|
Bank, M., Fatemi Ghomi, S. M. T., Jolai, F., Behnamian, J. (2012). Two-machine flow shop total tardiness scheduling problem with deteriorating jobs. Applied Mathematical Modelling, 36, 5418–5426.
Baptiste, P., Carlier, J., Jouglet, A. (2004). A Branch-and-Bound procedure to minimize total tardiness on one machine with arbitrary release dates. European Journal of Operational Research, 158, 595-608.
Fisher, M. L. (1976). A dual algorithm for the one-machine scheduling problem. Mathematical Programming, 11, 229-251.
Kim, Y. D. (1993). A New branch and bound algorithm for minimizing mean tardiness in two-machine flowshops. Computers &; Operation Research, 20, 391-401.
Kim, Y. D. (1995). Minimizing total tardiness in permutation flowshops. European Journal of Operational Research, 85, 541-555.
Lee, W. C., Shiau, Y. R., Chen, S. K., Wu, C. C. (2010). A two-machine flowshop scheduling problem with deteriorating jobs and blocking. International Journal of Production Economics, 124, 188-197.
Moslehi, G., Khorasanian, D. (2013). Optimizing blocking flow shop scheduling problem with total completion time criterion. Computers &; Operation Research, 40, 1874-1883.
Pan, J. C. H., Chen, J. S., Chao, C. M. (2002). Minimizing tardiness in a two-machine flow-shop. Computers &; Operation Research, 29, 869-885.
Pan, J. C. H., Fan, E. T. (1997). Two-machine flow-shop scheduling to minimize total tardiness. International Journal of Systems Science, 28, 405-414.
Ronconi, D. P., Armentano, V. A. (2001). Lower bounding schemes for flowshops with blocking in-process. The Journal of the Operational Research Society, 11, 1289-1297.
Ronconi, D. P., Henriques, L. R. S. (2009). Some heuristic algorithms for total tardiness minimization in a flowshop with blocking. Omega, 37, 272-281.
Sen, T., Dileepan, P., Gupta, J. N. D. (1989). The two-machine flowshop scheduling problem with total tardiness. Computers &; Operation Research, 16, 333-340.
|