[1] 周至如、彭榮芳、顏世雄,淡水線投捷主變電站ATS切換與號誌等設備受損事故調查報告,台北捷運公司事故調查報告,86年2月20日。
[2] A. Greenwood, Electrical Transients in Power Systems, 2nd ed., John Wiley, 1991.
[3] A. R. Hileman, Insulation Coordination for Power Systems, Marcel Dekker, 1999.
[4] 電力系統的過渡特性,台灣電力公司訓練所教材之27,郭耀宗編著,台電公司,第三版,民國73年。
[5] V. Brandwajn, H.W. Dommel and I. I. Dommel, “Matrix Representation of Three-Phase Transformers for Steady-State and Transient Studies”, Trans. IEEE, Vol. PAS101, 1982, pp.1362-1378.
[6] M. Krondl and A. Schleik, “Predetermination of Transient Voltages in Transformers Subject to Impulse Voltages,” Bulletin Oerlikon, No.342/343,1960, pp.114 —133.
[7] J. H. McWhirter, C. D. Fahnkopf, and J. H. Steele, “Determination of Impulse Stresses within Transformer Windings by Computer,” Trans. AIEE, Vol.75, Part, 1957, pp.1267-1274.
[8] E. P. Dick and W. Watson, “Transformer Models for Transient Studies Based on Field Measurements,” Trans. IEEE, Vol. PAS-100, 1981, pp. 409-419.
[9] G. Paillet and N.Dufour, “An Investigation of the Natural Frequencies and Surge Impedances of Transformer Windings,” CIGRE Report No. 109,1948.
[10] N. M. Tchernyshev, J. P. Schelglov, and G. A.Dorf, “Experimental Determination of Restriking Voltage on Circuit Breakers in Power Transformer Circuits. Some Data on Restriking Voltage at Interruption of Short Line Fault,” CIGRE Report No. 138, 1966.
[11] J. Lewis, B. M. Pryor, C. J. Jones, I. Irwin, L. C. Campbell, and A. Aked, “Disconnector Operations in Gas Insulated Substations-Overvoltage Studies and Tests Associated with a 420 kV Installation,” CIGRE Report 33.09,1988.
[12] P. Fourmarier, “On the Steep Fronted Overvoltages to which a Cable Connected 3-Phase Motor May be Subjected as a Result of Switching Operations,” Bull. Soc. France Electr., Vol. 3, 1953, p.447.
[13] R. E. Adjaye and K. J. Cornick, “Wave Propagation Characteristics of 3-Phase Distribution Cables,” Electric Power Appl., Vol. 2, 1979, pp. 1-11.
[14] T. H. Lee, “The Effect of Current Chopping in Circuit Breakers on Networks and Transformers, Part Ⅰ, Theoretical Considerations,” Trans. AIEE, Vol. 79,1960, pp. 535-544.
[15] A. N. Greenwood, “The Effect of Current Chopping in Circuit Breakers on Networks and Transformers, Part Ⅱ, Experimental Techniques and Investigations,” Trans. AIEE, Vol. 79, 1960, pp. 545.
[16] W. R. Wilson and L. L. Mankoff, “Short-Circuit Forces on Isolated-Phase Busses,” Trans. AIEE, Vol. 73, Part Ⅲ, 1954, p. 382.
[17] H. W. Dommel and I. I. Dommell, Transients Program User’s Manual, University of British Columbia, 1976, revised, 1986.
[18] T. W. Liao and T. H. Lee, “Surge Suppressors for the Protection of Solid-State Devices,” IEEE Trans. On Industry and General Applications, Vol. IGA-2, No.1, Jan./Feb. 1966, pp. 44-52.
[19] K. C. Lau and W. J. Lee, “Testing and Selecting Suppressors for Low-Voltage AC Circuit,” IEEE Trans. on Industry Application, Vol.26, No.6, 1990, pp. 975- 982.
[20] R.W. Crook, “Suppression of Transient Overvoltage on Instrumentation Wiring System,” IEEE Trans. on Industry Application, Vol.21, No.6, 1985, pp. 1517-1522.
[21] W. H. Lewis, “Recommended Power and Signal Grounding for Control and Computer Room,” IEEE Trans. on Industry Application, Vol. 21, No.6, 1985, pp. 1503-1516.
[22] R. H. Lee, “Grounding of Computer and Other Similar Sensitive Equipment,” IEEE Trans. on Industry Application, Vol.23, No.3, 1987, pp. 408-411.
[23] 蔡坤河,壹765kV系統雷擊突波之數位模擬,清大電機工程研究所碩士論文,71年5月20日。[24] 陳南鳴、顏世雄、楊金石,雷擊突波對數位電驛的影響,台灣電力公司委託合作研究計劃期末報告,80年12月。
[25] 陳在相、張建忠、廖順安、范振理、廖財昌、陳健賢,適用於電磁暫態程式之多抽頭套管式比流器模型(Ⅰ):模型推導與參數量測,台電工程月刊,第544期,第42-54頁。[26] 陳在相、張建忠、廖順安、范振理、廖財昌、陳健賢,適用於電磁暫態程式之多抽頭套管式比流器模型(Ⅱ):模型測試與應用,台電工程月刊,第545期,第37-57頁。[27] 廖順安、范振理,開關突波影響低壓電路之對策研究,台灣電力公司82年度研究發展專題報告,82年6月。
[28] 廖順安、范振理,電力系統用RTU之相關介面低壓回路突波保護協調研究分析與設計,台灣電力公司83年度研究發展專題報告,83年6月。[29] 廖順安、范振理、林安志、龔哲瑜、鍾金樹,變電所突波電壓對RTU之影響與策預防措施,台灣電力公司86年度研究發展專題報告,86年6月30日。
[30] Michael F. Stringfellow and Bruce T. Stonely,Coordination of Surge Suppressors in Low-Voltage AC Power Circuit, IEEE 1991 International Symposium on , 1991 , Page(s): 464 —468.
[31] 陳士麟,台北捷運木柵線動力變電站整流變壓器故障分析,台北捷運公司委託合作研究計畫期末報告,88年7月23日。
[32] 王棟樑,捷運供電系統與通訊系統間電力電磁干擾之研究,台灣科技大學電機工程研究所碩士論文,88年7月2日。[33] 陳士麟,淡水線供電系統161kV回路ATS自動切換開關突波量測分析及防制對策,台北捷運公司委託合作研究計畫期末報告,88年9月5日。