參 考 文 獻
1.Cullinane, M. J., 1989, ‘Determining availability and reliability for water distribution systems,’ Reliability analysis of water distribution systems, Mays, L. W., ed., ASCE, New York.
2.Crawley, P. and Dandy, G. C., 1993, ‘Optimal Operation of Multiple-Reservoir System’, J. Water Resour. Plng. and Mgmt., ASCE, 119(1), 1-7.
3.Dandy, G. C., Engelhardt, M., 2001, ‘Optimal Scheduling of Water Pipe Replacement Using Genetic Algorithms, ’ J. Water Resour. Plng. and Mgmt., 127(4), 214-223.
4.Giovanni, M. S, Paola, Z., 2008, ’Multiperiod Hypergraph Models for Water Systems Optimization,’ Journal of Water Resour Manage 22, 307-320.
5.Hobbs, B. F., 1985, ‘Reliability analysis of water system capacity,’ Hydraulics and hydrology in the small computer age, ASCE 1, New York. New Jersey, 341-346.
6.Hsu, N.-S. and Cheng, K.-W., 2002, ‘Network Flow Optimization Model for Basin Scale Water Supply Planning,’ J. Water Resour. Plng. and Mgmt., ASCE, 128(2), 102-112.
7.Kuczera, G., 1989, ‘Fast Multireservoir Multiperiod Linear Programing Models,’ Water Resources Research, 25(2), 169-176.
8.Keisler, A., Ormsbee, L., and Shaniir, U., 1990, ‘A methodology for least-cost design of invulnerable water distribution networks,’ Civ. Engrg. Sys., 7(1), 20-28.
9.Labadie J. W., 2004, ‘Optimal Operation of Multi reservoir Systems: State-of-the-Art Review,’ J. Water Resour. Plng. and Mgmt., ASCE, 130(2), 93-111.
10.Liu, D., Chen, X., Lou, Z., 2010, ’A Model for the Optimal Allocation of Water Resources in a Saltwater Intrusion Area:A case study in a pearl River Delta in China,’ Journal of Water Resour Manage, 24, 63-81.
11.Park, H., and Liebman, J. C., 1993, ‘Redundancy-constrained minimum-cost design of water-distribution nets,’ J. Water Resour. Plng. and Mgmt., ASCE, 119(1), 83-98.
12.Park, S., Jun, H., Kim B. J., Im, G. C., 2008, ’Modeling of Water Main Failure Rates Using the Log-linear ROCOF and the Power Law Process ,’ Journal of Water Resour Manage, 22, 1311-1324.
13. Reca, J., Martines , J, Gil, C., Banos , R. , 2008, ’Application of Several Meta-Heuristic Techniques to the Optimization of Real Looped Water Distribution Networks,’ Journal of Water Resour Manage, 22, 1367-1379.
14.Shamir, U., and Howard, C. D. D., 1981, ‘Water supply reliability theory,’ J. Am. Waterworks Assoc., 73, 379-384.
15.Shamir, U., and Howard, C. D. D., 1985, ‘Reliability and risk assessment for water supply systems,’ Proc., Spec. Conf. Comp. Applications in Water Resour., H. Tourno, ed., ASCE, New York, 1218-1228.
16.Su, Y.-C., Mays, L. W., Duan, N., and Lansey, K. E., 1987, ‘Reliability- based optimization model for water distribution systems,’ J. Hydr. Engrg., ASCE, 114(12), 1539-1556.
17.Sahoo, B., Lohani, A. K., Sahu, R. K., 2006, ’Fuzzy Multiobjective and Linear Programming Based Management Models for Optimal Land-Water-Crop System Planning,’ Journal of Water Resour Manage, 20, 931-948.
18.Tu, M. Y., 1996, Study on Surface Water Right By using optimal method, Ms. thesis, National Taiwan University.(in Chinese)
19.Tsai, J. X., 2003, Methodology and Application for a time step-by-step optimal method of multi-reservoir system with united operational simulated model, Ms. thesis, National Taiwan University.(in Chinese)
20.Tu, M.Y., Hsu, N.S., and Yeh, W.W-G., 2003, ‘Optimization of Reservoir Management and Operation with Hedging Rules,’ J. Water Resour. Plng. and Mgmt., ASCE, 129(2), 86-97.
21.Wagner, J. M., Shamir, U., and Marks, D. H., 1988, ‘Water distribution reliability: analytical methods,’ J. Water Resour. Plng. and Mgmt., ASCE, 114(3), 253-275.
22.Yang, S.-L., Hsu, N.-S., Louie, P. W.-F. and Yeh, W. W.-G., 1996, ‘Water Distribution Network Reliability: Connectivity Analysis,’ Journal of Infrastructure Systems, 2(2), 54-64.
23.Yang, S.-L., Hsu, N.-S., Louie, P. W.-F. and Yeh, W. W.-G., 1996, ’Water Distribution Network Reliability Stochastic Simulation,’ Journal of Infrastructure Systems, 2(2), 65-72.
24.Tung, C. P., S. Y. Hsu, C. M. Liu, and J. S. Li. 2003. ‘Applying Genetic Algorithm to Optimize Operation Rules for the LiYuTan Reservoir in Taiwan,’ Journal of American Water Resources Association, 39(3), 649~658.
25.Lee, J. J., C. S. Jang, C. W. Liu, C. P. Liang, S. W. Wang, ‘Determining the probability of arsenic in groundwater using a parsimonious model,’ Environmental Science & Technology.
26.Wu, M. Y. , Kuo, S. L. , Kuo, C. L., 2011 ’Optimal Design of Water Treatment Facilities Under Nonlinear Conditions with Uncertainty Based on Flexible Tolerance Concept,’ Environmental Engineering Science, 28(4), 275-282.
27.Yu, G. H., Chen, H. L. and Wen, W. C., 2002 ‘A Distribution-Free Method for Forcasting Non-Gaussian Time Series,’ Stochastic Environmental Research and Risk Assessment, 16 (2), 101-111.
28.林松青,吳瑞賢,陳世偉,2004,「雙標的水庫串聯系統最佳運轉機制之研究」,中國土木水利工程學刊,16(4),593-607。29.經濟部水利署,2004,「臺灣地區水資源總量管制機制規劃」。
30.經濟部水利署水利規劃試驗所,2004,提升台灣水資源台灣水資源運用效率之研究。
31.台灣省自來水股份有限公司,2004,台灣省自來水事業統計年報。
32.經濟部水利署水利規劃試驗所,2005,「北部地區水資源系統備用水源及管網之分析檢討」。
33.巨廷工程顧問股份有限公司,2004,「台灣地區水資源總量管制機制規劃—台灣地區水資源總量評估」。