發展模式比較分析」,東海大學管理碩士在職專班,碩士論文,民國95年[38] 蔡進雄,「太陽能應用於營區崗哨照明之研究」,立德管理學院資源環境學系,碩士論文,民國94年[39] 王啟秀、孔祥科、左玉婷,「全球能源產業趨勢研究—以台灣太陽能光電產業為例」,中華管理評論國際學報,第十一卷三期,民國97年
[40] 楊森、楊淑慧、詹筱文,「太陽煉金術:透視全球太陽光電產業」,財訊出版社,2006年
[41] 經濟部能源局 http://www.moeaboe.gov.tw/
[42] 英國BP公司http://www.bp.com/
[43] 中華太陽能聯誼會http://www.solar-i.com/
[44] 茂迪股份有限公司http://www.motech.com.tw/
[45] 綠能科技股份有限公司http://www.getinc.com.tw/
[46] 益通光能科技股份有限公司http://www.e-tonsolar.com/
[47] 知光能源科技股份有限公司http://www.asectw.com/
[48] 工業技術研究院http://www.itri.org.tw/
[49] 台灣太陽光電產業協會http://www.tpvia.org.tw/
[50] 綠色能源產業資訊網http://www.taiwangreenenergy.org.tw/
[51] PIDA光電科技工業協進會http://www.pida.org.tw/
[52] IEK產業情報網http://iekweb3.iek.org.tw/iekppt/client/