AACE. (1997). "Recommended Practice No.17R-97 (1997): Cost Estimate Classification System." AACE, Inc.
Abidi, S. S. R., and Manickam, S. (2002). "Leveraging XML-based electronic medical records to extract experiential clinical knowledge: An automated approach to generate cases for medical case-based reasoning systems." International Journal of Medical Informatics, 68(1-3), 187-203.
Adeli, H., and Wu, M. (1998). "Regularization Neural Network for Construction Cost Estimation." Journal of Construction Engineering and Management, 124(1), 18-24.
Akinci, B., and Fischer, M. (1998). "Factors affecting contractors'' risk of cost overburden." Journal of Management in Engineering, 14(1), 67-76.
Akintola, A. (2000). "Analysis of factors influencing project cost estimating practice." Construction Management & Economics, 18(1), 77-89.
Al-Harbi, K. M. A.-S. (2001). "Application of the AHP in project management." International Journal of Project Management, 19(1), 19-27.
Al-Tabtabai, H., Alex, A. P., and Tantash, M. (1999). "Preliminary cost estimation of highway construction using neural networks." Cost Engineering (Morgantown, West Virginia), 41(3), 19-24.
Allez, Dauzats, Puggelli, Joubert, and Labat. (1988). "ERASME, An Expert System for Pavemernt Maintenance." Transportation Research Record 1205, 1-5.
Arioli, D. L., and Masi, J. G. (2002b). "Development and maintenance of a parametric building estimating system." Association for the Advancement of Cost Engineering, 33-37.
Birrell, G. S. (1980). "Construction Cost Estimating in the Design Process." American Society of Civil Engineers, Journal of the Construction Division, 106(4), 551-566.
Cavalieri, S., Maccarrone, P., and Pinto, R. (2004a). "Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry." International Journal of Production Economics, 91(2), 165-177.
Chang, P.-C., Lai, C.-Y., and Lai, K. R. (2006). "A hybrid system by evolving case-based reasoning with genetic algorithm in wholesaler''s returning book forecasting." Decision Support Systems, 42(3), 1715-1729.
Chantaraskul, S., and Cuthbert, L. G. (2005). "Congestion pattern matching in case-based reasoning control for 3G networks." 2, 134-141.
Cheng, M.-Y., and Ko, C.-H. (2003). "Object-Oriented Evolutionary Fuzzy Neural Inference System for Construction Management." Journal of Construction Engineering and Management, 129(4), 461-470.
Chou, J.-S., Peng, M., O’Connor, J. T., and Persad, K. R. (2005a). "Using Quantity Estimate Statistical Models for Infrastructure Long Range Cost Management." 1st International Conference on Construction Engineering and Management (ICCEM 2005), Seoul, Korea, 808-813.
Chou, J.-S., Peng, M., Persad, K. R., and O''Connor, J. T. (2006). "Quantity-based approach to preliminary cost estimates for highway projects." Transportation Research Record(1946), 22-30.
Chou, J.-S., Wang, L., Chong, W. K., and O''Connor, J. T. (2005b). "Preliminary Cost Estimates Using Probabilistic Simulation for Highway Bridge Replacement Projects." American Society of Civil Engineers, Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress, 939-948.
Chougule, R. G., and Ravi, B. (2005). "Variant process planning of castings using AHP-based nearest neighbour algorithm for case retrieval." International Journal of Production Research, 43(6), 1255-1273.
Creese, R. C., and Moore, L. T. (1990). "Cost modeling for concurrent engineering." Cost Engineering (Morgantown, West Virginia), 32(6), 23-27.
Delen, D., Walker, G., and Kadam, A. (2005). "Predicting breast cancer survivability: A comparison of three data mining methods." Artificial Intelligence in Medicine, 34(2), 113-127.
Dogan, S. Z., Arditi, D., and Gunaydin, H. M. (2006). "Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems." Journal of Construction Engineering and Management, 132(10), 1092-1098.
Duverlie, P., and Castelain, J. M. (1999). "Cost estimation during design step: Parametric method versus case based reasoning method." International Journal of Advanced Manufacturing Technology, 15(12), 895-906.
Elazouni, A. M., Nosair, I. A., Mohieldin, Y. A., and Mohamed, A. G. (1997). "Estimating resource requirements at conceptual design stage using neural networks." Journal of Computing in Civil Engineering, 11(4), 217-223.
Emsley, M. W., Lowe, D. J., Duff, A. R., Harding, A., and Hickson, A. (2002). "Data modeling and the application of a neural network approach to the prediction of total construction costs." Construction Management and Economics, 20(6), 465-472.
Ferens, D. V. (1988). "SOFTWARE PARAMETRIC COST ESTIMATION: WAVE OF THE FUTURE." Engineering Costs and Production Economics, 14(2), 157-164.
Gang, K. W. (2005). "Research planning approach using knowledge map integrated with case-based reasoning." II, 897-901.
Ge, Y. (1997). "Genetic Algorithms and Engineering Design (Book Review)." International Journal of Human-Computer Interaction, 9(4), 457-458.
Haas, C., and Shen. (1987). "PRESERVER,A Knowledge Based Pavement Maintenance Consulting Programme." 2nd North American Conference on Managing Pavement, 2.327-2.338.
Hajek, J., J., Chong, Phang, and Haas. (1987). "ROSE,A Knowledge-Based Expert System for Routing and Sealing." 2nd North American Conference on Managing Pavement, 2.301-2.313.
Han, S.-G., Lee, S.-G., and Jo, G.-S. (2005). "Case-based tutoring systems for procedural problem solving on the www." Expert Systems with Applications, 29(3), 573-582.
Harbuck, R. H. (2002). "Using Models in Parametric Estimating for Transportation Projects." AACE International Transactions, EST.05(ES51), EST.05.1-EST.05.09.
Hashem Al-Tabtabai, A. P. A., Maha Tantash. (1999). "Preliminary cost estimation of highway construction using neural networks." American Association of Cost Engineers, Vol.41(Iss. 3), pg. 19, 6 pgs
Hegazy, T., and Ayed, A. (1998a). "Neural Network Model for Parametric Cost Estimation of Highway Projects." Journal of Construction Engineering and Management, 124(3), 210-218.
Hemaya, and B., P. (1992). "Knowledge-Based Advisory System for Flexible Pavement Routine Maintenance," Memorial University of Newfoundland, Canada.
Hsu, Y.-Y., and Su, C.-C. (1991). "A rule-based expert system for steady-state stability analysis." IEEE Transactions on Power Systems, 6(2), 771-777.
Kim, G.-H., An, S.-H., and Kang, K.-I. (2004). "Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning." Building and Environment, 39(10), 1235-1242.
Kingsman, B. G., and de Souza, A. A. (1997). "Knowledge-based decision support system for cost estimation and pricing decisions in versatile manufacturing companies." International Journal of Production Economics, 53(2), 119-139.
Kwak, Y. H., and Watson, R. J. (2005). "Conceptual estimating tool for technology-driven projects: exploring parametric estimating technique." Technovation, 25(12), 1430-1436.
Lowe, D. J., Emsley, M. W., and Harding, A. (2006). "Predicting construction cost using multiple regression techniques." Journal of Construction Engineering and Management, 132(7), 750-758.
Marir, F., and Watson, I.(1995) "CBRefurb: case-based cost estimation." London, UK, 1-5.
Mendes, E., Mosley, N., and Counsell, S. (2002). "The application of case-based reasoning to early web project cost estimation." Institute of Electrical and Electronics Engineers Computer Society, 393-398.
Mendes, E., Mosley, N., and Counsell, S. (2005). "Exploring case-based reasoning for web hypermedia project cost estimation." International Journal of Web Engineering and Technology, 2(1), 117-143.
Morcous, G., Bakhoum, M. M., Taha, M. A., and El-Said, M. (2001a). "Preliminary Quantity Estimate of Highway Bridges using Neural Networks." Proceedings of the Sixth International Conference on the Application of Artificial Intelligence to Civil & Structural Engineering Computing, 51-52.
Niazi, A., Dai, J. S., Balabani, S., and Seneviratne, L. (2006). "Product Cost Estimation: Technique Classification and Methodology Review." Journal of Manufacturing Science and Engineering, 128(2), 563-575.
Oberlender, G. D., and Trost, S. M. (2001). "Predicting accuracy of early cost estimates based on estimate quality." J. Constr. Eng. Manage., 127(3), 173-182.
Ou-Yang, C., and Lin, T. S. (1997). "Developing an integrated framework for feature-based early manufacturing cost estimation." International Journal of Advanced Manufacturing Technology, 13(9), 618-629.
Pelletier, J.-M., and Boyer, A. (1993). "SESA an expert system for auxiliary power services design." Institute of Electrical and Electronics Engineers Computer Society, 375-378.
Phaobunjong, K., and Popescu, C. M. (2003). "Parametric Cost Estimating Model for Buildings." AACE International Transaction, EST.13.1-EST.13.11.
Ritchie, S. G. (1987). "EXPERT SYSTEMS IN PAVEMENT MANAGEMENT." Transportation Research, Part A: General, 21A(2), 145-152.
Rush, C., and Roy, R. (2000). "Analysis of Cost Estimating Processes Used Within a Concurrent Engineering Environment throughout a Product Life Cycle." 7th ISPE International Conference on Concurrent Engineering: Research and Applications, 58-67.
Salzberg, S. L. (1997). "On Comparing Classifiers: Pitfalls to Avoid and a Recommended Approach." Data Mining and Knowledge Discovery, 1, 317–327.
Sanders, S. R., Maxwell, R. R., and Glagola, C. R. (1992). "Preliminary estimating models for infrastructure projects." Cost Engineering (Morgantown, West Virginia), 34(8), 7-13.
Schexnayder, C. J., Weber, S. L., and Fiori, C. (2003). "Project Cost Estimating: A Synthesis of Highway Practice." National Cooperative Research Program, Transportation Research Board.
Sthapit, N., and Mori, H. (1994). "Model to Estimate Highway Earthwork Cost in Nepal." Journal of Transportation Engineering, Vol. 120(No. 3), 498-504.
Thomasson, B. J., Ratcliffe, M. B., and Thomas, L. A. (2006). "Improving the tutoring of software design using case-based reasoning." Advanced Engineering Informatics, 20(4), 351-362.
Toussaint, J., and Cheng, K. (2006). "Web-based CBR (case-based reasoning) as a tool with the application to tooling selection." International Journal of Advanced Manufacturing Technology, 29(1-2), 24-34.
Wang, H.-C., and Hsieh, P.-F. (2005). "Parametric weight estimation for decision fusion in multisource classification." Institute of Electrical and Electronics Engineers Computer Society, 6, 3909-3912.
Wang, S. L., and Hsu, S. H. (2004). "A web-based CBR knowledge management system for PC troubleshooting." International Journal of Advanced Manufacturing Technology, 23(7-8), 532-540.
Wang, W.-C. (2002). "SIM-UTILITY: Model for Project Ceiling Price Determination." Journal of Construction Engineering and Management, 128(1), 76-84.
Wilmot, C. G., and Cheng, G. (2003). "Estimating future highway construction costs." Journal of Construction Engineering and Management, 129(3), 272-279.
Wu, J.-G., Hu, Y. H., Ho, W. P. C., and Yun, D. Y. Y. (1990). "A model-based expert system for digital system design." IEEE Design & Test of Computers, 7(6), 24-40.
Yu, W.-D. (2006). "PIREM: A new model for conceptual cost estimation." Construction Management and Economics, 24(3), 259-270.
Yu, W.-D., and Liu, Y.-C. (2006). "Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases." Automation in Construction, 15(1), 33-46.
Zhu, F., Guan, J., Wang, Y., Zhou, J., and Liao, B. (2005). "An automatic negotiation method based on CBR and agent reasoning." Institute of Electrical and Electronics Engineers Computer Society, 2005, 1019.
中華民國統計資訊網. (2007). "營造工程物價指數下載網頁" http://www.sta.gov.tw/ct.asp?xltem=767&ctNode.htm.
交通部. (2003). 公路養護手冊.
江孟峰, 曾憲雄, 黃國禎, 蔡昌均, and 林耀聰. (2002). 專家系統導論工具應用, 松崗文魁, 台北市.
行政院公共工程委員會. (1998). 公共建設工程經費估算編列手冊.
林純貞. (2006). "公共工程動態網頁資料庫之管理、維護系統研究." 碩士論文, 淡江大學土木工程學系.張家瑞. (2002). "建立台灣地區瀝青路面網級養護管理系統-以公路局中壢工務段為例." 博士論文, 國立中央大學土木工程研究所黃書猛. (2002). "機場鋪面維修系統建立之研究." 博士論文, 國立中央大學土木工程研究所.劉同敏. (1996). "剛性鋪面診斷維修專家系統之建立." 碩士論文, 國立中央大學土木工程研究所.