參考文獻
[1]江朋南,2003,蟻族系統在零工型排程問題之應用,國立台灣科技大學,碩士論文。[2]林熙凱,2005,蟻群演算法於非等效平行機台之多階段流程型排程問題研究,大葉大學,碩士論文。[3]徐誠佑,2002,螞蟻演算法求解零壹多限制式背包問題,國立清華大學,碩士論文。[4]陳明俊,2004,蟻群演算法於具非等效平行機台考量之排程問題研究,大葉大學,碩士論文。[5]張秀玲,2008,應用蟻群最佳化建構有限產能零工式排程決策支援系統之研究,世新大學,碩士論文。
[6]黃國凌,2004,螞蟻塔布混合演算法求解零工型排程問題,國立台灣科技大學,碩士論文。[7]練俊源,2003,平行機製程在資源限制下之排程問題,中原大學,碩士論文。[8]鍾承志,2004,多目標零工式平行機台排程之研究-應用蟻群最佳化演算法, 東海大學,碩士論文。[9]Andrea Rossi, Gino Dini, 2007, “Flexible job-shop scheduling with flexibility and separable setup times using ant colony optimization method”, ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, vol. 23, pp.503-516.
[10]A., Allahverdi and J., Mittenthal, Scheduling on M parallel machines subject to random breakdowns to minimize expected mean flow time, Naval Research Logistics, Vol. 41, No. 5, pp. 677-682, 1994.
[11]V., Bharadwaj, D., Ghose, V., Mani, T.G., Robertazzi, 1996, Scheduling divisible loads in parallel and distributed systems, IEEE Computer Society, New Jersey
[12]B.M.T. Lin, C.Y. Lu, S.J. Shyu, C.Y. Tasi 2008, “Development of new features of ant colony optimization for flowshop scheduling”, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, vol. 112, pp.742-755.
[13]J.F.Chen, Unrelated parallel machine scheduling with setups, Proceeding of the 5th annual international conference on industrial engineering theory, application and practice, 1-7 (2000).
[14]T.C.E.Cheng, Z.L., Chen, C.L., Li, 1996, Single-machine scheduling with trade-off between number of tardy jobs and resource allocation, Operations Research Letters, 19,237–242.
[15]Z.L.Chen, 2004, Simultaneous job scheduling and resource allocation on parallel Machines, Annals of Operations Research, 129, 135–153.
[16]Christian Blum, 2005, “Review: Ant colony optimization: Introduction and recent trends”, PHYSICS OF LIFE REVIEW, vol. 2, pp.353-373.
[17]Christian Blum, Student Member, IEEE, and Marco Dorigo, Senior Member, IEEE 2004, “The Hyper-Cube Framework for Ant Colony Optimization”, IEEE TRANSACTIONS ON SYSTEMS ,MAN, AND CYBERNETICS, vol. 34, No. 2.
[18]Daniels, R.L., Hoopes, B.J., Mazzola, J.B., 1996, Scheduling parallel cells with resource flexibility, Management Science, 42, 1260–1276.
[19]Daniels, R.L., 1990, A multi-objective approach to resource allocation in single machine scheduling, European Journal of Operational Research, 48, 226–241.
[20]Glass, C. A., Potts, C. N. and Shade, P., Unrelated parallel machine scheduling using local search, Mathematical and computer modeling, Vol. 20, No 2, pp.41-52, 1994.
[21]Hariri, A. M. A. and Potts, C. N., Heuristics for scheduling unrelated parallel machines, Computers and Operations Research, Vol. 18, No. 3, pp. 323-31, 1991.
[22]Janiak, A.,1998, Minimization of the makespan in a two-machine problem under given resource constraints, European Journal of Operational Research, 107, 325–337.
[23]Maheswaran, R., Ponnambalam, S.G., 2003, An investigation on single machine total weighted tardiness scheduling problems, International Journal of Advanced Manufacturing Technology, 22, 243–248.
[24]Oguz, C., Zinder, Y., Do, V.H., Janiak, A., 2004, Hybrid flow-shop scheduling problems with multiprocessor task systems, European Journal of Operational Research,152, 115–131.
[25]Suresh, V. and Chaudhuri, D., Minimizing maximum tardiness for unrelated parallel machines, International Journal of Production Economics, Vol. 34, No.2,pp. 223-239, 1994.
[26]Suresh, V. and Chaudhuri, D., Bicriteria scheduling problem for unrelated parallel machines, Computer and Industrial Engineering, Vol. 30, No. 1, pp. 77-82, 1996.
[27]Shabtay, D., 2004, Single and two-resource allocation algorithms for minimizing the maximal lateness in a single machine, Computers & Operations Research, 31, 1303–1315.
[28]Shabtay, D., Kaspi, M., 2006, Parallel machine scheduling with a convex resource consumption function, European Journal of Operational Research, 173, 92–107.