跳到主要內容

臺灣博碩士論文加值系統

(216.73.216.240) 您好!臺灣時間:2026/06/14 02:25
字體大小: 字級放大   字級縮小   預設字形  
回查詢結果 :::

詳目顯示

我願授權國圖
: 
twitterline
研究生:黃任孝
研究生(外文):Ren-Xiao Huang
論文名稱:加分流裝置橋墩局部沖刷之研究
論文名稱(外文):Study on Local Scour around Bridge Pier with Diversion Device
指導教授:蘇重光
指導教授(外文):Chong-Guang Su
學位類別:碩士
校院名稱:逢甲大學
系所名稱:土木及水利工程研究所
學門:工程學門
學類:土木工程學類
論文種類:學術論文
論文出版年:2000
畢業學年度:88
語文別:中文
論文頁數:77
中文關鍵詞:橋墩局部沖刷分流裝置
外文關鍵詞:bridge pierlocal scourdiversion device
相關次數:
  • 被引用被引用:1
  • 點閱點閱:403
  • 評分評分:
  • 下載下載:0
  • 收藏至我的研究室書目清單書目收藏:0
橋墩周圍之局部沖刷,若藉由橋墩上之分流裝置而分流,使直接衝擊河床之向下射流量減小,則可有效地改善或控制橋墩周圍之刷深,進而維護橋樑之安全。本研究參酌Kikkawa學者之理論,配合橋墩加分流裝置之構想,設計出九種橋墩模型,在固定之渠床坡度(s=0.01)、水深(h=9.3 )及河床質(d50=0.75mm)下,變化五種水流條件,進行清水流沖刷試驗。試驗結果發現圓頭相切形橋墩加裝分流裝置後,確能更有效減緩橋墩附近之最大沖刷深度、沖刷坑體積及沖刷範圍,是較佳的橋墩型式。
The local scour around the bridge pier can be effectively mitigated or controlled, and in turn, the safety of the bridge may be enhanced if the bridge pier is equipped with a diversion device to lessen the impinging downflow. This study used part of the Kikkawa theory and the innovative diversion device which has nine types of models to conduct various clear-water hydraulic tests under the conditions of fixed channel slop (s=0.01), water depth (h=9.3) and bed material (d50=0.75mm). It is found that the diversion device which is attached to the round-nose pier with tapered body is the most effective design to mitigate the maximum scour depth, the scour hole volume and the range of scour around the bridge pier.
目 錄
頁次
符號說明 Ⅰ
中文摘要 Ⅲ
英文摘要 Ⅳ
表目錄 Ⅴ
圖目錄 Ⅵ
照片目錄 Ⅷ
壹、前言 1
貳、文獻回顧 2
2-1橋墩邊壁上加裝置之研究 2
2-2流經橋墩水流型態之探討 4
2-3過去橋墩局部沖刷之研究 6
參、理論分析 11
3-1沿壁沖射流理論 11
3-2加套環之橋墩沖刷理論 18
肆、渠槽試驗 20
4-1試驗目的 20
4-2試驗設備與佈置 20
4-3試驗步驟 26
伍、結果分析與討論 30
5-1清水流試驗中橋墩沖刷行為之觀察 30
5-1-1沖刷範圍與淤積堆之變化 30
5-1-2橋墩周圍泥砂顆粒之運移 31
5-2清水流況下動床沖刷之試驗結果 33
5-2-1試驗條件 33
5-2-2試驗結果與分析 34
5-2-3最大沖刷深度及沖刷坑體積之減緩效率 47
5-3套環裝置及分流裝置之效用 51
5-3-1套環裝置之效用 51
5-3-2分流裝置之效用 52
陸、結論與建議 63
6-1結論 63
6-2建議 65
參考文獻 66
參考文獻
1.丁振章,1983,橋墩沖刷控制之研究試驗,國立中興大學水土保持學
研究所碩士論文,第10頁至第43頁。
2.王燦汶,1968,橋墩周圍之沖刷研究,水利復刊第五期,第30頁至第37
頁。
2.林景輝,1993,圓柱形橋墩周圍局部沖刷之研究,私立逢甲大學土木及
水利工程研究所碩士論文,第67頁至第69頁。
4.陳正炎、李華寧,1986,變形橋墩之挾砂沖刷試驗研究,台灣水利季
刊,第三十四卷,第一期,第27頁至第42頁。
5.陸浩、高冬光,1991,橋樑水力學,人民交通出版社,第148頁至第150
頁。
6.國立中央大學災害防治研究中心,1999,橋台及橋墩沖刷防制工法之探
討研究報告,第4-6頁。
7.蔡文鎗,1989,圓柱形橋墩之沖刷研究,國立成功大學水利及海洋工程
研究所碩士論文,第93頁。
8.賴志豪、劉欽益、吳俊賢,1999,加套環之橋墩局部沖刷,私立逢甲大
學水利工程學系學士論文,第20頁至第29頁。
9.Baker, C. J., 1980,“Theoretical Approach to Predication of
Local Scour around Bridge Piers,”Journal of Hydraulic
Research, Vol. 18, No. 1, pp.1-12.
10.Batuca, D. and B. Dargahi, 1986,“Some Experimental Results
on Local Scour around Cylindrical Piers for Open and Covered
Flows,”3rd International Symposium on River Sedimentation,
April, pp.1095-1104.
11.Breusers, H. N. C. et al., 1977,“Local Scour around
Cylindrical Piers,”Journal of Hydraulic Research, Vol. 15,
pp.211-252.
12.Chiew, Y. M., and B. W. Melville, 1987,“Local Scour around
Bridge Piers,”Journal of Hydraulic Research, Vol. 25, No.
1, pp.15-26.
13.Ettema, R., 1980,“Scour at Bridge Piers,”School of
Engineering Report No. 216, Department of Civil Engineering,
University of Auckland, Auckland, New Zealand, 527pp.
14.Inglis, C. C., A. R. Thomas, and D. V. Joglekar, 1939,“The
Protection of Bridges Piers Against Scour,”Central
Irrigation and Hydrodynamics Research Station, Poona, India,
Research Publication, No. 2.
15.Jain, S. C., 1981,“Maximum Clear-Water Scour around
Circular Pier,”Journal of the Hydraulic Division, ASCE,
Vol. 107, No. Hy5, May, pp.611-626.
16.Klingeman, P. C., 1973,“Hydrologic Evaluations in Bridge
Pier Scour Design,”Journal of the Hydraulic Division, ASCE,
Vol. 99, No. Hy12, December, pp.2175-2184.
17.Laursen, E. M., 1960,“Scour at Bridge Crossings,”Journal
of the Hydraulic Division, ASCE, Vol. 86, No. Hy2, February,
pp.39-54.
18.Lu, P. C., 1973,“Introduction to the Mechanics of Viscous
Fluids,”the University of Nebraska-Lincoln, U.S.A., pp.167-
174.
19.Melville, B. W., 1992,“Local Scour at Bridge Abutments,”
Journal of Hydraulic Engineering, ASCE, Vol. 118, No. 4,
April, pp.615-631.
20.Melville, B. W., and Y. M. Chiew, 1987,“Local Scour around
Bridge Pier,”Journal of Hydraulic Research, Vol. 25, pp.30-
35.
21.Melville, B. W., and A. J. Raudkivi, 1977,“Flow
Characteristics in Local Scour at Bridge Piers,”Journal of
Hydraulic Research, Vol. 15, No. 4, pp373-380.
22.Melville, B. W., and A. J. Sutherland, 1988,“Design Method
for Local Scour at Bridge Piers,”Journal of Hydraulic
Engineering, ASCE, Vol. 114, No. 10, October, pp.1210-1226.
23.Raudkivi, A. J., 1986,“Functional Trends of Scour at Bridge
Piers,”Journal of Hydraulic Engineering, ASCE, Vol. 112,
No. 1, January, pp.1-13.
24.Raudkivi, A. J. and R. Ettema, 1983,“Clear-Water Scour at
Cylindrical Piers,”Journal of Hydraulic Engineering, ASCE,
Vol.111, No. 4, April, pp.713-731.
QRCODE
 
 
 
 
 
                                                                                                                                                                                                                                                                                                                                                                                                               
第一頁 上一頁 下一頁 最後一頁 top